Original source · versioned page text
Reference Document - MCU24 0155 (As Published).pdf
DCM BUILDING DESIGN 18 SHEARWATER STREET, PEREGIAN BEACH – STORMWATER MANAGEMENT PLAN SYNOPSIS This document presents the Stormwater Management Plan for a small residential dwelling at 18 Shearwater Street, Peregian Beach. This document will report how stormwater runoff from the property will be managed to minimise environmental impacts and comply with Noosa Councils Regulations. Disclaimer RECOR Pty Ltd has prepared this report based on an agreed scope of work and acts in all professional matters as an advisor to the Client and exercises all reasonable skill and care in the provision of its professional services in a manner consistent with the level of care and expertise exercised by members of the environmental profession. Reports are commissioned by and prepared for the exclusive use of the Client. They are subject to and issued in accordance with the agreement between the Client and RECOR Pty Ltd. RECOR Pty Ltd is not responsible and will not be liable to any other person or organisation for or in relation to any matter dealt within this Report, or for any loss or damage suffered by any other person or organisation arising from matters dealt with or conclusions expressed in this report (including without limitation matters arising from any negligent act or omission of RECOR Pty Ltd or for any loss or damage suffered by any other party relying upon the matters dealt with or conclusions expressed in this Report). Other parties should not rely upon the report or the accuracy or completeness of any conclusions and should make their own inquiries and obtain independent advice in relation to such matters. Except where expressly stated, RECOR Pty Ltd has not verified the validity, accuracy or comprehensiveness of any information supplied to RECOR Pty Ltd for its reports. Reports prepared by RECOR Pty Ltd cannot be copied or reproduced in whole or part for any purpose without the prior written agreement of RECOR Pty Ltd. Where site inspections, testing or fieldwork have taken place, the report is based on the information made available by the client or their nominees during the visit, visual observations, and any subsequent discussions with regulatory authorities. The validity and comprehensiveness of supplied information has not been independently verified, and, for the purposes of this report, it is assumed that the information provided to RECOR Pty Ltd is both complete and accurate. It is further assumed that normal activities were being undertaken at the site on the day of the site visit(s), unless explicitly stated otherwise. COPYRIGHT The concepts and information contained in this document are the property of RECOR Pty Ltd. Use or copying of this document in whole or in part without the written permission of RECOR Pty Ltd constitutes an infringement of copyright. Page 2 of 17
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Reference Document - MCU24 0155 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.