Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101

of 101

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 88 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                    19 AUGUST 2014

                                      column 1                                       ee) (a4
                                  Specific outcomes                  Probable solutions (if code assessable)             ~
                           pollutants; and                              development is located outside the            & Ss
                     g)    removing undesirable plant species and       riparian zone and setback a suitable         x =
                           replacing them with vegetation of local      distance from the watercourse having         a 2
                          origin;                                       regard to the development constraints of      Os
                                                                        the property and the need to protect          C &
                                                                        environmental and riparian values;            O&
                                                                   OR                                                = &
                                                                   $5.3 For Animal husbandry on premises in           ® 3
                                                                   the Rural Zone—                                   <3
                                                                   a) — stock proof fencing is installed along        HK &
                                                                         watercourses at a distance of no less
                                                                        than 10m from the top of the bank;
                                                                   b) — stock watering points are located no less
                                                                        than 15m away from the top of the bank
                                                                        of watercourses; and
                                                                   Cc)  stock crossing points across
                                                                        watercourses are defined and controlled
                                                                        with stock proof fencing,
                                                                        to prevent stock from damaging riparian
                                                                        vegetation or banks to watercourses;
                                                                   OR
                                                                   $5.4 Recreational facilities (including
                                                                   playgrounds, pergolas, barbeques etc) are
                                                                   setback a minimum of 30m from the top of the
                                                                   bank of a watercourse and 10m from the top of
                                                                   the bank of a drainage line;
                                                                   OR
                                                                   $5.5 For Forestry uses the cultivated area is
                                                                   separated from watercourses by a distance not
                                                                   less than the distances identified below,
                                                                   measured from high water mark or the top of
                                                                   the bank, whichever is the greater distance—
                                                                              Feature             Distance
                                                                    Stream order 1 or 2             5m
                                                                    Stream order 3 or 4             10m
                                                                    Stream order greater than 4     20m

                                                                   AND
                                                                   $5.6  Where Forestry is carried out on that
                                                                   part of premises indicated as Riparian Buffer
                                                                   Area and outside the separation distances
                                                                   specified in S5.5—
                                                                   a)   species planted are of /ocal origin and are
                                                                        harvested through sustainable harvesting;
                                                                        and
                                                                   b)   any undesirable plant species are
                                                                        replaced by vegetation of local origin.
                     Managing public access and edge effects
                     O6 Development on land adjacent to a          $6.1 Development adjacent to a waterway or
                     waterway or wetland maintains an appropriate | Wetland provides that—
                     extent of public access to waterways and      a)    no new lots directly back onto the
                     wetlands and minimises edge effects.                riparian area; and
                                                                   b)    new public roads are located between
                                                                        the riparian buffer and the proposed

                                                                13-11
                                                           Biodiversity Overlay

                                                                                                       Page 88 of 155
Log in to download the original file

2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.