                                                                                 Officer:            Stacey Clohesy
                                                                                 Direct Telephone:   07 5329 6245
                                                                                 Our Reference:      OPW25/0206
                                                                                 Your Reference:     23046

               15 June 2026


               Royal Automobile Club of Victoria (RACV) Ltd
               C/- Adamson Town Planning Pty Ltd
               PO Box 894
               COOROY QLD 4563

               [email protected]



               Dear Sir/Madam,
                                                         Decision Notice
                                                         Planning Act 2016

               I refer to your application and advise that on 11 June 2026, Council decided to approve the
               application subject to conditions.
               Details of the decision are as follows:


               1.      APPLICATION DETAILS

                   Application No:              OPW25/0206

                   Street address:              94 & 142 Noosa Dr Noosa Heads Qld 4567

                   Real property description:   SP 203415, SP 203417, Lot 200 SP 267421, Lot 203 SP 267424
                                                and Lot 3 SP126203

                   Planning Scheme:             Noosa Plan 2020 (26 September 2025)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •     Development Permit for Operational Works - Clearing Vegetation under planning scheme
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.



               ABN 97.969.214.121                                                              PO Box 141
               noosa.qld.gov.au                                                         Tewantin QLD 4565
               [email protected]                                                         07 5329 6500
                                                                                                         Page 1 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026
Full text of the other 37 pages

Page 2

                           Plan No.             Rev.   Plan/Document Name                               Date

                           210910_A10-07        JJ     Site Plan – Tree retention vs Removal Plan, 2 Dec 2025
                                                       prepared by Aspect

                           210910_A10-25        A      Operational Works Plan, prepared by 2 Dec 2025
                                                       Aspect

                           AP241011             3      Concept - Construction and Tree 18 Dec 2025
                                                       Management Plan, prepared by Aspect,
                                                       Consult Arborist and MRP Hydraulic & Fire
                                                       Consultants

                           -                    -      Construction Management Plan, prepared 2 Feb 2026
                                                       by Biodiverse Environmental

                           -                    V11    Arborist Tree Retention Review, prepared 24 November
                                                       by Consult Arborist                      2025

                           PR1269               00     Fauna Management Plan, prepared by 2 Dec 2025
                                                       Biodiverse Environmental

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 12 June 2028, unless an application to extend the currency period is
                      approved by Council.
               PRIOR TO COMMENCEMENT OF WORKS
               3.     Prior to requesting a prestart meeting:
                      a.       Tree protection measures must be installed under the supervision of the Project
                               Arborist. (Refer to Retention of Existing Trees Conditions)
                      b.       A pre-clearance survey must be undertaken to clearly identify all trees to be removed
                               and those to be retained on the site, in accordance with the approved plans and
                               documents of this Decision Notice.
                      c.       A Tree Protection Bond of $50,000 must be submitted to Council in the form of cash or
                               an unconditional bank guarantee. The bond is required to secure compliance with
                               conditions of this approval relating to vegetation clearing and the protection of retained
                               trees identified on the approved plans and supporting documentation, including the
                               establishment and maintenance of tree protection measures and prevention of damage
                               to retained native vegetation.
                      d.       Certificates demonstrating currency of public liability insurance and works insurance
                               covering the works must be submitted to Council prior to the prestart meeting.
                      e.       A fauna and habitat pre-clearance survey including a fauna trapping program is to be
                               conducted within 2 weeks of commencement of clearing works, in accordance with the
                               requirements outlined in the approved Fauna Management Plan.
                      f.       Provide written evidence of compliance with SARA referral agency response, condition
                               5 (SARA reference 2602-50749 SRA)
                               *(Refer to Advisory Note
               4.     A prestart meeting must be organised with Council’s delegate by calling 5329 6500 (giving
                      at least five business days’ notice). The prestart meeting must be attended by the responsible
                      persons for:
                      a.       Arboreal works


                                                                                                          Page 2 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

Page 3

                      b.      Fauna management works
                      c.      Erosion and sediment control works
                      d.      Other relevant parties
                      DURING WORKS
                      General
               5.     Where damage occurs to any Council asset as a result of the development works, it must be
                      repaired immediately where it creates a hazard that presents risk to person or property. Other
                      damage must be repaired prior to completion of works.
               6.     All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice.
                      b.      The relevant conditions of the higher order Material Change of Use approval viz.
                              Planning and Environment Court Judgment No. 3746 of 2023, to which this approval
                              relates.
                      c.      All relevant Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines.
                      VEGETATION PROTECTION
                      Retention of Existing Trees and Vegetation
               7.     All trees and vegetation identified for retention must be protected in accordance with
                      AS 4970, Protection of trees on development sites and the relevant approved documents
                      and plans of this decision notice.
               8.     A qualified person* must be engaged for the duration of the works to:
                      a.      Ensure works are carried out in accordance with the approved Arborist Report and
                              approved Concept – Construction and Tree Management Plan.
                      b.      Oversee installation of all tree protection fencing prior to commencement of any
                              clearing works onsite.
                      c.      Supervise tree protection within the development site and frontages, prior to, during
                              and following construction in accordance with AS 4970, Protection of trees on
                              development sites.
                      d.      Oversee approved tree removal in proximity to retained trees.
                      *(Refer to Advisory Note)
               9.     Vegetation areas for protection must:
                      a.      Be protected in accordance with the approved Arborist Report and approved Concept
                              – Construction and Tree Management Plan.
                      b.      Be protected with a 1.8m high temporary safety fence (or temporary barrier mesh).
                      c.      Have the fence installed prior to the prestart meeting and maintained for the entire
                              period of construction.
                      d.      Have ‘Exclusion Zone’ (‘No Go’) signage fixed to the fence at 10m centres.
                      e.      Have no construction material, equipment or personnel entering the ‘Exclusion zone’
                              (‘No Go’) except to undertake approved rehabilitation activities.
                      *(Refer to Advisory Note)

                      Fauna Management
               10.    A qualified person* must be engaged to manage fauna prior and during clearing to:




