Original source · versioned page text
Assessment Report
existing development
or major transport
corridor; and
(g) power easements.
AO19.3
At least 10% of the total open
space provision for active parkland
is exclusive of flood inundation
below the 1% AEP (1:100 year ARI
level or the highest recorded flood
level), whichever is the greatest.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.