BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Gympie Terrace foreshore Enforcement action has commenced Monitor and action as necessary. Monitor.
encroachments against several business owners on
the Gympie Terrace foreshore. The
majority of businesses have
complied however compliance
notices are now in place for two
noncompliant owners.
Waste & Environmental Health
Waste
New waste contract Commenced mobilisation of the next Roll out garden waste bins to Implement the mobilisation plan for
waste management contract that mandated service area in August the commencement of the new
starts in September 2017. 2017. contract in September 2017.
Monitor the mobilisation of the new Apply the policy for exemptions from
waste management contract garden waste service.
commencing in September 2017. Manage the change in additional bin
Order wheelie bins and notify service types such as bulk waste
residents of the pending service. and bulk recycling and implement
charges in accordance with the
revenue statement.
Capping New methane gas capture bores LMS are currently evaluating the Monitor and report on increase in
have been installed by LMS which enhanced gas capture rates which methane capture and extraction.
has resulted in a substantial have occurred following the Meet with LMS to determine
increase in gas capture and flaring. completed capping of cells 2.1 at the potential for power generation if
LMS are reviewing the stability of the landfill. monitoring shows viable power
gas capture with a view to generation.
investigating the generation of
electricity from the gas instead of
flaring.
Capital works Installation of probes at the HES Construct a new shed for storage at Provide asphalt to the outdoor
basin and monitoring equipment has the Briteside facility in preparation storage area at Briteside Tip Shop.
been completed. for a renewal of the Tip Shop licence Construct a new shed at the
Work completed on the construction to occupy. Briteside Tip Shop facility.
of entry road into the landfill. Commence obtaining estimates for
Signage at Landfill entrance the 2018/19 capital works program.
completed.
Waste contractor’s car parking area
completed.
Upgraded Hardstand at Cooroy
Transfer Station completed.
2016/17 Capital Works completed.
Page 112 of 146
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.