                                                                                                      Page 3 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

Page 4

                      a.      Ensure works are carried out in accordance with the approved Fauna Management
                              Report (prepared by Biodiverse Environmental); and the Nature Conservation Act
                              1992.
                      b.      Undertake pre-clearance fauna and habitat assessment on each day of vegetation
                              disturbance, to identify and fauna and habitat present
                      c.      Ensure clearing works avoid nesting times of native fauna.
                      d.      Co-ordinate staging and sequence of clearing with fauna protection.
                      e.      Protect and recover fauna during clearing operations (not previously removed).
                      f.      Manage the translocation of native animals and recovery procedures in accordance
                              with the approved fauna management plan and relevant legislation.
                      g.      Undertake protection works for mulching of any stockpiled vegetation.
                      *(Refer to Advisory Note)
                      Removal of Existing Trees and Vegetation
               11.    Removal of existing trees and vegetation must be undertaken by a qualified person* and
                      must include:
                      a.      Rectification to the finished surface levels and materials.
                      b.      No damage to other vegetation for retention.
                      c.      Legal disposal of all removed vegetation and debris.
               12.    Vegetation removal, felling and lopping must:
                      a.      Retain old growth tree hollows and suitably relocate and distribute for nesting fauna.
                      b.      Have mulch for re-use in landscape or rehabilitation stockpiled and aged for a minimum
                              of three months.
                      c.      Have mulch stockpiles no larger than 1000m3, 2.5m in height and with 10m separation
                              between piles.
                      d.      Conclude with the area being stabilised against erosion, landscaped, rehabilitated and
                              revegetated.
                      *(Refer to Advisory Note)
                      Plant Pest Management
               13.    A qualified person* must manage plant pest (weeds) to:
                      a.      Ensure plants listed as Class 1 and 2 declared pests within Council’s Pest
                              Management Plan are controlled and prevented from spreading.
                      b.      Oversee management techniques that minimise regrowth, prevent damage to non-
                              target species, retain conservation values and maintains site stability.
                      *(Refer to Advisory Note)




                                                                                                        Page 4 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

Page 5

               5.     REFERENCE DOCUMENTS

                Plan No.                  Rev.   Plan/Document Name                                  Date

                -                         6      Emergency Management        Plan   &   Response Feb 2026
                                                 Procedures Noosa Resort

                -                         -      Emergency Management Plan: Site Map Assembly 8 April 2026
                                                 Areas

                J002662                   2      Operational Waste Management Plan, prepared by 2 Dec 2025
                                                 Range Environmental Consultants

               6.     REFERRAL AGENCIES

               The referral agencies applicable to this application are:

                Referral Status          Referral Agency and Referral Trigger                 Response
                                         Address

                Concurrence              State Assessment and     Schedule 10, Part 10,       The agency provided its
                                         Referral Agency          Division 3, Subdivision3,   response on 24 April
                                         (SARA) / Department                                  2026 (Reference No.
                                                                  Table 1, Item 1 (Planning
                                         of State Development,                                2602-50749 SRA). A
                                         Infrastructure and       Regulation 2017)            copy of the response is
                                         Planning.                Development interfering     attached
                                         For assistance contact   with koala habitat in
                                         SEQ North Regional       koala habitat areas
                                         office:                  outside koala priority
                                         Foundation Place,        areas
                                         Level 4, 3 South Sea
                                         Islander Way
                                         PO Box 1129,
                                         Maroochydore Qld
                                         4558
                                         P: 07 5352 9701
                                         E: SEQNorthSARA@d
                                         sdilgp.qld.gov.au



               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Prestart, On and Off Maintenance, Rehabilitation Inspections Request
               1.     Contact Council on 5329 6500 to arrange a prestart meeting or an inspection giving a
                      minimum of five business days’ notice of preferred inspection time.
                      Prestart
               2.     Tree Protection Bond:
                      a.      may be drawn upon by Council if:
                              i.       the recommendations of outlined in the approved plans and documents of this
                                       Decision Notice are not implemented, or




                                                                                                         Page 5 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

Page 6

                              ii.      any trees identified for retention are damaged to the point where they cannot be
                                       saved (as confirmed by the site Arborist and agreed in writing by Council).
                      b.      will be returned upon receiving certification of compliance from the Project Arborist that
                              all clearing works have been completed in accordance with this approval.
               3.     All tree retention and protection works must be carried out in accordance with methodology
                      and recommendations detailed in the approved plans and documents listed within this
                      Decision Notice.
                      Retention of Existing Trees
               4.     The existing trees on adjoining properties must be retained and protected during construction
                      wherever achievable. To avoid doubt, this advisory note is not intended to exclude the
                      operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following
                      construction of the development which is the subject of this development approval.
                      Removal of Existing Trees and Vegetation
               5.     Stockpiling mulch to the appropriate volume and separation is required for fire mitigation as
                      well as optimum weed seed sterilisation.
                      Qualified Person
               6.     Qualified Person, for the purpose of:
                      a.      Undertaking, supervising tree works and preparing arboriculture certification, is
                              considered to be a person with a minimum three years current experience in tree
                              protection, hazard identification/mitigation and Specifying Trees – a guide to
                              assessment of tree quality (NATSPEC) assessment and either:
                              i.       International Society of Arboriculture (ISA) certification; or
                              ii.      A Diploma of Arboriculture (min AQF level 5).
                      b.      Managing Fauna protection, preparing Fauna reporting and certification and
                              calculating compensatory habitat, is considered to be an Ecologist or Environmental
                              Scientist with a minimum of three years current experience in the field of fauna
                              assessment and management.
                      c.      Preparing certification and managing declared plant pests, is considered to be:
                              i.       a landscape architect with a minimum of 3 years current experience in the field
                                       of pest plant management;
                              ii.      a botanist or ecologist with a minimum of 3 years current experience in the field
                                       of pest plant management;
                              iii.     an environmental consultant with a minimum of 3 years current experience in the
                                       field of pest plant management.
                      Biosecurity Act 2014 – Fire Ant Control
               7.     Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
                      individuals and businesses are responsible for ensuring that they follow the movement
                      controls for specific organic materials to help prevent the spread of fire ants within South
                      East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
                      ant biosecurity zone may need a biosecurity instrument permit. More information is available
                      on https://www.fireants.org.au/treat/business-andindustry/movement-controls
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.




                                                                                                          Page 6 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

Page 7

               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required             Subject of the required Development Permit

                Development Permit for Operational Works        Road work, Stormwater, Drainage              work,
                                                                Earthworks, Landscaping, Signage.

                Development Permit for Operational Works        Post clearing rehabilitation works

                Development Permit for Building Works           All building work.

               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.




