Plans, and supportive documents, detailing these proposed foundations shall be designed
by a registered practicing Geotechnical Engineer and submitted with the application for a
Development Permit for Operational Works.
Town Water Supply
28. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
29. Each water connection to the water reticulation system shall extend to the property boundary
and be metered. Where multiple units are served by a single service, multiple water meters
to each individual unit shall be installed. All fees for the supply of water meters shall be paid
to the Council.
Earthworks
30. Any earthworks required on site shall be carried out in a manner that does not affect any of
the neighbouring properties. To this end, earthworks shall be in accordance with Section 3.8
of Council’s Engineering Design Standards Manual and carried out so as not to cause the
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
watercourses.
Erosion and Sediment Control
31. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required
to be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Headworks
32. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates as of March 2002 under the current policies is as follows:
Water Supply $ 4,497
Sewerage $ 3,228
TOTAL $ 7,725
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
General
33. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
34. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
Page 6 of 9
Document Set ID: 25189544
Version: 6, Version Date: 23/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132002 220222 1 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 167 KB (small file)
- File type
No other editions are linked here.