                           AGENDA


   Planning & Environment
     Committee Meeting


                   Tuesday, 9 April 2019


                     commencing at 9.30am
            Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Brian Stockwell (Chair), Jess Glasgow, Ingrid Jackson, Tony Wellington




                       “Noosa Shire – different by nature”
Log in to download the original file

2019-04-09 Planning & Environment Committee Agenda(PDF, 6MB).pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 89 sections

Section 2

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                 9 APRIL 2019


TABLE OF CONTENTS

ITEM                                                                     PAGE

ATTENDANCE & APOLOGIES                                                      -

PRESENTATIONS                                                               -

REPORTS FOR CONSIDERATION OF THE COMMITTEE                                  3

1      MCU19/0016 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF
       USE, DETACHED HOUSE SEAWARD OF THE COASTAL BUILDING LINE,
       LOCATED AT 54 SEAVIEW TERRACE, SUNSHINE BEACH                        3

2      MCU19/0007 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF
       USE (ENTERTAINMENT AND DINING BUSINESS TYPE 2 RECREATION,
       AMUSEMENT AND FITNESS (FITNESS CENTRE), SITUATED AT 26 PROJECT
       AVENUE, NOOSAVILLE                                                  21

3      MCU16/0079.03 - REQUEST TO CHANGE A DEVELOPMENT APPROVAL FOR 5
       MEMORIAL DRIVE, TEWANTIN                                            35

4      OPW19/0046 - DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS
       (ADVERTISING DEVICE) SITUATED AT 1/100 RENE STREET, NOOSAVILLE      45

5      PLANNING & ENVIRONMENT COURT APPEAL NO. 245 OF 2019 (M DESIGN &
       FOURTEEN ENTERPRISES) - REFUSAL OF A MINOR CHANGE TO A
       DEVELOPMENT APPROVAL FOR ADDITION OF A SWIMMING POOL AND
       DECK AT 42 SEAVIEW TERRACE, SUNSHINE BEACH                          55

CLOSED SESSION                                                       58

6      ENVIRONMENT LEVY
       POTENTIAL LAND ACQUISITION - LOT 3 RP186809                         58

CLOSED SESSION                                                        -




                                                                 Page 2 of 90

Section 3

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                      9 APRIL 2019



REPORTS FOR CONSIDERATION OF THE COMMITTEE
1                        MCU19/0016 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE,
                         DETACHED HOUSE SEAWARD OF THE COASTAL BUILDING LINE, LOCATED AT 54
                         SEAVIEW TERRACE, SUNSHINE BEACH
DOCUMENT INFORM AT ION




Author                           Development Planner, Lisa Pienaar
                                 Environment and Sustainable Development Department

Index                            ECM/ Application/ MCU19/0016

Attachments                      1.   Architectural Plans
                                 2.   Landscaping Plan
                                 (Note: Both attachments provided separately to this report)



         APPLICATION DETAILS

         Applicant                              Brett McKenzie Mason

         Proposal                               Material Change of Use - Detached House in Coastal Protection Area
                                                (Seaward of Coastal Building Line)

         Properly Made Date                     11 February 2019

         Information Request Date               Not applicable

         Information Response Date              Not applicable

         Decision Due Date                      18 April 2019

         Number of Submissions                  Not applicable



         PROPERTY DETAILS

         Property Address                       54 Seaview Terrace, Sunshine Beach Qld 4567

         RP Description                         Lot 63 RP 81810

         Land Area                              589 m²

         Existing Use of Land                   Dwelling



         STATUTORY DETAILS

         SEQRP Designation                      Urban Footprint

         Locality                               Eastern Beaches

         Zone                                   Detached Housing

         Overlays                               Natural Resource Overlay – Coastal Protection Area
                                                Natural Hazard Overlay – Slide Hazard