               Yours faithfully,


               Stacey Clohesy
               Senior Environment Officer | Development Assessment
               Development & Regulation



               Enc:   Appeal Rights
                      Approved Plans/Documents

               cc.    [email protected]




                                                                                                     Page 7 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

Page 8

                                       Referral Agency Response
                                       PLANNING ACT 2016 & PLANNING REGULATION 2017




                                                                                      Page 8 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

Page 9

                                       Page 9 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
‘SARA reference:
Assessment manager:
‘Street address:

Real property description:

Applicant name:
Applicant contact details

Human Rights Act 2019
consderations:

Representations

(2802-50749 SRA

2602-50749 SRA
Noosa Shire Council
‘94 Noosa Drive, Noosa Heads

Lot 3 on SP126203, Lot 203 on SP267424, Lot 0 on SP203417, Lot 0
on SP203415 and Lot 200 on SP267421

Royal Automobile Club of Victoria (RACV) Lid

312 Lake MacDonald Drive
Lake Macdonald QLD 4563
[email protected]

‘The decision has been assessed for compatibility with human rights
under the Human Rights Act 2019. The decision was found not to limit
human rights under the Human Rights Act 2019 therefore it i

reasonable to conclude the decision is compatible with human rights.

An applicant may make representations to @ concurrence agency, at any tne before the application is:
decided, about changing a matter in the referral agency response (5.30 Development Assessment
Rules). Copies of the relevant provisions are in Attachment 4.

A copy of this response has been sent to the applicant for their information.

For further information please contact Helen Reilly, Planning Officer, on 4037 3239 or via email
koala pianning@dsdilgo. qld gov.au who will be pleased to assist.

Yours sincerely

Grace Heatherley
AJ Manager, SEQ West

co Royal Automobile Club of Victoria (RACV) Lid, [email protected]

enc Attachment 1 - Referral agency conditions
Amachment 2 - Advice to the applicant
Amachment 3 - Reasons for referral agency response
Amachment 4 - Representations about a referral agency response provisions
Attachment 5 - Documents raferenced in conditions

‘Stane Assessment and Reforrat Agarcy Page 20f8

Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

Page 9 of 38

Page 10

                                       Page 10 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
Attachment 1—Referral agency conditions

(2802-50749 SRA

 

 

 

 

 

 

 

 

 

 

 

 

(Under section 56(1\D\(0 of the ng Act 2016 tha "a must be to any
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5}
Condition
No. | Conditions
timing
10.10.3.3.1. 1 ~ Development interfering with koala habitat areas outside koata priority areas—The
chief ‘ing the ng Act 2016 i the Director-G of the Depar
of Environment, Tourism, Science and Innovation to be the enforcement authority for the development
to which this development approval relates for the administration and enforcement of any matter
relating to the following conditon(s):
1. | Clearing is limited to the removal of 37 non-juveniie koala habitat trees At all times.
identified as ‘Koala Trees Removed’ on plan titled Operation Works Pian,
prepared by Aspect, dated 2/12/2025, drawing no. 210910_A10-25, issue A,
as amended in red by SARA.
2. | To mitigate impacts on koala habitat values and ensure connectivity is (a) Prior to
maintained: sealing the plan
{a) Enter into an environmental covenant with the Department of the of subdivisior

Environment, Tourism, Science and Innovation in accordance with with the local

Section 97A of the Land Title Act 1993 for the areas identified as Zone government and

1, Zone 2, Zone 4 and Zone 5 in plan titled Conceptual Rehabilitation to be maintained

Plan, prepared by AGLA, dated 27/05/2025, drawing number 100, issue | at all times.

for the purpose of protecting koala habitat and matters of State

environmental significance in perpetuity. The Covenant must detail the (b) Within 6

purpose, responsibilities, liabilities. measures, remedies and intents as Jon of the

necessary to ensure the management of the Covenant Area and must = | ™O"

inchide the follawing: local ,

government's

i That the Owner(s) must comply with the Covenant nolaiion of the

i. That the Owner(s) must take reasonable measures to ensure plan of
the native vegetation and environmental values of the Covenant | «.hdivision.
Area will be maintained and protected.

ii, That the Owner(s) must take all reasonable measures to ensure | (c) Within 2
the Covenant Area is only used in a manner that maintains and | weeks of the
protects the native vegetation and habitat values within the registration of
Covsemneee the covenant,

iv. That the Owner(s) is responsible for taking reasonable action to
rectify any adverse impacts to the Covenant Area. (d) At all times.

v. That only maintenance of understorey vegetation for bushfire
management purposes and tnmming of limbs overhanging the
cabins can be carried out within the covenant area.

vi That any trimming of tree limbs overhanging the cabins must be
carried out by a suitably qualified arborist.

vi. That non-juvenile koala habitat trees must not be removed
within the covenant area for any purpose unless the removal is
necessary to remove of reduce the imminent risk that the tree(s)
pose of serious personal injury or damage to infrastructure.

vill. The following must be excluded from the Covenant Area:

@ All buildings and structures including but not limited to
‘swimming pools, tennis courts, retaining walls, stormwater
infrastructure, wastewater infrastructure, fences (ather than
Stane Assessment and Referral Agancy Page 30t8

Document Set ID: 24866398

Version: 5, Version Date: 16/06/2026

Page 10 of 38

Page 11

                                       Page 11 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
(2602-50749 SRA

 

koala-frendly fencing):

b. Firebreaks (except within the area identified as Zone 4 on
the Conceptual Rehabilitation Plan, prepared by Andrew
Gold Landscape Architecture, drawing no. 100, issue |,
dated 27/06/2025);

c. Earthworks:

¢@  Effvent and wastewater treatment and disposal;

. Placing or storing of soll, rock, rubbish, garbage, waste or
smilar materiats,

f Vehicle access and maneuvering.

@ Parking:

hb Landscaping with species that are not endemic to the
regional ecosystem;

i. Keeping or permitting the entry of domestic animats or any
other animais that are not indigenous to the Covenant Area:
and

j. Any other act which may have an adverse impact on the
values of the Covenant Area.
i Powers of entry.

x A copy of the development approval that established the
Covenant.

{b) Lodge the endorsed Covenant Form 31 with the Registrar of Titles for
the relevant Queensland State Government Authority.

() Submit a copy of the registered Covenant to the Department ofthe
Environment, Tourism, Science and Innovation at:
[email protected] or PO Box 15187 City East
Queensland 4002. (¢) Comply with the Covenant.

(4) Comply with the Covenant.

