Original source · versioned page text
Reference Document - MCU24 0155 (As Published)
DCM BUILDING DESIGN 18 SHEARWATER STREET, PEREGIAN BEACH – STORMWATER MANAGEMENT PLAN Calculated catchment discharges for events from AEP 1% (ARI 100year) to AEP 63.21% (ARI 1year) events are shown in Table 2 below. Table 2: Pre Development Catchment Discharges Q ARI AEP(%) FY CY Iy T DISCHARGE (Q) (mm/h) m3/s L/s 1 63.21 0.80 0.56 125.0 0.0109 10.88 2 50.00 0.85 0.60 139.6 0.0129 12.91 5 20.00 0.95 0.67 187.2 0.0194 19.35 10 10.00 1.00 0.70 219.6 0.0239 23.90 20 5.00 1.05 0.74 251.2 0.0287 28.70 50 2.00 1.15 0.81 294.4 0.0368 36.84 100 1.00 1.20 0.84 327.4 0.0428 42.75 3.3 Post Deve lopmen t The soft landscaping pervious areas of the proposed allotment configuration are shown below in Figure 6 below, the total catchment area for the site is 546.5m2 and the total pervious area is 272m2. Figure 6: Post Development Pervious Area Page 11 of 17
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Reference Document - MCU24 0155 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.