         Assessment Type                        Code



                                                                                                      Page 3 of 90

Section 4

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   9 APRIL 2019


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 9 April 2019 regarding Application No. MCU19/0016 for a
Development Application for Material Change of Use for a Detached House seaward of the
coastal building line, situated at 54 Seaview Terrace, Sunshine Beach and:
A.   Refuse Application No. MCU19/0016 for the following reasons:
     1.    The proposal is in conflict with the assessment benchmarks of the State Planning
           Policy as it proposes development in an Erosion Prone Area and Natural Hazard
           Area.
     2.    The proposal is contrary to the provisions of the Planning Scheme in that it proposes
           development:
           a.    in the Landslide Hazard Area thereby placing people and property at risk and
                 does not maintain the natural processes and protection function of land forms
                 and vegetation contrary to the provisions of the Natural Hazards Overlay Code.
           b.    in the Coastal Protection Area extending seaward of the Coastal Building Line
                 and is likely to adversely impact upon natural coastal processes contrary to the
                 requirements of the Natural Resources Code.
           c.    which does not protect the dunal area and natural environmental nor maintain
                 the safety of people and works contrary to the Overall Outcomes for the
                 Eastern Beaches Locality.
     3.    Recent modelling carried out by the Council indicates significant erosion is likely to
           occur in the future which may threaten life and property should the proposed
           development proceed.
     4.    Given the site is affected by the Coastal Building Line and is located in a highly
           vulnerable erosion prone area, the proposed 6m setback is not sufficient to minimise
           the risk of erosion.
B.     Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1.   PROPOSAL
The applicant proposes to remove the existing dwelling and construct a new 2 storey dwelling
within the Coastal Protection Area identified under the Natural Resources Overlay. The dwelling
is proposed to be located seaward of the Coastal Building Line. The Coastal Building Line is
generally 15m from the seaward boundary. The background of the Coastal Building Line is
provided in section 2.1 of this report. Refer Figure 1– Proposed Site plan for new dwelling &
Figure 2 – Elevations for proposed dwelling.




                                                                                   Page 4 of 90

Section 5

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         9 APRIL 2019




         Figure 1 – Proposed Site plan for new dwelling (Coastal Building Line in yellow)




                                                                                            Page 5 of 90

Section 6

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 9 APRIL 2019




                            Figure 2 – Elevations for proposed dwelling




2.   SITE DETAILS
2.1. Background
The existing dwelling situated on the subject site was constructed in 1973, when building
approval was granted. An addition to the dwelling received building approval in 1995. There is
no planning approval documented for this property. The dwelling straddles the Coastal Building
Line which was officially declared on 22 December 1984 under the Coastal Management Control
District Regulations 1984. Refer Figure 3 – Subject site and Coastal Building Line.




                                                                                 Page 6 of 90

Section 7

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          9 APRIL 2019




                           Figure 3 – Subject site and Coastal Building Line

As shown in Figure 3 – Subject site, the majority of development on the eastern side of
Seaview Terrace has some form of building work seaward of the Coastal Building Line. As
reference for Section 3 of this report, it is important to provide background to other development
affected by the Coastal Building Line on the seaward side of Seaview Terrace. This is provided in
Table 1 below.
Table 1 – Background of development on lots affected by the Coastal Building Line on the
seaward side of Seaview Terrace (NB – Table as referenced in report for application no.
51987.2951.01- extra content added for this report)
Address in   Development             Date of Decision       Comments
Seaview      Approval
Terrace
The blue rows represent development assessed under the State Coastal Management Plan* provisions.
38           2005132004.240114       11 July 2005           No development seaward of the Coastal
                                                            Building Line.

40           51993.271               1993                   DA File misplaced. Building plans indicate
                                                            development approximately 3m to 4m
                                                            seaward of the Coastal Building Line.
42           TPC 1918                7 July 1987            Dwelling originally approved – part of
                                                            building cantilevered into Coastal building
                                                            line setback.

             Change to TPC to add    19 September 2018      Change to add deck and pool refused by
             pool and deck                                  Council. Currently in appeal stage.


