Court Order approved extension of currency 2013 · 132008.176

Attached to the e-mail 132008.176.03 Extend the relevant period for 132008 176 - Lots 10 & 11 - 3 & 7 Serenity Close Noosa Heads.

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

23. Construction signage, including that on hoardings and shade cloth but not including statutory
safety signage, shall not exceed a total of 20m* for the site. Tower cranes shall not include
advertising signage or unnecessary lighting.

Bicycle Parking

24. Secure bicycle racks shall be provided on site to accommodate a minimum of 28 bicycles.
The cycle parking rack is to be made available for customers and staff of the retail premises
at all times during business hours.

End-of-Trip Facilities
25. End of trip facilities shall be provided for staff and shall include:
a. a minimum of eight (15) lockers; and

b. a minimum of three male and three female shower cubicles with ancillary change
rooms.

Aternative Transport

26. A shuttle bus with a minimum of 22 seats shall be provided and operated in conjunction with
the resort to ferry guests to local destinations to minimise traffic impacts on the local area.
Details of the proposed operation shall be submitted for Council approval prior to the issue of
a Development Permit for Operational Works.

27. A minimum of 10 motor scooters shall be made available for use by resort guests, the
provision of which may be via a service agreement with a hire company

Energy & Water Efficiency

28. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).

29. All new kitchen, laundry and bathroom fittings shall comply with the AAA Water Conservation
Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and
Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 41.2), or
current equivalent standards as may apply, with toilets to comply with the AAAA Water
Conservation Rating System. All new tap ware and shower roses shall not exceed a
maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from
this requirement.

Community Management Statement Requirements

30. The Developer and all future owners of the site shall comply with the Environmental
Management Plan (EMP) for Settlers Cove Development 23118 DA and compliance with the
EMP shall be referenced in any community management statement over the site.

31. The Fire Management Plan is to be implemented by the Developer and future owners of the
site and is to be referenced in any community management statement.

Development Permits

32. The Developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.

Compliance Bond

33. Security in the form of a cash bond or trading bank guarantee for the sum of $100,000 must
be submitted to secure performance of all conditions of this approval prior to the issue of a
Development Permit for Operational Works. The cash bond or trading bank guarantee will
be returned on performance of the conditions of approval less any costs incurred by Council
in respect of enforcing performance of this permit.

Page 4 of 13

 

Used in these records

About this file

File size
6.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Court Order approved extension of currency 2013.pdf · 6.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.