Original source · versioned page text
Attachment G - Stormwater Quality Management plan
NOTES: Bioretention media specification shall be in accordance with the Facility for Advancing Biofiltration "Guidelines for Soil Filter Media in Bioretention Systems”. Bioretention hydraulic conductivity shall be in accordance with the Facility for Advancing Biofiltration "Practice Note 1: In Situ Measurement of Hydraulic Conductivity”. The number of samples to be tested shall be in accordance with the "Water Sensitive Urban Design Construction and Establishment Guidelines — Swales, Bioretention Systems and Wetlands” (Water by Design). 2. Under—drain: slotted rigid pipe (uPVC or similar to AS 2439.1) or approved equivalent, 0.5% MIN. grade. Refer project drawings for diameter and invert level (typically @100-150). Pipe joins should be glued using plumbing cement. Pipe should not be installed with a filter sock surrounding pipe. Under—drainage pipes shall be sealed into pits using grout or other approved watertight seal. 3. Refer to project drawings for vegetated batter slopes (1 in 3 MAX, 1 in 4 typical) and batter topsoil requirements. 4. Filter cloth — non-woven geotextile. Filter cloth not to be placed between any filter layers. Impervious liner may be required subject to soil testing requirements in accordance with the ‘Water Sensitive Urban Design Technical Design Guidelines” (Water by Design). 5. Basin finished surface level is top of filter media. Surface to be mulched and planted as per landscape drawings. 6. Construction tolerances as documented in the "Water Sensitive Urban Design Construction and Establishment Guidelines — Swales, Bioretention Systems and Wetlands” (Water by Design) must be achieved. Construction tolerances must be noted on project plans. Invert levels of pits and pipes and base levels must be shown on project drawings. 7. Refer landscape drawings for plant specification. Plant specification and density shall be in accordance with the "Water Sensitive Urban Design Technical Design Guidelines” (Water by Design). 8. All dimensions are in millimetres unless otherwise C.l. cap. extend cap to approx. 150 above ees basin surface YW V/ Subsoil drain cleanout — pvc pipe (non slotted) and connector cleanouts at head of subsoil drain 4S ‘Y’ branch Refer note 2 Provide locking function or secure cap with screws V/ fer No te 3 \ [p Filter cloth extend 500mm up batter under topsoil pinned to batter, refer note 4. Mulch layer — 50-75, refer note 5 Bioretention basin finished surface level, refer project drawings and notes 5 and 7 |\~——— Filter media — loamy sand, refer project drawings for depth, 500 (typical) 400 MIN Transition layer — coarse sand, constant depth — 100, refer note 1 135° Bend, refer note 2 | nom. size 0.5-2.0 k——— Drainage layer — fine aggregate, constant depth — 200, nom. size 2-5 Provide end cap at head of subsoil drain Filter cloth, refer note 4 | | —DRAI T — | l Provide locking function or C.l. cap. extend cap to \Besin base to grade at 0.5% MIN to overflow pit, refer note 6 50 MIN cover of drainage layer (fine aggregate) over under drainage pipe Mulch layer — 50-75, secure cap with ene approx. 150 above batter surface ee Filter cloth extend 500 l~ up batter under topsoil pinned to batter, refer note 4 VV 135° Bend, Subsoil drain cleanout foe note 2 pvc pipe (non slotted) *Y’ branch, and connector cleanouts at head of subsoil drain refer note 2 —————_ _ _ refer note 5 Pw |I~_—— Filter media — loamy sand, refer project drawings for depth, 500 (typical) 400 MIN Bioretention basin finished surface level, refer project drawings and notes 6 and 7 Transition layer — coarse sand, constant depth — 100, refer note 1 Provide end cap at head l nom. size 0.5-2.0 <= Drainage layer — fine aggregate, of subsoil fone constant depth — 200, nom. size 2-5 Basin base to grade at 0.5% MIN to overflow pit, refer note 6 Filter cloth, refer note 4 a BIORETENTION UNDER—DRAIN CLEANOUT — IN BATTER 150 MIN cover of drainage layer (fine aggregate) over under drainage pipe noted. These drawings have been developed in consultation between the participating councils. BEFORE USE, the user shall confirm that the drawing has been adopted by the appropriate council INSTITUTE OF PUBLIC WORKS ENGINEERING AUSTRALIA BIORETENTION STANDARD PROFILE we Hy QUEENSLAND DIVISION INC. UNDERDRAIN CLEANOUT WSUD—003 = A 13, 1/2010 ORIGINAL ISSUE — STANDARD DRAWINGS La
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment G - Stormwater Quality Management plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.