                                                                                          Page 7 of 90

Section 8

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 APRIL 2019


Address in   Development               Date of Decision   Comments
Seaview      Approval
Terrace
44           No DA records       for                      Original dwelling appeared (from aerials)
             original dwelling                            to comply with the Coastal Building Line
                                                          setback.
             MCU12/0159                9 January 2013     A portion of the building, a deck and pool
                                                          (pool setback 4m – 5.7m from rear
                                                          boundary) approved seaward of the
                                                          Coastal Building Line. Third party referral
                                                          to DEHP. Alignment of neighbouring
                                                          property    was    considered     in   the
                                                          assessment.
             MCU15/0023                5 June 2015        A greater setback to the pool (4.9m to
                                                          6.5m from rear boundary) and a reduction
                                                          of building forward of the Coastal Building
                                                          Line when compared to the previous
                                                          approval.
46 - 48      132005.2200               27 February 2007   The application was subject to the State
                                                          Coastal Management Plan*. For context
                                                          an extract from the planners report is
                                                          provided below—
                                                          The State Coastal Management Plan
                                                          contains specific provisions relating to
                                                          erosion prone areas when undertaking
                                                          development assessment. The State
                                                          Coastal Management Plan, Policy 2.2.2
                                                          applies to Erosion Prone Areas. For
                                                          existing developed areas in the erosion
                                                          prone area, the limit for new buildings is
                                                          the building alignment of neighbouring
                                                          properties. Further development is only to
                                                          occur landward of this alignment.
                                                          The proposed dwelling house is primarily
                                                          located landward behind the 15 metre
                                                          building setback line from the rear
                                                          boundary. Although small sections of the
                                                          house and the proposed pool extend
                                                          within this setback, the development does
                                                          not occur seaward of the neighbouring
                                                          dwelling to the north or the existing deck
                                                          on the site which is to be retained.
50           132004.4743               2005               The proposal is seaward of the Coastal
                                                          Building Line and was subject to the State
                                                          Coastal Management Plan, Policy 2.2.2.
                                                          The assessment is similar to the
                                                          neighbouring 46-48 Seaview Terrace.
50           MCU15/0096                13 May 2016        New dwelling (demolishing previous
                                                          dwelling). A portion of the building,
                                                          setback 5-8.25m back from rear
                                                          boundary. Approved seaward of the
                                                          Coastal Building Line. Alignment of
                                                          neighbouring property was considered in
             MCU15/0096.03             20 March 2017      the assessment.
                                                          Approval for roof form – no further
                                                          encroachment to rear boundary.


                                                                                        Page 8 of 90

Section 9

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         9 APRIL 2019


Address in   Development              Date of Decision      Comments
Seaview      Approval
Terrace
52           131998.982104            14 December 1998      Extension to existing dwelling seaward of
             15246 DA                                       the Coastal Building Line. Referral to the
                                                            Beach Protection Authority. Consideration
                                                            of neighbouring properties alignment.
             131998.982104.1          6 January 2016
                                                            Roof over second storey deck seaward of
                                                            the Coastal Building Line. Not protruding
                                                            further seaward than existing deck.
54           No DA on file            Building   approval   Dwelling is constructed eastward of the
                                      1973                  Coastal building line. Dwelling approved
                                                            and constructed prior to the introduction
                                                            of the Coastal Building Line. Subject site
                                                            – background provided above.
56           132005.901               29 November 2005      The proposal is seaward of the Coastal
                                                            Building Line and was subject to the State
                                                            Coastal Management Plan*, Policy 2.2.2.
                                                            The assessment was similar numbers 46-
                                                            48 & 50 Seaview Terrace.

             MCU13/0247               20 January 2014       New dwelling (demolishing previous
                                                            dwelling). A portion of the building,
                                                            setback 6.7-8.4m back from rear
                                                            boundary. Approved seaward of the
                                                            Coastal Building Line. Alignment of
                                                            neighbouring property was considered in
                                                            the assessment.
56           MCU13/0247.02            14 February 2017      Changes include relocation of pool to
                                                            upper level, extension of deck seaward
                                                            and    roof   terrace.   Alignment   of
                                                            neighbouring property was considered in
                                                            the assessment in terms of average
                                                            setback.
58           51996.2025      (04632   23 August 1996        A cantilevered deck seaward of the
             TP)                                            Coastal Building Line resulting in a 6m
                                                            setback to the seaward boundary.
                                                            Referral to the Beach protection
                                                            Authority.
60           131999.982760            12 July 1999          Dwelling seaward of the Coastal Building
                                                            Line. Extensions to an existing house
                                                            built prior to the 1980’s.
62           132004.4920              26 November 2004      Dwelling seaward of the Coastal Building
                                                            Line. The proposal was subject to the
                                                            State Coastal Management Plan*, Policy
                                                            2.2.2. The assessment was similar to
                                                            numbers 46-48, 50, & 56 Seaview
                                                            Terrace.
64           No DA except for an                            The existing dwelling appears to extend
             extension to     the                           approximately between 2m to 3m
             carport                                        seaward of the Coastal Building Line.
*The State Coastal Management Plan commenced in February 2002 and ended in February 2012 and
was replaced by State Planning Policy 3/11: Coastal Protection (2 Dec 2013). Since 2013 various State
Planning Policies have lapsed or been repealed.


