63.

All stormwater drainage lines including inter-allotment drainage shall be inspected by closed
circuit television (CCTV) prior to commencement of the approved Use.

CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
following satisfactory completion of construction works. The developer will be responsible for
the full cost of CCTV inspection, including any additional inspection necessary following defect
identification and rectification. This charge is payable prior to the issue of Operational Works
approval and will be determined on the unit rate basis current at the time of approval.

Sewer Mains / Town Water Supply

64.
65.

66.

67.

68.

69.

70.

71.

72.

73.

Reticulated water supply and sewerage must be provided to the development.

Construction activities must not impede the access of Sunshine Coast Water or Fire Brigade
personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers)

The fire-fighting demand on Council's water supply system from the development must not
exceed 30 litres per second.

A single Council installed primary water meter must be provided immediately inside the
property boundary. Additional water meters must be installed for each title of a community title
or sub-lease scheme. Meters must be Council approved, installed in accordance with Council
requirements and remain accessible at all times for reading and maintenance purposes.

Buildings, basements and other structures must maintain a minimum clearance of 1.5 metres
from Council sewer mains, and 1.0 metres from sewer manhole chambers and inspection
openings.

Storm water retention systems, gross pollutant traps and bio-retention basins must maintain a
minimum clearance of 1.5 metres from Council water supply and sewerage infrastructure.

Landscape planting within 1.5 metres of Council sewerage infrastructure must be Council
approved varieties and low growing when mature.

The level of the existing sewer manholes must be adjusted to suit the proposed finished
surface levels. Work must be undertaken by Sunshine Coast Water at the applicants cost.

Landscape planting within 1.5 metres of Council sewerage infrastructure and 1.0 metres from
water supply infrastructure must be Council approved varieties and low growing when mature.

Construction works undertaken in the vicinity of Council water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
with repair, replacement or alteration of infrastructure must be met by the applicant.

Service Easements (Sewer / Stormwater)

74,

75.

76.

A 3.0 metre wide easement must be provided over all Council sewers located in privaie
property that are not covered by an existing easement. A 4.0 metre wide easement must be
provided over Council sewers greater than 3.0 metres deep (where approved by Council).
Easements must be located centrally over the main.

A registered easement shall be created over any stormwater drainage pipes within the site that
collect stormwater from a Council road or convey stormwater from any adjoining property (for
example, where drainage pipes are provided within the site to prevent adjacent properties from
additional ponding/flooding due to the subject site being filled).

No building or other structure shall be constructed or encroach into an easement.

Construction Issues
77.

 

A Traffic Management Plan for the each construction phase of the development shall be
submitted to and approved by Council at least 5 working days prior to the commencement of
any Building works or at least 5 working days prior to the pre-start meeting for Operational
Works. The Traffic Management Plan shall be referred to the Divisional Councillor for
comment before approval and shall include but not be limited to:

Page 8 of 13

Used in these records

About this file

File size
6.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Court Order approved extension of currency 2013.pdf · 6.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.