 

 

 

 

 

 

 

3. | (a) All cearing and construction activities must be carried out in accordance | (a) Prior to any
with Koala Management Plan, RACV Noosa Eco Resort, prepared by building or
Ecoteam Environmental Scientific Services, dated 27 January 2023, operational
version 4. works being

(®) a sick, injured, orphaned or dead koala is identified on site, the tendestohen.
incident must be reported by phoning 1300 264 625 so that treatment
conte ques compat. (2) trey
{c) Mf. Koala is injured, killed or orphaned as a result of site activities, the | identification of
Department of Environment and Science must be contacted within 48 the koala.
hours of the incident occurring via phone on 1300 130 372 (select
Option 4), or via email to [email protected].
{d) A register of all fauna incidents and interactions must be maintained
daily during clearing operations.
{e) A copy of the fauna register must be provided to the Department of the
Environment, Tourism, Science and Innovation at
[email protected] within 10 business days of
completion of clearing works.
Details of the closest wildlife hospital must be kept on site during all
dearing and construction activities

4 (a) Undertake rehabilitation in accordance with the Rehabilitation Works (@) Prior to the
Package, prepared by AGLA. dated 27/05/2025, Issue |. commencement

‘State Assessment and Referral Agency Page 4.0t 8

Document Set ID: 24866398

Version: 5, Version Date: 16/06/2026

Page 11 of 38

Page 12

                                       Page 12 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
 

 

 

 

 

 

 

(>) Maintain any vegetation planted as a result of the rehabilitation work | U8
(c) Submit confirmation by an ecologist that part (a) of this condition has (b) in
been fulfilled to the Department of the Environment, Tourism, Science
and Innovation at [email protected] au or by post to PO the
Box 15187 City East Queensland 4002. Rehabilitation
Works Package.
(c) Within 20
business days of
completing the
works.

5. | Enter into an agreed delivery arrangement to deliver an environmental offset | Prior to
in accordance with the Environmental Offsets Act 2014 to counterbalance commencing any
the significant residual impacts on the matter of state environmental clearing works.
significance being 37 non-juvenile koala habitat trees.

Note: Section 16 of the Environmental Offsets Act 2014 provides that when
an offset condition is imposed on an authority, s number of deemed
conditions are taken to apply. These deemed conditions are detailed in
sections 19B, 22, 24 and 25 of the Environmental Offsets Act 2014.
Contravention of a deemed condition is taken to be contravention af an
imposed condition.

More information on offset delivery can be found here:

https J/www.gid. gov au/environmentipollutian/managementlofisetsidelivering.
Piease send the notice of election to [email protected] Provide Koala friendly measures in accordance with the Koala Sensitive Within 1 month
Design Guideline, prepared by the Department of Environment and Science | of completion of
and dated December 2022, which is to include lit and unlit koala advisory clearing and
signage in accordance with the plan titled Indicative Koala Signage Plan, construction
prepared by Aspect, dated 15/05/2025, drawing No. 21- 0910_A10-12, issue | works.

H.

7. | Any pools to be constructed are to be designed, constructed and maintained | At all times.
as koala-safe pools as described in the Koala Sensitive Design Guideline,
prepared by the Department of Environment and Science and dated
December 2022.

8 Prior to the commencement of clearing activities, notify the Department the 72 hours prior to
of Environment, Tourism, Science and innovation at commencement
[email protected] of: of vegetation
© the expected date the clearing activity will commence; “naeng.
= the expected duration of the clearing activity;

* = the name and contact details of the koala spotter that has been
Contracted for the clearing activity; and

* the name, contact details and authority number of the spotter catcher
that has been contracted for the clearing activity.

 

 

 

Stane Assessmert and Referrat Agancy

Document Set ID: 24866398

Version: 5, Version Date: 16/06/2026

Fage Sof 8

Page 12 of 38

Page 13

                                       Page 13 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
(2602-50749 SRA

Attachment 2—Advice to the applicant

 

 

General advice

 

1.

Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
or the State Development Assessment Provisions (SDAP) (version 3.5). If a word remains
undefined it has its ordinary meaning.

 

The development area contains areas mapped as a high-risk area on the protected plant flora
survey trigger map. Where clearing is proposed within a high-risk area, it is a requirement
under the Nature Conservation Act 1992 to conduct a flora survey in accordance with the Flora
Survey Guidelines to determine if there are any protected plants an the clearing site. if
protected plants are found on the clearing site, a clearing permit under the Nature
Conservation Act 1992 may be required.

 

 

 

The development area contains habitat for threatened and special least concem fauna species.
If the development tampering with a pr animal ing place, a speci
management program may be required.

More information on protected animal breeding places and species management programs can
be found here: https:/lenvironment.des.qid.gov awlicences-permitsiplants-

animals!speciesmanagement-program.

 

 

 

Stane Assessmert and Refeerat Agancy Page Sot 8

Document Set ID: 24866398

Version: 5, Version Date: 16/06/2026

Page 13 of 38

Page 14

                                       Page 14 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
(2802-50749 SRA

Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

 

‘The reasons for the SARA's decision are:

* SARA assessed the development against the following code(s) of the State Development
Assessment Provisions (SDAP), version 3.5:

© State code 25: Development in South East Queensiand koala habitat areas
« ©The development complies with the assessment benchmarks of State code 25 of SDAP in that the
development.
© does not cause an unacceptable impact on mapped koala habitat areas:
© is designed and located to avoid impacts or, where the matters of state environmental
significance cannot be reasonably avoided, impacts are reasonably minimised and mitigated
© does not result in a significant residual impact on a matter of state environmental significance
unless the significant residual impact is acceptable, and an offset is provided.
Material used in the assessment of the application:
«the development application material and submitted plans
«Planning Act 2016
«Planning Regulation 2017
© the SDAP (version 3.5), as published by SARA
© the Development Assessment Rules
* SARA DA Mapping system
¢ section 58 of the Human Rights Act 2019

Attachment 4—Representations about a referral agency response
provisions

 

(page oft intortionaity blank)

‘State Assessment and Referral Agency Page Tot 8

Document Set ID: 24866398 Page 14 of 38

Version: 5, Version Date: 16/06/2026

Page 15

                                       Page 15 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
(2502-50749 SRA

Attachment 5—Documents referenced in conditions

 

(page tof innortonatty blank)

Stane Assessment and Referral Agancy Page sate

Document Set ID: 24866398 Page 15 of 38

Version: 5, Version Date: 16/06/2026

Page 16

                                       Page 16 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
Development Assessment Rules—Representations about a
referral agency response

The following provisions are those set out in sections 28 and 30 of the Development Assessment Rules’
regarding representations about a referral agency response

Part 6: Changes to the application and referral agency
responses

 

28 Concurrence agency changes its response or gives a late response

28.1. Despite part 2. a concurrence agency may, after its referral agency assessment period and any
further period agreed ends, change its referral agency response or give a late referral agency
response before the application is decided, subject to section 28.2 and 28.3.

