Skip to the record
Search everything, all in one place.

Original source · versioned page text

2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101

of 101

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               19 AUGUST 2014



The main change that commenced on 1 July 2014 is that Council no longer includes the Water
Supply and Sewerage components in its charge notice issued to the applicant. Instead, the
applicant will now be issued with 2 notices, one from Council and another from Unitywater in
relation the infrastructure network owned by the entity.

Although the current apportionment agreement continues as the breakup agreement, it was
originally anticipated that the adopted charges regime would only be short lived whereby charges
would eventually revert back to linking with the actual cost of providing trunk infrastructure for
each specific network.

The current charges apportionment (breakup) agreement is quite complicated having 12 different
apportionment percentages dependant on the development type and location together with 2
charge reductions (20% per network) should the development not be serviced with either Water
and/or Sewerage.

With the adopted charges system now continuing, and with separation of charge notices issued
by Council and Unitywater, a number of inconsistencies in charges pertaining to different areas
will become evident. For example, Council’s current charge pertaining to its networks for a 3
bedroom dwelling in different areas is shown in the following table:

                  Council Adopted Charge Component for a 3 bedroom dwelling
                                                                                 No Water or
           Location                  All networks         No Sewerage
                                                                                  Sewerage
 Coastal Area (excluding Marcus
                                       $17,920               $14,336
 & Peregian Beaches)
 Marcus & Peregian Beaches             $14,280               $11,424
                                                                                   $16,800
 Cooroy, Pomona                        $11,760                $9,408
 Cooran                                                       $9,408
 Boreen Point, Kin Kin

A suggestion is to simplify the apportionment to a whole of shire area basis using a PIP weighted
averaged demand approach to the 4 development categories according to development type only
and to do away with the reduction factor where Water and/or Sewerage is not supplied.




                                                                                  Page 43 of 155
Log in to download the original file

2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.