                                                                                          Page 9 of 90

Section 10

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       9 APRIL 2019


State Mapping
The site is also within an Erosion Prone Area and Coastal Management District as shown in
SARA’s mapping below in Figure 4 - Coastal Management District and Erosion Prone Area.




                      Figure 4 – Coastal Management District and Erosion Prone Area

As background for this report, the QLD Government Guideline: State Development Assessment
Provisions State Code 8: Coastal development and tidal works provides information on the intent
of the Coastal Building Line and the concept of coastal processes and this is provided below for
Council’s reference.
Coastal Building Line
Coastal building lines are declared in those areas that are already developed for urban purposes
and are highly vulnerable to coastal erosion. The intent of the coastal building line is to:
 provide a common alignment for building work;
 set back development from the coastline which reduces the erosion risk to people and
     property;
 provide space on the lot seaward of the development for construction of future erosion control
     structures wholly on the lot and not on State land.
Generally, no building work, including houses, sheds or swimming pools, would be permitted
seaward of a coastal building line. Only works for the protection of existing buildings from sea
erosion, such as seawalls, would be permitted seaward of a coastal building line.
Coastal Processes
Coastal processes are the natural processes occurring on the coast and in tidal water including:
   wind, waves, tides and currents which transfer energy to the coast and drive other
     processes;
   sediment transport to and along the coast;
     sediment accumulation or erosion onshore and offshore which builds or destroys landforms
       including foreshores, beaches, dunes, delta plains;
     the growth and spread of plants and succession of plant communities, especially where
       plants have a specific role in trapping sediment and building landforms (mangrove and
       dune colonizing grasses) and stabilizing sediments against erosion;
     changes in sea-level both temporary and permanent from weather events and climate
       change.

                                                                                      Page 10 of 90

Section 11

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   9 APRIL 2019


Localised Modelling – Noosa Council
The lot is also affected by Council’s new Coastal Hazards – Erosion Prone Area mapping. The
modelling was undertaken in accordance with the Queensland Government Coastal Hazard
Technical Guide. Modelling for Erosion Prone Area 1% AEP storm event consists of three future
planning horizons– the years 2040, 2070 and 2100, as well as present day conditions, for a
comparison. The modelling outputs were completed and signed off in February 2018 by the
relevant representative of the QLD State Government ensuring the modelling was in accordance
with the State guidelines. Figure 5 below shows the subject site and the newly modelled erosion
prone areas.




                            Figure 5 – Erosion Prone Area and subject site

The modelling suggests that by 2040 and 2070, within the life of this development, approximately
between 50% up to 80% of the site is affected by coastal erosion in a 1% AEP storm event.
Discussion with Applicant
The applicant was consulted at the Information request stage of the application process as to
whether they would consider changing their proposal to have all proposed built form to be located
landward of the Coastal Building Line. The applicant declined this option.
Around the same time Council officers met with the applicant, whereby the applicant conveyed
their wish to build within 6 metres from the eastward boundary as per other residents in Seaview
Terrace had. They expressed their disappointment with regard to timing, whereby policy
positions had been strengthened since purchasing their property and submitting the application
for the proposed dwelling.




                                                                                  Page 11 of 90

Section 12

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     9 APRIL 2019


2.2. Site Description
The site has a 15 metre frontage to Seaview Terrace and a 15.4 metre frontage to the Sunshine
Beach coastal reserve and is rectangular in shape. The site is located on a steep escarpment
where at the rear boundary, the land falls away to the beachfront. The site itself has a 7 metre
fall from west to east.
An existing dwelling is located on the site within the Coastal Protection Area identified under the
Natural Resources Overlay. The Coastal Building line traverses the site north to south as shown
in Figure 1.
2.3. Surrounding Land Uses
The site adjoins detached houses to the north and south and to the west across Seaview
Terrace. The site slopes steeply to the east adjoining north Sunshine Beach.
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
The application under the Planning Act 2016 must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
   State Planning Policy;
   South East Queensland Regional Plan;
   Planning Regulation 2017;
   The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The State Planning Policy July 2017 (SPP) outlines particulars about compatible urban form that
minimises impacts on coastal processes and avoids development that present unacceptable risk
from coastal hazards. The Noosa Plan is generally consistent with the SPP. The State Planning
Policy (State interest guideline – Coastal Environment) requires the coastal environment to be
protected and enhanced and urban form to be compatible with this. Particularly this policy
requires that development is avoided in areas that present an unacceptable risk from coastal
hazards; and development avoids or minimises adverse impacts on coastal processes and
coastal resources.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The proposal is for urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments
State Provisions
The proposal seeks to construct a new dwelling seaward of the Coastal Building Line, providing a
6 metre setback to the building and a cantilevered deck 3 metres setback from the seaward
boundary. The Coastal Building Line is generally 15m from the seaward boundary as shown in
Figure 1 in Item 1 of this report.