28.2. A concurrence agency may change its referral agency response at any time before the application
(a) the change is in response to a change which the assessment manager is satisfied is a change

under section 26.1; or
(b) the Minister has given the concurrence agency a direction under section 99 of the Act: or
(c) the applicant has given written agreement to the change to the referral agency response.*

28.3. A concurrence agency may give a late referral agency response before the application is decided.
if the applicant has given written agreement to the late referral agency response.
28.4. Ifa concurrence agency proposes to change its referral agency response under section 28.2(a),
the concurrence agency must—
(a) give notice of its intention to change its referral agency response to the assessment manager
and a copy to the applicant within 5 days of receiving notice of the change under section 25.1;
and
(b) the concurrence agency has 10 days from the day of giving notice under paragraph (a). or a
further period agreed between the applicant and the concurrence agency, to give an amended
referral agency response to the assessment manager and a copy to the applicant.

* Pursuant to Section 68 of the Planning Act 2016

2 In the instance an applicant has made representations to the concurrence agency under section 30,
and the concurrence agency agrees to make the change included in the representations, section
28.2(c) is taken to have been satisfied.

Page tof?

Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

Page 16 of 38

Page 17

                                       Page 17 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
Part 7: Miscellaneous

30 Representations about a referral agency response

20.1. An applicant may make representations to a concurrence agency at any time before the application
is decided, about changing a matter in the referral agency response.*

2 An applicant may elect, under section 32_ to stop the assessment manager's decision period in which
to take this action. If a concurrence agency wishes to amend their response in relation to
representations made under this section, they must do so in accordance with section 28.

Page 2 of 2

Document Set ID: 24866398 Page 17 of 38

Version: 5, Version Date: 16/06/2026

Page 18

                                       Page 18 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
 

6 e =a ©

; o =< @

3 w wsmas-remn

@ UNSUTAREE -FEMNE

ALLSURVEYED TREES ONSITE 242}
TREES RETANED (ny
TREES REMOVED (ry
NOAA TREES ON STE (ny
NOMA TREES RETANED is

    

OPERATION WORKS PLAN
o= woe =
oie
S fore aoas 2

PLANS AND DOCUMENTS
referred to inthe REFERRAL

AGENCY RESPONSE
SARA ref: —2802.50749 SRA
Date: 24 Apel 2028

Amended in red by SARA on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROPOSED RACV NOOSA RESORT
142 NOOSA DRIVE, NOOSA HEADS

Rehabilitation Works Package
Prepared

By For

‘J MILLS
OAKLEY

PLANS AND DOCUMENTS:
referred to inthe REFERRAL

AGENCY RESPONSE =

 

 

 

 

sre cy nec sc8e
+2 NOCEA CAINE, NOOEA HEADS

 

 

Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

SARA ref: 2002:80749 SRA coven cer
Date: AMD. sors
[ROTFOR CONSTRUCTION]

145

Page 18 of 38

Page 19

                                       Page 19 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

342 NOOEA DRIVE, NOH HEADS

 

 

 

 

Sa seeyamestaron NOTES

 

Re or Mone =

NOT FOR CONSTRUCTION

 

 

 

 

 

 

 

 

 

 

 

 

 

146

 

 

 

    

 

yee

  

 

sre ic cea est
$2 NOCEA DRIVE, NOOEA MEADS

seuMestATION RANTING

 

 

SCHEDULE
Ee ee

 

 

NOT FOR CONSTRUCTION |

 

 

 

 

147

Page 19 of 38
Document Set ID: 24866398

Version: 5, Version Date: 16/06/2026

Page 20

                                       Page 20 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
 

 

gp teeeeee

   

§ teeeeene

perce

j teeeeee

 

j Ceeeeeceeeccececes

 

—— ss 32 NOOEA SHINE, NOOEA HEADS
seraaustaron naNTNG
SCHEDULE

em “ows

148

 

 

 

 

 

 

 

 

 

 

 

 

    
  

© PRINT IN COLOUR
. St mamoen.

 

PLANS AND DOCUMENTS
referred to in the REFERRAL

— @®

[ae

AGENCY RESPONSE SS.
SARA ref: —7802:50749 SRA. CONCEPTUAL REMABLITATION
Date: 24 Apel 2026, sors

 

 

 

NOT FOR CONSTRUCTION

 

 

 

149

Document Set ID: 24866398 Page 20 of 38

Version: 5, Version Date: 16/06/2026

Page 21

                                       Page 21 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
Koala Management Plan

 

Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

 

 

RACV Noosa Eco Resort

142 Noosa Drive, Noosa, Queensland

PLANS AND DOCUMENTS
referred to in the REFERRAL

AGENCY RESPONSE =
SARA ref: #0250748 SRA
Date: PANN MB

Page 21 of 38

Page 22

                                       Page 22 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
Contents

44

24

34
32

Beeeer

Introduction...

Development at 142 Noosa Drive, Noosa
Responsibilities
Nominated Person responsible for the Koala Management Plan
Induction to the Koala Management Plan and responsibilities of personnel
Planning
Koala risk assessments 6

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

7

7
Risk of Vehicle Strike 7
Bushfire 8
Disease 8
Swimming Pool Drowning 8
Harm During Construction 8
Habitat Loss, Degradation and Fragmentation ane 9
Changes to Koala Habitat. 9
Dog Predation 9
Non-Dog Predation. 3
Risk of Vehicle Strike 10

 

 

 

 

Koala detection and retention of trees during operations.

 

 

 

 

 

Spraying herbicides or pesticides... oceans 12
Koala welfare

Koala welfare check procedure

Details of local veterinarians and wildlife carers. 13
Koala assessment and handling eee

Koala incident pros 13
Evaluation and review. 15

 

 

Koala Management Plan Version 4 Approved by: W Ellis Date approved: 27 tan 2023

Document Set ID: 24866398

Version: 5, Version Date: 16/06/2026

Page 22 of 38

Page 23

                                       Page 23 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
1. Introduction

Since February 2022, koalas (Phascolarctos cinereus) have been listed as endangered
under the Commonwealth Environment Protection Biodiversity Conservation Act 1999,
applying increased level of protection for koalas in Queensland, New South Wales, and
the Australian Capital Territory. Under Queensiand’s Nature Conservation Act (1992) the
koala was listed as an endangered species in 2020.

Koalas live over a range of open forest and woodland communities, with habitat quality
reliant on the presence of food trees. Koalas are found in higher densities where food
trees are growing on more fertile soils and along watercourses.

The distribution of koalas covers much of Queensland, with some historically dense
populations in the southeast. Noosa has been home to koalas since records of presence
began, however anecdotal data confirms that the declines documented for other areas of
the state extend to this area of their range.

