Council archive · source document
Coastal Hazard Assessment · MCU25/0087
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
17 The Esplanade, Sunshine Beach Report 1 INTRODUCTION Moffatt & Nichol (M&N) has been engaged by Christian Seymour, the owner of 17 The Esplanade (Lot 678 on RP48111), Sunshine Beach to undertake a site-specific coastal hazard assessment. It is proposed to demolish the existing residential building and construct a new residential building on the site. The site is subject to coastal planning constraint layers, and this coastal hazard assessment is required to address the assessment requirements of Noosa Shire Council. The assessment reported herein provides a site-specific assessment of erosion hazard risk, including a site-specific assessment of the erosion prone area width and an assessment of the beach erosion likely to occur due to an extreme storm event. Accordingly, it provides an estimate of erosion vulnerability along this section of beach and will be used to address the assessment criteria considered by Noosa Shire Council. It should be noted that the reported erosion prone area is an estimate of erosion vulnerability over a 100-year planning period and is based on a conservative assessment methodology. For this development application, an extreme event consisting of; a 100-year ARI storm tide level, sea level rise of 0.8 metres and a 100-year ARI significant wave height has been adopted. 252662-MN-RP-CO-0001B | 10 November 2025 | Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Coastal Hazard Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.