2017-08-08 Services & Organisation Committee Agenda
The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Management of Ringtail Quarry including Supply of approx. 5,000 cubic Procurement of contractors for Renew Ringtail Quarry Site Based
associated Stockpile & materials meters of crushed rock for Black crushing blasted rock Management Plan.
Recycling Operations Mountain Rd. roadworks Attend to improvement to sediment Conduct an external business review
Manufacture of 2,000 cubic meters control as a result of an of Ringtail Quarry operations
of maintenance gravel for rural environmental audit Address increased training
roads, incorporating 25% recycled Supply of products for Kinmond Ck requirements for SSE & Supervisor
asphalt Rod culvert renewal & roadworks required under new quarry
Burn off conducted of unuseable legislation
green waste in conjunction with
Tinbeerwah Rural Fire Brigade
which used this burn off as a
training exercise
Staff attendance at Annual
Quarrying Safety and Health
Seminar
Mulching of vegetation debris from
TC Debbie.
Business as Usual activities Completion of 2016/17 Resurfacing Recruitment of new Tree Inspection Tenders for delivery of council’s road
Program Officer surfacing works to enable
Complete Capital work program Establishing new contracts for Public commencement of the 2017/18
including, Black Mountain Road slip Open Space & Amenities Cleaning resurfacing program
repair, Cooroy – Noosa Road stage Replanting landscaped areas Review Tree Policy & process
4, Lake Weyba Drive culverts review
Repairs to playgrounds damaged
during the ex TC Debbie weather
event
Eenie Ck Road improvement
including resurfacing, mulching &
landscaping reestablishment at
Girraween roundabout.
Infrastructure Planning & Design
Development of the Noosa Transport Completion and adoption of the Recruitment of Transport Strategy Development of Project
Strategy in conjunction with Strategic Noosa Transport Strategy in Project Manager. Management for Transport Strategy.
Planning conjunction with Strategic Planning.
Implement recommendations of the Implementation of Traffic Study Resumption negotiation for property Resumption negotiation for property
Traffic Study and monitor outcomes with recommendations ongoing. truncation to allow roundabout truncation to allow roundabout
audits with aim to improve safety Completion of design of Moorindil St construction at Ernest St and Hilton construction at Ernest St and Hilton
standards and Poinciana Avenue intersection Tce intersection. Tce intersection continues.
improvements.
Page 139 of 146
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.