This Koala Management Plan sets out the requirements for training and induction of staff,
planning operations that may impact koalas, undertaking those operations, addressing the
welfare of impacted koalas and review of this plan.

It is mandatory that the approved Koala Management Plan is implemented.

14 Development at 142 Noosa Drive, Noosa

Under the Noosa Plan 2020, the 6.4 Ha (approx.) site is mapped as connecting habitat
area, tourist accommodation, area of biodiversity significance and is subject to the
Biodiversity, Waterways and Wetlands Overlay Code. The land is mapped by the State as
Category B remnant vegetation and, significantly, has recently been mapped as core koala
habitat. It lies outside of a Koala Priority Area.

With Eucalyptus robusta, a known koala food tree, common across the subject site, its
value to koalas lies in both food and shelter resources. However, encroachment of weeds,

Koala Management Plan Venion 4 Approved by: W Ellis Date approved: 27 san 2023
3

Document Set ID: 24866398 Page 23 of 38

Version: 5, Version Date: 16/06/2026

Page 24

                                       Page 24 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
particularly frangipani vine (Chonemorpha fragrans) threatens the habitat quality for
koalas, strangling the canopy and hindering on -ground movement of koalas.

The site is mapped as Melaleuca dominated palustrine wetlands (seasonally inundated
open forests and woodlands) joining Eucalyptus open forest to the north along Noosa
Drive and heathlands and associated scrubs behind the current RACV resort site. The
potential connections (with respect to koala habitat) are narrow beyond the site boundaries
to the north and south, consistent with the regulated vegetation mapping, indicating a
narrow band of appropriate vegetation extending north, with some southem connection to
Leslie Park and Weyba Bridge Park, fringing the mangrove and heathlands. As a result,
the site forms part of a bisected patch of habitat that could provide refuge for in-transit
koalas moving between the larger patches associated with Noosa National Park to the
north and bushland to the south of Eenie Creek Rd.

The tenuous links notwithstanding, the management of patches of habitat such as this site
are vital for the persistence of koalas around Noosa. If this site continues to degrade
because of tree death caused by enguifing vines, the north-south avenue for movement of
koalas will be further diminished or lost. A careful approach to the development of the site,
however, could ensure the quality and quantum of koala habitat is improved.

Acting together, the subject site, council reserve and Leslie Park (across the busy Noosa
Drive) constitute a significant node of koala habitat for the local area.

In 2008, under the Integrated Planning Act 1997, an application was approved to establish
multiple (10) units on the site. In consultation with ecologists, that approval lapsed, and
two improved (interim) proposals were developed, before the current proposal was.
developed. The current approach seeks to establish “eco-cabins” (Attachment 1) amongst
the natural vegetation, retaining connections for ground based and arboreal species by
building above the ground. The goal is to develop the site in a manner that will enhance
habitat connectivity and quality to benefit koalas in Noosa.

Koala Management Plan Version 4 Approved by: W Ellis Date approved: 27 tan 2023

Document Set ID: 24866398 Page 24 of 38

Version: 5, Version Date: 16/06/2026

Page 25

                                       Page 25 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
2. Responsibilities

Objective: All personnel involved in site activities know their responsibilities for koala
management and welfare and can perform the required tasks to minimise koala welfare
risks.

241 Nominated Person responsible for the Koala Management Plan

The following is the person who has been nominated as responsible for maintaining,
implementing, and reviewing the Koala Management Plan. This person will be the main
contact for Queensland Parks and Wildlife Service (QPWS) in relation to this plan. QPWS
must be notified by email within 48hrs of changes in this role.

 

 

 

 

 

 

 

 

 

Name:

Position title:

Telephone (office):

Telephone (mobile):

Email:
2.2. Induction to the Koala Management Plan and responsibilities of
personnel

All personne! working on site must receive an induction to this Koala Management Plan
and be made aware of their responsibilities under this Koala Management Plan, and their
legislative responsibilities under The Nature Conservation Act (Qid) 1992.

© Introduction to site
a. Prior to work a copy of the Koala Management Plan must be made available
to any person tasked with operational activity on site.
b. Acknowledgement of this must be diarised by the site supervisor (or person
appointed to oversee work) and retained.

Koala Management Plan Venion 4 Approved by: Ww Ellis Date approved: 27 dan 2023

Document Set ID: 24866398 Page 25 of 38

Version: 5, Version Date: 16/06/2026

Page 26

                                       Page 26 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
3. Planning

Objective: Ensure that the welfare of koalas during and after operational activities is

considered and that no koalas are negatively impacted by operations on site.

3.1

Pre work and daily risk assessment *(as below) must be conducted to identify potential risks
to koalas from operations, including stress, injury, exposure, death and orphaning of joeys,

Koala risk assessments

and options to mitigate these risks.

3.2

Koala Management Plan Verion 4 Approved by: W Ellis Date approved: 27 Jan 2023

Document Set ID: 24866398

RACV Risk Assessment Template

 

 

Koala Daily Risk Assessment RACV

All work

@) impacting the removal of vegetation;
b) involving creation of noise, Wahi or Gust
wee requiring the use of machinery on
te prboeded by the folomng ick Assessment Procedure

1. Pre-start inspection: visual inspection of ground in vicinity of work environment
for the presence of koala scat.
@ Scat present record scat presence, move to section 2
b. None present: move to section 2

2. All trees within 15 m of the areas of operation are visually checked for the
presence of koalas.

@ Koala present record presence (iNaturalist) no work within 15 m of tree
containing koala, noise and activity reduced, minimal interference
procedures only

b. Enact Koala Welfare Check procedure

c. No koala present: proceed to section 3

3. Conduct all other pre-start safety activities and commence work
@ If vegetation is to be removed, this must be done in accordance with
current (at the date of clearing) best practice and under the guidance of
a koala spotter catcher.

 

 

Version: 5, Version Date: 16/06/2026

Page 26 of 38

Page 27

                                       Page 27 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
4. Threat Assessment and Identification
41 Habitat Loss, Degradation and Fragmentation

Quantifying and providing remedies to habitat loss, degradation and fragmentation are
difficult tasks for landscape managers. The size and structure of extant vegetation, the
occurrence of anthropogenic edges and the connectivity of the landscape are just some of
the variables that require attention as landscape modification proceeds.

The site is part of a fragmented landscape within the Noosa region. Bounded and
intersected by roads, open space, and non-native vegetation, the local area has
experienced historical disturbance impacting its vegetative integrity.

There will be some transitional loss of koala habitat and connectivity until replanting and
weed management results in a net gain at this location, and this represents a transitional
threat to koala populations. A key element of the koala management plan is the retention
and care of, and replacement where necessary of, all retained vegetation of value to
koalas on the site.

