Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2017-08-08 Services & Organisation Committee Agenda

of 146

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

BRANCH ACTIVITIES                    RECENT ACHIEVEMENTS                             CURRENT PRIORITIES                           THE NEXT QUARTER
Gympie        Terrace    foreshore      Enforcement action has commenced              Monitor and action as necessary.         Monitor.
encroachments                             against several business owners on
                                          the Gympie Terrace foreshore. The
                                          majority   of    businesses    have
                                          complied    however      compliance
                                          notices are now in place for two
                                          noncompliant owners.
Waste & Environmental Health
Waste
New waste contract                      Commenced mobilisation of the next            Roll out garden waste bins to              Implement the mobilisation plan for
                                          waste management contract that                  mandated service area in August              the commencement of the new
                                          starts in September 2017.                       2017.                                        contract in September 2017.
                                                                                        Monitor the mobilisation of the new        Apply the policy for exemptions from
                                                                                          waste      management        contract        garden waste service.
                                                                                          commencing in September 2017.              Manage the change in additional bin
                                                                                        Order wheelie bins and notify                service types such as bulk waste
                                                                                          residents of the pending service.            and bulk recycling and implement
                                                                                                                                       charges in accordance with the
                                                                                                                                       revenue statement.
Capping                                 New methane gas capture bores                 LMS are currently evaluating the           Monitor and report on increase in
                                          have been installed by LMS which                enhanced gas capture rates which             methane capture and extraction.
                                          has resulted in a substantial                   have      occurred following      the      Meet with LMS to determine
                                          increase in gas capture and flaring.            completed capping of cells 2.1 at the        potential for power generation if
                                        LMS are reviewing the stability of the          landfill.                                    monitoring shows viable power
                                          gas capture with a view to                                                                   generation.
                                          investigating the generation of
                                          electricity from the gas instead of
                                          flaring.
Capital works                           Installation of probes at the HES             Construct a new shed for storage at        Provide asphalt to the outdoor
                                          basin and monitoring equipment has              the Briteside facility in preparation        storage area at Briteside Tip Shop.
                                          been completed.                                 for a renewal of the Tip Shop licence      Construct a new shed at the
                                        Work completed on the construction              to occupy.                                   Briteside Tip Shop facility.
                                          of entry road into the landfill.              Commence obtaining estimates for
                                        Signage       at   Landfill     entrance        the 2018/19 capital works program.
                                          completed.
                                        Waste contractor’s car parking area
                                          completed.
                                        Upgraded Hardstand at Cooroy
                                          Transfer Station completed.
                                        2016/17 Capital Works completed.

                                                                                                                                                        Page 112 of 146
Log in to download the original file

2017-08-08 Services & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.