Original source · versioned page text
Reference Document - MCU24 0155 (As Published).pdf
DCM BUILDING DESIGN 18 SHEARWATER STREET, PEREGIAN BEACH – STORMWATER MANAGEMENT PLAN 1 EXECUTIVE S UMMARY The subject site at 18 Shearwater Street, Peregian Beach has a small, detached dwelling which is proposed to be demolished to accommodate the construction of a new private residential dwelling. The site is located immediately west of Peregian Beach with a buffer between which comprises of medium dense bushland containing some open drains to convey flows east to the beach which will act as the legal point of discharge for the subject site in both the existing and developed scenarios. The catchment for the site is small and largely limited to the area of the allotment itself. Based on a Rational method analysis of the pre-development and post-development catchments it was found that there is very little difference between the existing and the proposed catchment runoff due to similar areas of pervious and impervious surfaces. Therefore, it is not deemed necessary to provide any method of stormwater runoff collection or detention for the site. The key reason for this report is to address Noosa Councils concerns over stormwater runoff from the site as requested as item 15 of the information request (ECM_23440016_v4) and this item has been addressed in the following report. It is recommended that the proposed dwellings roof water be conveyed to the existing open drain via a uPVC roof water pipe and to include an appropriate headwall and scour protection at the outlet. Page 5 of 17
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Reference Document - MCU24 0155 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.