42 Dog Predation

Dog predation of koalas can have a significant impact on populations (Robbins et al. 2019)
and is a likely under-reported cause of population declines (unpublished data — Tyagarah
NSW).

It is probable that koalas navigating newly cleared areas of their range will spend more
time on the ground than they otherwise may, because the usual pattern of habitat and
spacing of trees will be disrupted.

43 Other Predators (Native and Feral)

Previous studies have identified that non-dog predators (specifically pythons) posed a
greater risk to koalas than was previously thought (Robbins et al. 2019), and owls and
eagles are also known to prey on koalas. The cause of any koala death on or near the site
will be recorded and reported (see koala welfare).

ad Risk of Vehicle Strike

Vehicle strike is a major cause of koala population decline (Preece 2007) particularly as
urbanisation encroaches upon natural habitat. Impacts on site (due to the road network
associated with the project) and offsite (because of traffic flow) are highly probable and will

Koala Management Plan Version 4 Approved by: We Ellis Date approved: 27 Jan 2023

Document Set ID: 24866398 Page 27 of 38

Version: 5, Version Date: 16/06/2026

Page 28

                                       Page 28 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
require effective mitigation measures to preserve the connectivity and safety of koala
habitat around the development.

4.5 Bushfire

Bushfire presents a clear danger to koalas, however standards that apply to development
can alleviate this risk in some locations and a bushfire expert has been engaged for the

current project.

4.6 Disease

Disease has also been identified as a key driver of population decline in southeast
Queensland, and it is probable that infected koalas may occur in the vicinity if not within
the project site. It is possible that disease impact in koala populations is stress-mediated
and that habitat alienation is a contributing factor in this process.

47 Swimming Pool Drowning

Koalas have been recorded as drowning in private swimming pools, hence careful
incorporation of features (such as edge design, exclusion fencing) must be considered to
mitigate the possibility of such events. Ongoing monitoring of wildlife and education of
human residents will be a key to identifying and mitigating this threat.

48 Harm During Construction

There are risks associated with any construction process, hence daily risk assessment (as
described above) and adherence to correct clearing protocols (e.g. the use of spotter
catchers) is necessary at any development site in koala habitat areas.

Koala Management Plan Version 4 Approved by: W Ellis Date approved: 27 tan 2023

Document Set ID: 24866398 Page 28 of 38

Version: 5, Version Date: 16/06/2026

Page 29

                                       Page 29 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
5. Threat Mitigation

51 Habitat Loss, Degradation and Fragmentation

The project is designed to retain habitat connectivity and prevent habitat alienation for
koalas. Concurrent vegetation management to reduce weeds and enhancement plantings
should result in only a transient reduction in habitat quality, with no loss of connectivity or
long-term reduction in food resources. The overall impact on fragmentation will be minimal
because extant connectivity will remain — koala sensitive design of any fencing and other
structures and raised boardwalks (> 30 cm) will retain a permeable habitat for koalas.

The revegetation and habitat enhancement (weeding and augmented plating) activities
should ensure only a transient reduction in carrying capacity at the site.

5.2 Changes to Koala Habitat

Changes in koala habitat will result from the initial reduction in food tree availability,
mitigated by enhanced tree health resulting from the removal of choking vines and the
planting of replacement food trees. These changes are intended to mitigate a short-term
reduction in koala habitat as vegetation clearing progresses. Once the works to establish
structures on the site are completed, the retained vegetation with respect to koala food
and habitat trees will conform to the tree retention plan identified in the Arboricultural
Response Statement (Attachment 2) for the site. Ongoing assessment of the health of
retained trees will be conducted at regular intervals and also in response to any concerns
(e.g. personal safety) that may arise as a result of natural tree growth. Where trees are
required to be pruned, this will be in accordance with expert arborist advice.

5.3 Dog Predation

Dogs and other domestic pets are prohibited within the site confines. Unrestrained dogs
will be able to access the site using the koala sensitive design features and a co-ordinated
approach with Noosa Council is proposed to reduce the incidence of such incursions.

54 Non-Dog Predation

Other than feral species, the natural predation of koalas is not to be interfered with unless
it is deemed to be because of project activities predisposing the koala to danger of
predation. This can include examples such as:

Koala Management Plan Version 4 Approved by. We Ellis Date approved: 27 tan 2023

Document Set ID: 24866398 Page 29 of 38

Version: 5, Version Date: 16/06/2026

Page 30

                                       Page 30 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
a) Circumstances where a koala is moving across open ground where previously
habitat existed (but is cleared), hence exposing the koala where otherwise it would
be hidden from predators.

b) Occasions where a koala is disturbed from a location by construction or other
activity such that it is predisposed to predation, such as climbing high to avoid
activity or ascending a tree if disturbed whilst on the ground.

In these situations, predators will not be interfered with, but koalas will be monitored and
any necessary steps (such as local relocation to adjacent tree, or perhaps erection of
protective screening from aerial predators) will be initiated by an authorised person (see
koala welfare), so that the threat posed because of activity at the site is removed. Koalas
may be subject to aerial predation if they are unable to shelter in a dense canopy, for
example.

5.5 Risk of Vehicle Strike

Akoala road crossing area is required to be established to limit the current risk of road
death for koalas on Noosa Drive — this is a pre-existing threat as indicated by records. The
exact detail of this and appropriate road treatment is yet not determined and may change
over time as new approaches are assessed. In the absence of development at the site it is
hoped that Noosa Council will address this existing threat. A co-ordinated approach
between the developer and council is likely to result in an enhanced outcome.

Itis proposed that:

* Lighting and signage will be provided at a potential koala crossing point, to reduce
koala and vehicle collisions. This should include signage at the entry roads to the
local roundabout — signage agreed to be “best practice” in consultation with council
and government experts.

© In addition to driver awareness signage, vegetation management will ensure
visibility of koalas, for example by reducing ground cover adjacent to the road,

© Road treatment should include coloured paving and calming elements to alert
drivers to the presence of koalas and other wildlife, as well as lighting to increase
visibility.

© Signage will be prominent at the approach to wildlife crossing points.

¢ In particular, the hours of dawn and dusk are times at which koalas are active and
susceptible to road trauma, so clear driver education will form part of the approach
to mitigating road fatalities.

Koala Management Plan Version 4 Approved by: We Ellis Date approved: 27 san 2023
10

Document Set ID: 24866398 Page 30 of 38

Version: 5, Version Date: 16/06/2026

Page 31

                                       Page 31 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
5.6 Bushfire

A bushfire expert report has been provided: actions in consultation with the arborist advice
to maintain the low threat noting no NJKHT to be removed in covenanted area.

