Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Approved Decision Notice - DBW25 0033 (As Published) · DBW25/0033

of 6

Text shows just the words. Original shows the document exactly as it was published.

                                                                               Officer:            Tiani Bird
                                                                               Direct Telephone:   07 5329 6245
                                                                               Our Reference:      DBW25/0033 & RAP25/0013
                                                                               Your Reference:     00024279

               9 January 2026


               Alliance Homes Pty Ltd
               C/- Suncoast Building Approvals
               PO Box1054
               MAROOCHYDORE QLD 4558
               [email protected]



               Dear Sir/Madam,
                                                         Decision Notice
                                                         Planning Act 2016

               I refer to your application and advise that on 8 January 2026, Council decided to approve the
               application, subject to conditions.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              DBW25/0033

                   Street address:              15 Shorehaven Dr, NOOSAVILLE QLD 4566

                   Real property description:   Lot 80 RP 839223

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Building Works Assessable Against the Planning Scheme – Dwelling
                       House (Garage Door & Flood)
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               PLANNING
                       When Conditions must be Complied With
               1.      Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                       the use of the building commencing, and then compliance maintained at all times while the
                       use continues.




               ABN 97.969.214.121                                                                 PO Box 141
               noosa.qld.gov.au                                                            Tewantin QLD 4565
               [email protected]                                                            07 5329 6500
                                                                                                            Page 1 of 6
Document Set ID: 24424088
Version: 2, Version Date: 09/01/2026
Full text of the other 5 pages

Page 2

                      Currency Period
               2.     This development approval lapses if the works have not substantially started by 8 January
                      2028 unless an application to extend the currency period is approved by Council.
                      Approved Plans
               3.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below.

                        Plan No.       Rev.   Plan/Document Name                                   Date

                        02                -   Site Plan, prepared by Stylemaster Homes             06/01/2026

                        05                -   Ground Floor Plan, prepared by Stylemaster Homes 06/01/2026

                        07                -   Elevations, prepared by Stylemaster Homes            06/01/2026

                        08                -   Elevations, prepared by Stylemaster Homes            06/01/2026

                      Building Height
               4.     The maximum height of the development must not exceed 8 metres above the ground level.
                      Car Parking
               5.     A minimum of 2 car parking spaces must be provided on site and made available and
                      accessible at all times for residents.
                      Flood Immunity and Earthworks
               6.     The minimum floor levels of all habitable rooms must be at least 300 millimetres above the
                      Defined Flood Event – 1% AEP.
                      Stormwater Drainage
               7.     Stormwater runoff from the development must be discharged to Shorehaven Drive without
                      causing scour or damage to the subject site or any adjoining property.
                      Damage to Services and Assets
               8.     Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.     where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                             or
                      b.     where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
                      Bonds
               9.     A site compliance bond of $5,000 is to be submitted to Council prior to the commencement
                      of works. The commencement of works can only commence once Council's Construction
                      Engineering Officer has confirmation that the bond monies have been received by Council.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.




                                                                                                       Page 2 of 6
Document Set ID: 24424088
Version: 2, Version Date: 09/01/2026

Page 3

               10.    Bonds must:
                      a.      meet the requirements of council’s relevant Planning Scheme Policy for performance
                              and uncompleted works;
                      b.      be lodged with Council and accompanied by the Bond Administration Fee/s; and
                      c.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.
                      Earthworks
               11.    All earthworks and associated retaining structures/batters must be contained entirely within
                      the subject site unless written permission from the respective landowner(s) is provided to
                      Council. All earthworks must be undertaken in accordance with the provisions of Australian
                      Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
               12.    Earthworks carried out on site must not affect the structural integrity of the revetment wall,
                      existing fences or other structures that border the subject site. Fences that are affected must
                      be replaced in a timely manner and in consultation and agreement of the owners of the
                      related properties.
                      Revetment Wall / Flood Storage
               13.    All works within the 4.5m setback from the revetment wall must be carried out generally in
                      accordance with Storm Water Consulting’s Flood Storage Assessment Report (J11878 v1.0
                      P.A.) dated 3 October 2025.
               14.    All works for the purpose of increasing available flood storage must be located within the
                      4.5m setback from the revetment wall.
               15.    Certification of the completed works within the 4.5m setback from the revetment wall must
                      be submitted to Council within 3 months of the completion of the works. The certification must
                      be prepared by a RPEQ (Registered Professional Engineer of Queensland) and state that
                      the works:
                      (a) Have not reduced the amount of available flood storage within the 4.5m setback from the
                          revetment wall;
                      (b) Have not negatively impacted the stability of the revetment wall or negatively impacted
                          the associated membrane;
                      (c) Have not reduced the available flood storage within the lot from the profile as described
                          in the Noosa Plan 2020 – Low Density Residential Zone Code; and
                      (d) Meet the relevant conditions of this approval.
               5.     REFERENCE DOCUMENTS

                Plan No.                Rev.      Plan/Document Name                         Date

                J11878 v1.0 P.A.        -         Flood Storage Assessment Report 3 October 2025
                                                  Prepared by Storm Water Consulting

               6.     REFERRAL AGENCIES

               Not applicable.




                                                                                                        Page 3 of 6
Document Set ID: 24424088
Version: 2, Version Date: 09/01/2026

Page 4

               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Aboriginal Cultural Heritage Act 2003
               1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
                      Fires in Urban Areas
               2.     In urban areas fires are prohibited except where in an appliance is used for domestic heating
                      or cooking purposes, which must comply with particular standards. Any area identified as a
                      fire pit area on approved plans is to be in accordance with Local Law & Subordinate Local
                      Law No. 3, Schedule 3. Refer to the following link for details:
                      https://www.noosa.qld.gov.au/community/local-laws/local-laws-overview
                      Performance Bond agreement
               3.     An applicant for a development application may make an agreement with an assessment
                      manager, referral agency or other person to establish the responsibilities, or secure the
                      performance, of a party to the agreement about a development condition.
                      Equitable Access and Facilities
               4.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                      b.      the Anti-Discrimination Act 1991 (Queensland); and
                      c.      the Disability (Access to Premises – Buildings) Standards.
                      Short Stay Letting
               5.     On 21 October 2021, Noosa Council adopted a new local law for short stay letting and home
                      hosted accommodation. The local law commenced on 1 February 2022. A one off application
                      will need to be made, under the new local law, for all existing and new properties operating
                      short stay letting or home hosted accommodation, unless identified as exempt.
                      For more information and application forms, please visit Council’s website below:
                      https://www.noosa.qld.gov.au/short-stay-letting-home-hosted-accommodation-local-law
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.



                                                                                                             Page 4 of 6
Document Set ID: 24424088
Version: 2, Version Date: 09/01/2026

Page 5

               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required             Subject of the required Development Permit

                Development Permit for Building Works           All building work.

               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.



               Yours faithfully,
               Tiani Bird
               Development Planner | Development Assessment
               Development & Regulation


               Enc:   Appeal Rights
                      Approved Plans/Documents




                                                                                                      Page 5 of 6
Document Set ID: 24424088
Version: 2, Version Date: 09/01/2026

Page 6

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 6 of 6
Document Set ID: 24424088
Version: 2, Version Date: 09/01/2026

Used in these records

About this file

File size
151 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Decision Notice - DBW25 0033 (As Published).pdf · 151 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.