Original source · versioned page text
2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 19 AUGUST 2014
Page 82 of 155
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 19 AUGUST 2014
b) Category 4 lots — vegetation to be retained as part of a property vegetation
management plan ~
Cs
Protected Vegetation Overlay Area applies to the whole of the planning scheme & S
area of the Noosa Plan. Os
of
pruning has the meaning given in the AS 4373-2007 Pruning of Amenity Trees. 3 §
wal
reasonably necessary means vegetation clearing for a particular purpose where Ss &
there is no alternative way of achieving the purpose that is prudent and feasible and ® 3
that would avoid clearing or significantly reduce the extent of vegetation clearing. Rw 3
Mm &
regrowth means any vegetation that is less than seven (7) years of age. *
sequential clearing means—
a) a method of clearing trees whereby felling operations are conducted in discrete
stages such that wildlife is provided sufficient time and space to enable them to
move from the clearing site of their own volition without the need for human
intervention to remove or relocate them; and
b) the felling of limited numbers of trees at any one time at the clearing site and
not clearing where native wildlife is present; and
Cc) not the clearing of all trees on site in a single, uninterrupted operation.
topping means reducing the height of a tree through the practice of lopping (AS 4373-
2007 Pruning of Amenity Trees)
Division 3— Assessment table for the Biodiversity Overlay
13.3. Assessment categories for the Biodiversity Overlay
13.3.1 The assessment category for development on land subject to the Biodiversity Overlay
is identified in column 2 of Table 13.1 as follows—
a) Making a material change of use;
b) Carrying out building work not associated with a material change of use;
Cc) Carrying out building work not associated with a material change of use if
relocation or removal of a building;
d) Carrying out operational work; or
e) Reconfiguring a lot.
13-5
Biodiversity Overlay
Page 82 of 155See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.