PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 19 AUGUST 2014
Page 91 of 155
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 19 AUGUST 2014
column 1 column 2
+ Specific outcomes Probable solutions (if code assessable)
o S | Filling and excavation
o = | 015 Vegetation is not adversely impacted No solution provided.
“2 | upon by earthworks and changes to the
& € | hydrological regime, including changes to
Oo § | ground water levels, flooding levels, run-off
Oo 8 and tidal hydraulics.
<< [13.10 Vegetationmanagement [|
® 8 Replanting and rehabilitation
< S 016 Development provides for ecologically $16.1 Landscaping and rehabilitation
@ | important areas to be restored and enhanced | complements and supports ecologically
through the following measures— important habitats by—
a) __ siting landscaped areas to complement | a) utilising native plants of /ocal origin;
and enhance existing vegetation; — ; . .
b) removal of all species likely to displace b) utilising suitable plant species identified
native flora species or degrade fauna in PSP3 — Landscaping Plants and
habitat; Guidelines;
. ee ae 16
¢) replanting and rehabilitating“ degraded | ¢) replicating adjacent remnant habitats,
habitat; and . . including understorey vegetation;
d) replacing any vegetation removed with } oo
suitable replacement vegetation of joca/ | 4) creating or enhancing linkages between
origin. existing habitats;
e) avoiding the use of undesirable plant
species listed in Table 9.1 of PSP3
Landscaping Plants and Guidelines; and
f) planting riparian zones to filter
stormwater run-off and provide for wildlife
habitat;
AND
$16.2 Vegetation removed is replaced with—
a) the equivalent number of trees or plants
of local origin; or
b) twice the number of trees or plants of
local origin.
Fire management
O17 Fire management measures are adopted | No solution provided
based on ecological principles, which—
a) maintain and enhance biodiversity;
b) — minimise threat of fire to the natural
environment, life and property; and
Cc) provide for effective use and
maintenance of buildings and structures.
Clearing protected vegetation in the
protected vegetation overlay area
018 Clearing protected vegetation does not No solution provided
involve—
a) the removal of vegetation in
ecologically important areas;
b) removal of vegetation or habitat
for fauna identified or referred to
as requiring protection in State
or Commonwealth legislation;
"8 Revegetation and rehabilitation works are to be carried out in accordance with an approved Revegetation and
Rehabilitation Management Plan, as referred to in PSP18 Ecological Assessment Guidelines
13-14
Biodiversity Overlay
Page 91 of 155See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.