Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101

of 101

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 82 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                     19 AUGUST 2014

                               b)    Category 4 lots — vegetation to be retained as part of a property vegetation
                                     management plan                                                                        ~
                                                                                                                        Cs
                               Protected Vegetation Overlay Area applies to the whole of the planning scheme            & S
                               area of the Noosa Plan.                                                                  Os
                                                                                                                        of
                               pruning has the meaning given in the AS 4373-2007 Pruning of Amenity Trees.              3 §
                                                                                                                            wal
                               reasonably necessary means vegetation clearing for a particular purpose where            Ss &
                               there is no alternative way of achieving the purpose that is prudent and feasible and    ® 3
                               that would avoid clearing or significantly reduce the extent of vegetation clearing.   Rw 3
                                                                                                                        Mm &
                               regrowth means any vegetation that is less than seven (7) years of age.                      *
                               sequential clearing means—
                               a)    a method of clearing trees whereby felling operations are conducted in discrete
                                     stages such that wildlife is provided sufficient time and space to enable them to
                                     move from the clearing site of their own volition without the need for human
                                     intervention to remove or relocate them; and
                               b)    the felling of limited numbers of trees at any one time at the clearing site and
                                     not clearing where native wildlife is present; and
                               Cc)   not the clearing of all trees on site in a single, uninterrupted operation.

                               topping means reducing the height of a tree through the practice of lopping (AS 4373-
                               2007 Pruning of Amenity Trees)

                         Division 3—        Assessment table for the Biodiversity Overlay
                      13.3.    Assessment categories for the Biodiversity Overlay

                      13.3.1   The assessment category for development on land subject to the Biodiversity Overlay
                               is identified in column 2 of Table 13.1 as follows—
                               a)    Making a material change of use;
                               b)    Carrying out building work not associated with a material change of use;
                               Cc)   Carrying out building work not associated with a material change of use if
                                     relocation or removal of a building;
                              d)     Carrying out operational work; or
                               e)    Reconfiguring a lot.

                                                                  13-5
                                                            Biodiversity Overlay

                                                                                                         Page 82 of 155
Log in to download the original file

2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.