Court Order approved extension of currency 2013 · 132008.176
Attached to the e-mail 132008.176.03 Extend the relevant period for 132008 176 - Lots 10 & 11 - 3 & 7 Serenity Close Noosa Heads.
63. All stormwater drainage lines including inter-allotment drainage shall be inspected by closed circuit television (CCTV) prior to commencement of the approved Use. CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV inspection, including any additional inspection necessary following defect identification and rectification. This charge is payable prior to the issue of Operational Works approval and will be determined on the unit rate basis current at the time of approval. Sewer Mains / Town Water Supply 64. 65. 66. 67. 68. 69. 70. 71. 72. 73. Reticulated water supply and sewerage must be provided to the development. Construction activities must not impede the access of Sunshine Coast Water or Fire Brigade personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers) The fire-fighting demand on Council's water supply system from the development must not exceed 30 litres per second. A single Council installed primary water meter must be provided immediately inside the property boundary. Additional water meters must be installed for each title of a community title or sub-lease scheme. Meters must be Council approved, installed in accordance with Council requirements and remain accessible at all times for reading and maintenance purposes. Buildings, basements and other structures must maintain a minimum clearance of 1.5 metres from Council sewer mains, and 1.0 metres from sewer manhole chambers and inspection openings. Storm water retention systems, gross pollutant traps and bio-retention basins must maintain a minimum clearance of 1.5 metres from Council water supply and sewerage infrastructure. Landscape planting within 1.5 metres of Council sewerage infrastructure must be Council approved varieties and low growing when mature. The level of the existing sewer manholes must be adjusted to suit the proposed finished surface levels. Work must be undertaken by Sunshine Coast Water at the applicants cost. Landscape planting within 1.5 metres of Council sewerage infrastructure and 1.0 metres from water supply infrastructure must be Council approved varieties and low growing when mature. Construction works undertaken in the vicinity of Council water supply or sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs associated with repair, replacement or alteration of infrastructure must be met by the applicant. Service Easements (Sewer / Stormwater) 74, 75. 76. A 3.0 metre wide easement must be provided over all Council sewers located in privaie property that are not covered by an existing easement. A 4.0 metre wide easement must be provided over Council sewers greater than 3.0 metres deep (where approved by Council). Easements must be located centrally over the main. A registered easement shall be created over any stormwater drainage pipes within the site that collect stormwater from a Council road or convey stormwater from any adjoining property (for example, where drainage pipes are provided within the site to prevent adjacent properties from additional ponding/flooding due to the subject site being filled). No building or other structure shall be constructed or encroach into an easement. Construction Issues 77. A Traffic Management Plan for the each construction phase of the development shall be submitted to and approved by Council at least 5 working days prior to the commencement of any Building works or at least 5 working days prior to the pre-start meeting for Operational Works. The Traffic Management Plan shall be referred to the Divisional Councillor for comment before approval and shall include but not be limited to: Page 8 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Court Order approved extension of currency 2013.pdfRelated documentApplication case desk ↗
Court Order approved extension of currency 2013.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.