Original source · versioned page text
SUPERSEDED Approved Plans MCU21/0110.pdf
-
APPROVED PLAN
SITE BOUNDARY
MCU21/0110
NOOSA COUNCIL 2
15 MAY 2025 DA3.01
1
DA3.02
1
39620
P4
37550
RF1
35650 36180 P3 FIN1
P2 P2
34200
RF1
RL 35.10
Level 3
RL 31.90 BAL1
Level 2
FIN1
P4 - Assumed NGL
RL 28.70
31500 under roof ridge
FIN1 line
LEVEL 1 FIN1
ROL P4 - Assumed NGL
30500 under roof ridge
RL 25.50 line
GROUND LEVEL
RL 22.30
LOWER GROUND
P3 - Assumed NGL
25650 under roof ridge
P2 - Assumed NGL line
RL 19.50 NGL 23700 under roof ridge
BASEMENT line
P2 - Assumed NGL
21250 under roof ridge
line
AW1
RL 14.60
Level 1 RL 13.75
ENTRY LINK LEVEL
RL 12.00
Ground Floor
SOUTH ELEVATION
1
1 : 200
LEGEND
ID DESCRIPTION
AW1 AWNING EXTENSION TO MATCH
EXISTING
AW2 GLAZED AWNING
BAL1 COMBINED SOLID & ALUMINIUM
1
ANGLE BALUSTRADE
DA3.01 FIN1 RENDERED CONCRETE
FIN3 NATURAL STONE WALL
1
RF1 TERRACOTTA TILE ROOF
ROL ROLLER SHUTTER DOOR
37550
P3
36180
35650 MINOR CHANGE REGISTER
P2
33690 PAVILION 5 DELETED. LIFT AND STAIR
RL 35.10
1 RECONFIGURED
P1 TERRACE SIZES REDUCED ON
2 GROUND LEVEL.
Level 3
RL 31.90 3 NOT USED.
Level 2
PRESIDENTIAL SUITE CHANGED TO 2 x
RF1 4 DELUXE ROOMS.
RL 28.70
5 CAR PARK SHADING HEIGHT REDUCED.
LEVEL 1
FIN1 FIN1 6 TENNIS COURT SIZE INCREASED.
RL 25.50 BAL1
GROUND LEVEL
7 AMENITIES BUILDING SIZE INCREASED.
6 8 LANDSCAPE DESIGN UPDATED BY PDG.
RL 22.30 P3 - Assumed NGL 25650
LOWER GROUND under roof ridge line
RL 19.50 FIN3 P2 - Assumed NGL
BASEMENT 21250under roof ridge line
P1 - Assumed NGL 21500
under roof ridge line AW2
RL 14.60
Level 1 RL 13.75
ENTRY LINK LEVEL
RL 12.00 WEST ELEVATION
2
Ground Floor 1 : 200
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
NOOSA SPRINGS REAL ESTATE PTY
3 25/09/20 DA APPROVAL ST
SOUTH & WEST ELEVATION
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 4 09/10/20 DA APPROVAL REVISED ST
LTD
be brought to the attention of the Architect. Larger scale 5 14/10/20 DA APPROVAL REVISED ST
drawings and written dimensions take preference. This 6 04/11/20 COUNCIL PRESENTATION ST
drawing is copyright and the property of the author, and must 7 01/12/20 DA APPROVAL REVISED ST
Marchese Partners International Pty Ltd
not be retained, copied or used without the express authority 8 12/11/21 RFI ST
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 9 04/03/22 DA REVISED DESIGN ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
10 13/04/22 REVISED DESIGN BY P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
11 21/04/22 UPDATED DA DRAWINGS BY
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL
As indicated @A1
FOR APPROVAL
12 09/02/23 UPDATED DA DRAWINGS LC 06/02/25 AB BY
13 20/09/24 FOR COORDINATION LC Sydney · Brisbane· Melbourne · Adelaide
14 17/10/24 FOR COORDINATION LC Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION
15 07/11/24 MINOR CHANGE LC 0 5 10
NOT FOR CONSTRUCTION
16 06/02/25 MINOR CHANGES UPDATE MM
ABN 33 590 578 323
20079 DA2.01 16
Document Set ID: 23610048
Version: 1, Version Date: 03/03/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (SUPERSEDED Approved Plans MCU21_0110.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.