20191202 Ltr Noosa Council
In accordance with condition 12 of the Stage 1 approval and clause 4.1 of the Infrastructure Agreement,
Council has previously received a land dedication of 12.63hectares for open space and recreation. Clause
4.2 of the Infrastructure Agreement acknowledges that this land dedication is an appropriate commitment of
land to satisfy the environmental needs of the land for the Shire Business Centre (for all stages). As such,
the development of balance stages should not be regarded as resulting in significant residual impact under
the Planning Regulation.
9. Other Agreement
As discussed, we have considered the draft Noosa Plan in the preparation of this amended application and
outline the following potential direct benefits to the broader Noosa Community resultant from this ROL.
- Public thoroughfare easement benefiting Noosa Council, 4 metres in width, running on the western
boundary of Lots 3 and 4, connecting Lot 24 with Hofmann Drive extension;
- New public road extension of Hofmann Drive connecting to Walter Hay Drive in the south;
- New public road from northern Walter Hay Drive roundabout connecting with Lot 24 providing
direct access to the transit lot;
- Dedication of Lot 24 (4918sqm) to Noosa Council for the purpose of Transit Facility. Should
Council wish, we would be willing to amend Covenant J extent accordingly; and
- Delivery of the planned uses contained in the draft Noosa Character Framework Plan.
As discussed, we propose that these benefits are captured along with the following works in a Deed of
Variation to the existing Infrastructure Agreement:
- All works required to deliver emergency bushfire vehicular access to connect to Walter Hay Drive;
- All works required to deliver pedestrian connectivity from the existing footpath at the boundary to
Lot 23 (which will require resolution of the existing open swale for stormwater and covered by
Easement E).
We have attached a working draft of the Deed of Variation to the Infrastructure Agreement and we
welcome your review and comment to enable this to be finalised with Council’s decision on the Application.
Patrick, we thank you and your team for working with us over the past weeks and look forward to
continuing to work together as Council finalise their assessment of this application.
gina Madsen
Stockwell
CC: Kim Rawlings, Noosa Council
Page Z
DEVELOPMENT FUNDSMANAGEMENT = PROPERTY MANAGEMENT DESIGN & CONSTRUCTION
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.