Council archive · source document
Court Order approved extension of currency 2013 · 132008.176
Attached to the e-mail 132008.176.03 Extend the relevant period for 132008 176 - Lots 10 & 11 - 3 & 7 Serenity Close Noosa Heads.
Building Height 10. 11. The finished height of the building, including any rooftop plant or structures, shall not exceed 15 metres above natural and finished ground levels. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of work confirming compliance with the maximum allowable building height as required by either the conditions of approval or the Planning Scheme. Operating Hours & Deliveries 12. 13. 14. The restaurants and bar are to operate between the hours of 6am and 12pm only. Business deliveries are to be undertaken between the hours of 6am to 7pm Monday to Saturday and 8am to 5pm Sunday only. Service vehicles shall not attend the site outside the hours of 8am to 5pm. Vegetation 15. 16. 17. 18. Existing trees on the site and within road reserves are to be retained except where required to be removed due to building operations, requirements of the approved Settler’s Cove Management Plans or the conduct of the approved use. The Koaia and Glossy Black Cockatoo habitat trees identified for retention on plan L-SD- 1.01 (Rev. A) dated August 2009 by DBI Design Pty Ltd shall be retained. The existing Koala and Glossy Black Cockatoo habitat trees and any other trees within setback and open space areas to be retained must be protected. As building works are likely to impact the trees’ root zones, a qualified Arborist (having a minimum Diploma of Arboriculture or ISA certification and a minimum of three years’ field experience) must be contracted to prepare a Tree Management and Protection plan and shall: a. oversee installation of a hard temporary protection zone prior to commencement of works with ‘no go’ signage in accordance with AS 4970-2009. All site workers must be inducted in relation to the tree protection; b. supervise any works within the temporary protection zone; undertake hazard reduction and formative pruning as necessary; & provide certification that the trees were protected in accordance with the Arborist’s recommendations. The Tree Management and Protection Plan Shall be presented prior to or at the pre-start meeting for the site. The Arborist shall monitor the health and structural integrity of the trees to be retained at least monthly during the construction period and quarterly for 12 months after construction is completed. The developer shall rectify any decline in the health or structural integrity of the trees, in accordance with the Arborist’s recommendations. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- a. Re-use for building materials. b. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres between edges of heaps. Disposal for firewood. d. Disposal for landscaping purposes. Page 2 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Court Order approved extension of currency 2013.pdfRelated documentApplication case desk ↗
Court Order approved extension of currency 2013.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.