Approved Plan - Negotiated - OPW23 0075

of 1

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
        LEGEND:
                      GRADE / FALL

                      CLEAN WATER FLOW

                      DIVERSION BUND/BERM

                      SEDIMENT FENCE                                                                                                                                                         OVERLAND FLOW
                                                                                                                                                                                             PATH. REFER D03 FOR
                      SITE AREA                                                                                                                                                              FLOOD RISK




                  NOOSA COUNCIL                                        SEDIMENT FENCE
                                                                       INSTALLED ON
                 APPROVED PLAN                                         EXTENT OF
               OPW23/0075 30 MAY 2023                                  DISTURBANCE




                                                                                                                                       EXISTING SPOIL LOCATION
                                                                                                                                       (APPROXIMATE)


                                                                                                                                                                                                                                                   STOCKPILE AND BUND MUST BE
                                                                                                                                                                                                                                                   STABILISED TO ACHIEVE STATE PLANNING
                                                                                             SIX MILE CREEK                                                                                                                                        POLICY REQUIREMENTS. USE SOIL BINDER
                                                                                             TRIBUTARY. REFER                                                                                                                                      FOR TEMPORARY EROSION CONTROL, OR
                                                                                             D03 FOR FLOOD RISK                                                                                                                                    HYDROMULCH OR SEEDING (COUPLED
                                                                                                                                                                                                                                                   WITH BINDER OR JUTE MESH) FOR
                                                                                                                                                                                                                                                   PERMANENT STABILISATION.




                                                                                                                                                                                                                                 USE STOCKPILE MATERIAL TO
                                                                                                                                                                                                                                 FORM BUND ON UPSLOPE
                                                                                                                                                                                                                                 BOUNDARY TO DIVERT OVERLAND
                                                                                                                                                                                                                                 FLOW




                                                                                                                                                                                           CLIENT                                                  PROJECT
                                                                                                                                                                 COPYRIGHT C                                                CMC                                 SIX MILE CREEK BRIDGE REPLACEMENT
                                                                                                                                                             TOPO GROUP PTY LTD
                                                                                                                                                                                           DRAWN                   DESIGNED          DATE          DRAWING TITLE

                                          B       RPEQ CERTIFICATION                    SC          3/05/23                                           THIS DOCUMENT MAY NOT BE COPIED OR            TB                      TB          21/04/23           EROSION AND SEDIMENT CONTROL PLAN
                                                                                                                               ISSUED FOR USE         TRANSMITTED IN ANY FORM OR BY ANY
                                          A       ORIGINAL ISSUE                        TB          21/04/23                                          MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                           RPEQ / SIGNATURE (IF REQUIRED)                              48 PRINCESS STREET, COORAN SPOIL LOCATION
                                                                                                                  NORTH   A3                          THE WRITTEN CONSENT OF TOPO GROUP                                       CPESC 6374           PROJECT No                DRAWING No         REVISION
                                       REVISION   DESCRIPTION                    APPROVED BY         DATE                                                           PTY LTD.                                                  RPEQ 15545                        22-0255                   D02        A
Document Set ID: 22421632
Version: 1, Version Date: 10/05/2023
Log in to download the original file

Approved Plan - Negotiated - OPW23 0075.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.