Council archive · source document
Court Order approved extension of currency 2013 · 132008.176
Attached to the e-mail 132008.176.03 Extend the relevant period for 132008 176 - Lots 10 & 11 - 3 & 7 Serenity Close Noosa Heads.
Erosion and Sediment Control 87. Any person acting on this permit shall prevent erosion and sediment export from leaving the site, Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. Plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. Contributions Towards Council Infrastructure 88. The applicant must pay contributions towards trunk infrastructure in accordance with the following Planning Scheme Policies and Council Policies: a. Planning Scheme Policy 12 — Public Open Space Contributions; Planning Scheme Policy 13 — Contributions in Lieu of Off Street Parking; Planning Scheme Policy 16 — Sewerage Headworks Contributions; Planning Scheme Policy 17 — Water Supply Headworks Contributions; Planning Scheme Policy 20 — Pathway Trunk Network Contributions; Council Policy — Rural Roadworks Contributions; & ~"p poo g. Council Policy - Master Drainage Contributions. For material change of use of premises approvals the contributions must be paid prior to the commencement of use, for reconfiguring a lot approval contributions must be paid prior to Council approval of the plan of subdivision. The actual amount of the contribution must be calculated and paid in accordance with the Planning Scheme Policies and variations due to indexation current at the time of payment. General 89. 90. 91, 92. 93. 94. Any Building Format Plans (or similar) submitted for Council approval must be accompanied by the relevant Community Management Statement (or similar) demonstrating compliance with the conditions of this approval. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works that will become Council infrastructure, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any application for Operational Works. Digital detailed designs including drawings, calculations, specifications and a schedule of works, shall be submitted with any application for a Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The design shall be in accordance with Council's Planning Scheme Policy PSP05 — Engineering Design Standards — Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). A construction management plan/strategy to ensure no damage occurs to Council services shall be prepared by a suitably qualified Registered Professional Engineer and submitted to Council in conjunction with any application for Operational Works. Any damage caused to any public utility during the course of construction shall be repaired to Council's standards and at no cost to Council. Page 10 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Court Order approved extension of currency 2013.pdfRelated documentApplication case desk ↗
Court Order approved extension of currency 2013.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.