Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2017-08-08 Services & Organisation Committee Agenda

of 146

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

BRANCH ACTIVITIES                         RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           THE NEXT QUARTER
Management of Ringtail Quarry including       Supply of approx. 5,000 cubic             Procurement of contractors for             Renew Ringtail Quarry Site Based
associated   Stockpile  &     materials         meters of crushed rock for Black            crushing blasted rock                        Management Plan.
Recycling Operations                            Mountain Rd. roadworks                    Attend to improvement to sediment          Conduct an external business review
                                            Manufacture of 2,000 cubic meters             control as a result of an                    of Ringtail Quarry operations
                                                of maintenance gravel for rural             environmental audit                        Address       increased       training
                                                roads, incorporating 25% recycled         Supply of products for Kinmond Ck            requirements for SSE & Supervisor
                                                asphalt                                     Rod culvert renewal & roadworks              required     under    new       quarry
                                            Burn off conducted of unuseable                                                            legislation
                                                green waste in conjunction with
                                                Tinbeerwah Rural Fire Brigade
                                                which used this burn off as a
                                                training exercise
                                            Staff      attendance      at  Annual
                                                Quarrying Safety and Health
                                                Seminar
                                            Mulching of vegetation debris from
                                                TC Debbie.
Business as Usual activities               Completion of 2016/17 Resurfacing            Recruitment of new Tree Inspection         Tenders for delivery of council’s road
                                               Program                                      Officer                                      surfacing     works      to    enable
                                           Complete Capital work program                Establishing new contracts for Public        commencement of the 2017/18
                                               including, Black Mountain Road slip          Open Space & Amenities Cleaning              resurfacing program
                                               repair, Cooroy – Noosa Road stage          Replanting landscaped areas                Review Tree Policy & process
                                               4, Lake Weyba Drive culverts                                                              review
                                           Repairs to playgrounds damaged
                                              during the ex TC Debbie weather
                                              event
                                           Eenie       Ck    Road     improvement
                                              including resurfacing, mulching &
                                              landscaping      reestablishment   at
                                              Girraween roundabout.
Infrastructure Planning & Design
Development of the Noosa Transport           Completion and adoption of the             Recruitment of Transport Strategy          Development       of        Project
Strategy in conjunction with Strategic         Noosa     Transport    Strategy    in        Project Manager.                             Management for Transport Strategy.
Planning                                       conjunction with Strategic Planning.
Implement recommendations of the             Implementation of Traffic Study            Resumption negotiation for property        Resumption negotiation for property
Traffic Study and monitor outcomes with        recommendations ongoing.                     truncation to allow roundabout               truncation to allow roundabout
audits with aim to improve safety            Completion of design of Moorindil St         construction at Ernest St and Hilton         construction at Ernest St and Hilton
standards                                      and Poinciana Avenue intersection            Tce intersection.                            Tce intersection continues.
                                               improvements.

                                                                                                                                                           Page 139 of 146
Log in to download the original file

2017-08-08 Services & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.