Attachment B - Bushfire Management Plan

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
1.0 INTRODUCTION
Wollemi Eco-Logical has been commissioned to undertake a Site-Specific Bushfire Hazard
Assessment and to prepare a Bushfire Management Plan for a proposed development on the
subject site (Figure 1).

This report aims to assess the Bushfire Hazard and risk to the proposed development with
regard to the Queensland State Government Single State Planning Policy - Part E (SPP 2017),
the Bushfire Resilient Communities Technical Reference Guide (QFES, 2019) and the Noosa
Plan 2017, Division 9 – Natural Hazards Overlays Code, and the Australian Standard –
Construction in Bushfire Prone Areas (AS3959-2018). These documents detail both the State
and Council interest in Bushfire Hazard with regard to determining suitability of development
applications. It is noted that the Bushfire Hazard Assessment methodology is current as at
March 2019.

Subsequently, this report references currently available best-practice Bushfire Hazard
Assessment and Risk Mitigation Methodologies, from the following sources: Vegetation
Hazard Classification & Potential Fire-line Intensity for Queensland sourced from ‘A new
methodology for state-wide mapping of bushfire prone areas in Queensland’. CSIRO,
Australia. (2014); Bushfire Attack Level (BAL), Building setback requirements and Construction
Standards as per the Australian Standard AS 3959- 2018 - Construction of buildings in bushfire
prone areas. These methodologies are used in conjunction with Noosa Shire Council (NSC)
Planning Scheme requirements to ensure appropriate assessment and mitigation of potential
bushfire hazard is undertaken.
Vegetation composition and extent, slope and industry standard Fuel Load calculations will
be used to determine the Potential Bushfire Hazard acting on the proposed development.
Once determined, Bushfire Risk Mitigation Measures are detailed in order to demonstrate
compliance with Councils Planning Scheme performance outcome to ensure the safety of
people and property in the event of a bushfire emergency.
This BMP has been prepared by a suitably qualified Bushfire Consultant with 20 years relevant
experience in Environmental Management & Bushfire Planning and Design experience
specific to South East Queensland. It is noted that the following Bushfire Hazard Assessment
Methodology and Bushfire Risk Mitigation Measures applied are current as at 2019.




 30 April 2021                35 Rules Road, Pomona - Bushfire Management Plan V5         Page 4
                                            www.wollemi-eco.com.au
Log in to download the original file

Attachment B - Bushfire Management Plan.pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.