Original source · versioned page text
RHEA DEN BRAASEM · Report
ORDINARY MEETING 20 MARCH 2025 8.3 RHEA DEN BRAASEM QUESTION 1 In regards to stormwater on the 62 Lake MacDonald site, our steering committee has stressed on numerous occasions that the removal of 2200 trees is going to have an immediate worsening effect of stormwater flow due to a lack of canopy to help slow this down. We also don’t see how any storm water controls in the plan can be implemented before or during remediation as the road that is to drain water from lot 1 and 2 will not be built yet and any measure applied will involve digging up ground before the trees are removed and before the ground is remediated. We are extremely concerned, if the remediation and subdivision go ahead, with how the storm water will be managed for the whole site before the loss of forest canopy, during remediation and on LOT 3 after subdivision. Do council have a plan for this and what is it? QUESTION 2 In regards to conservation of natural resources on the site there are two aspects in question. Why is the stream fed waterway surrounded by native vegetation (that was referred to as having ecological significance in Noosa Council’s ecological report for the site) not being considered in any way on plans for this site? And can Council guarantee that the Gympie Messmates (largely on Lot 100) will be conserved?
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original