10. Bonds must:
a. meet the requirements of council’s relevant Planning Scheme Policy for performance
and uncompleted works;
b. be lodged with Council and accompanied by the Bond Administration Fee/s; and
c. be requested for release by writing to Council, when relevant approval requirements
have been met.
Earthworks
11. All earthworks and associated retaining structures/batters must be contained entirely within
the subject site unless written permission from the respective landowner(s) is provided to
Council. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
12. Earthworks carried out on site must not affect the structural integrity of the revetment wall,
existing fences or other structures that border the subject site. Fences that are affected must
be replaced in a timely manner and in consultation and agreement of the owners of the
related properties.
Revetment Wall / Flood Storage
13. All works within the 4.5m setback from the revetment wall must be carried out generally in
accordance with Storm Water Consulting’s Flood Storage Assessment Report (J11878 v1.0
P.A.) dated 3 October 2025.
14. All works for the purpose of increasing available flood storage must be located within the
4.5m setback from the revetment wall.
15. Certification of the completed works within the 4.5m setback from the revetment wall must
be submitted to Council within 3 months of the completion of the works. The certification must
be prepared by a RPEQ (Registered Professional Engineer of Queensland) and state that
the works:
(a) Have not reduced the amount of available flood storage within the 4.5m setback from the
revetment wall;
(b) Have not negatively impacted the stability of the revetment wall or negatively impacted
the associated membrane;
(c) Have not reduced the available flood storage within the lot from the profile as described
in the Noosa Plan 2020 – Low Density Residential Zone Code; and
(d) Meet the relevant conditions of this approval.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
J11878 v1.0 P.A. - Flood Storage Assessment Report 3 October 2025
Prepared by Storm Water Consulting
6. REFERRAL AGENCIES
Not applicable.
Page 3 of 6
Document Set ID: 24424088
Version: 2, Version Date: 09/01/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Decision Notice - DBW25 0033 (As Published).pdfRelated documentApplication case desk ↗
Decision Notice - Approved by Delegation of Authority - DBW25 0033 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 151 KB (small file)
- File type
No other editions are linked here.