Koala Management Plan Version 4 Approved by. We Ellis Date approved: 27 tan 2023

Pi 1 of 38
Document Set ID: 24866398 ‘age 31 of 3

Version: 5, Version Date: 16/06/2026

Page 32

                                       Page 32 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
6 Operational Work

Objective: Ensure koala welfare and minimise the impacts on koalas during and post
operations.

6.1 Koala detection and retention of trees during operations

Koalas may be endangered by a range of operational works that interfere with vegetation
or involve machinery working on site.

a. The Koala Daily Risk Assessment RACV must be undertaken prior to all work on site
each day.

b. All koala detection checks and koalas located must be recorded. In general:

a. When a koala is detected prior to or during operations, the tree in which the
koala is located should be in the centre of the retained trees within a 15 m
radius. Retained trees must only be removed once koalas are no longer
present.

b. Trees where koalas are located and the additional trees to be retained must
be clearly marked using a standardised marking system that is clearly visible.

c. Where koalas are detected, they must be monitored by a spotter until the
operation is complete to ensure they do not move into danger.

c. Tree retention and removal during operational works will conform to the Arboricultural
Response Statement (Attachment 2).

6.2 Spraying herbicides or pesticides

Spraying with herbicides / pesticides is subject to the same koala risk assessment process
as other activities. Especially during the breeding season, spraying of vegetation is not
recommended and should be avoided. Due to the small size of the site and ongoing
management of vegetation, manual removal of pest and weed vegetation is required.

Koala Management Plan Version 4 Approved by: W Ellis Date approved: 27 Jan 2023
12

Document Set ID: 24866398 Page 32 of 38

Version: 5, Version Date: 16/06/2026

Page 33

                                       Page 33 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
7 Koala welfare

Objective: That injured or orphaned koalas are managed in a humane manner.
7A Koala welfare check procedure

The koala welfare assessment process is triggered by the Koala Daily Risk Assessment
RACV when a koala is sighted. If a koala is identified in pre-start searches:
*® Observation using binoculars is recommended
* Ifo signs of ill health appear (e.g. stained rump, injury or ocular discharge) the
koala is left in situ and standard practice applies (see the Koala Daily Risk
Assessment RACV).
* If signs of ill health are apparent, the nominated local koala care group is to be
contacted and their instructions complied with until the koala is assessed by them.
No work is to commence until such action is completed.

The welfare assessment records must be kept and send to QPWS and Koala
Assessments and Compliance ([email protected]) as soon as practicable
after the assessment, preferably within 24hrs. This is the responsibility of the koala care
group.

7.2 Details of local veterinarians and wildlife carers

Details of local vets and carers must be always kept on site and must be available to all
employees.

Any sick or injured koala will be reported through the Queensland Government approved
process of calling 1300 ANIMAL (1300264625).

7.3 Koala assessment and handling

No employees or contractors are authorised to interfere with koalas. Any activities requiring
interfering with koalas are to be undertaken by trained and authorised koala carers (or via
1300264625).

74 Koala incident process
The following koala incident process must be followed.
1) Koala sighting on site:
a) Record, report act in accordance with the Koala Daily Risk Assessment RACV.

Koala Management Plan Version 4 Approved by: W Ellis Date approved: 27 san 2023
3

Document Set ID: 24866398 Page 33 of 38

Version: 5, Version Date: 16/06/2026

Page 34

                                       Page 34 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
2) Koala not detected but found during operations
a) Stop work, record, report. Review processes and re-start the Koala Daily Risk
Assessment RACV.
3) Sick/injured koala on site
a) Stop work, report, record, contact carer (1300264625), follow instructions.
4) Orphan koala (dependent young without mother) on site
a) Stop work, report, record, contact carer (1300264625), follow instructions.

Koala Management Plan Version 4 Approved by: We Ellis Date approved: 27 Jan 2023
“4

Document Set ID: 24866398 Page 34 of 38

Version: 5, Version Date: 16/06/2026

Page 35

                                       Page 35 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
8 Evaluation and review

Objective: Continuous improvement of the koala management system to ensure that the
Koala Management Plan is effective and includes the most up-to-date information.

81 Koala management plan review

A review of the Koala Management Pian must be undertaken annually, led by the
Nominated Person responsible for the Koala Management Plan considering:

a. Incidents and near-misses
. Welfare issues encountered
. Review of compliance with tree retention and habitat quality assessment
. Procedural issues
. New technology or scientific understanding
Results of compliance recommendations, and
|. Changes to the requirements set by QPWS.

os

om oO a

The review will include the above considerations and necessarily have endorsement from
a qualified arborist / ecologist confirming tree retention and habitat quality outcomes
consistent with the goals of this plan and agreed conditions of project approval. The
outcome of the review must be recorded and retained. Where the review identifies that
amendments to the Koala Management Plan are necessary, the plan must be updated to
reflect the required amendments. Where remedial action is required (for example with
respect to koala habitat quality), a plan of activities must be provided as part of the review.
Changes to the Koala Management Plan must be provided to QPWS for review prior to the
changes being implemented.

Koala Management Plan Venion 4 Approved by: w lis Date approved: 27 san 2023
35

Document Set ID: 24866398 Page 35 of 38

Version: 5, Version Date: 16/06/2026

Page 36

                                       Page 36 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
References

Preece, H. (2007). Monitoring and modelling threats to koala populations in rapidly urbanising landscapes:
Koala Coast, south east Queensiand, Australia. Ph. D Thesis, The University of Queensland,
Brisbane

Robbins, A, Loader, J.. de Villiers, D., Beyer, H.L., and Hanger, J. (2019). Predation by carpet pythons
(Morelia spilota) is an important cause of mortality in a free-living koala (Phascolarctos cinereus)
Population in South East Queensland. Australian Veterinary Journal 97(9), 351-356.

10.111 t/avj.12840

Koala Management Plan Venion 4 Approved by Ww Elis Date approved: 27 Jan 2023

Document Set ID: 24866398 Page 36 of 38

Version: 5, Version Date: 16/06/2026

Page 37

                                       Page 37 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026


[OCR of page images]
 

 

 

 

 

®

PLANS AND DOCUMENTS
ralerred to is the REFERRAL

AGENCY RESPONSE
SARA ref, FWRAETHESAA
24 om 2008

Oate

 

 

 

 

Page 37 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

Page 38

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 38 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

Used in these records

About this file

File size
4.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice OPW25 0206 (AS Published).pdf · 4.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.