                                                                                    Page 12 of 90

Section 13

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    9 APRIL 2019


A Development Permit for Building Works is required to be referred to the State Assessment and
Referral Agency (SARA) as a Concurrence Agency. The applicant has referred the application in
its current form prior to lodging this planning application with Council as provided for under the
Planning Act 2016. SARA has no objection to the building works and imposed 3 conditions for
the development. Refer Section 6.1 of this report.
Locality Provisions – Noosa Plan
The subject site is located in the Eastern Beaches Locality and is zoned Detached Housing. The
proposed use is identified as a consistent use within the zone and is required to follow a code
assessable application process.

Criteria                           Planning Scheme              Proposal               Complies

Site cover                         40/40%                       38/40/18%              

Soft landscaping                   20%                          55%                    
Landscaping Setbacks                                                                   

Building height
 storeys                         2 storeys max                2 storeys              
 metres                          8 metres                     7.9 metres             

Boundary setbacks
 Frontage                        6 metres                     6 metres               
 Side                            1.5m/2m/2.5m                 2.5 metres             
 Side                            1.5m/2m/2.5m                 2.5 metres             

 Rear                            15 metres (where coastal 6     metres     & X
                                   building  line)  or   6 cantilevered deck at
                                   otherwise                3 metres

Length of wall                     15 metres max                12 metres              

Land Use & Works Provisions
The application has been assessed against applicable codes. The pertinent issues arising out of
the assessment against the codes are discussed as follows, including:
 Eastern Beaches Locality Code
 Detached House Code
 Natural Resource Overlay Code
 Natural Hazard Overlay Code
Natural Resources Overlay Code – Coastal Protection
The relevant Specific Outcomes of the Natural Resources Overlay Code – Coastal Protection are
provided below:
O18 The siting and design of development and materials used within the Coastal Protection
Area, as identified on the Natural Resources Overlay Maps, do not cause any significant adverse
impacts on the coastal resources of the location nor interrupt the natural cycles of erosion and
accretion of foreshore areas and beaches.




                                                                                   Page 13 of 90

Section 14

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   9 APRIL 2019


O20 Buildings and other structures including swimming pools and retaining walls do not extend
seaward of the coastal building line except—
a)   uncovered and unenclosed cantilevered balconies that do not extend greater than 3m
     seaward of the coastal building line; and
b)   are setback a minimum of 6m from the seaward boundary (refer below).




The proposal does not comply with Specific Outcome O18 as it is considered the development
seaward of the Coastal Building Line has the potential to interrupt the natural cycles of erosion
and accretion of the beach. Furthermore, the proposal does not comply with Specific Outcome 20
as the new development does not comply with the 15m setback of the coastal building line and
the cantilevered walkway/deck is only setback 3 metres from the seaward boundary.
Given the proposal does not comply with the Specific Outcomes, the following Overall Outcomes
for the Natural Resources Overlay Code are applicable:
13.42.2 The overall outcomes sought for the Natural Resources Overlay Code are—
f)   for Coastal Protection Areas, development —
     i     does not adversely impact upon natural coastal processes; and
     ii    is designed and sited to protect the natural beach experience and visual amenity
           enjoyed by residents and others.
It is pertinent that new climate change information and modelling has highlighted that within the
life of this development serious erosion may occur and risk life and property.
Erosion prone areas should be retained in their natural state where they can act as a buffer
between land uses and the beach to allow the natural coastal processes to occur, without the
need for intervention to protect human life and property. It is considered the proposal will
adversely impact on the coastal processes as a 6m landscaped setback is not sufficient to
minimise the risk of erosion.
Consistent with the Noosa Plan, no new buildings, structures, swimming pools and retaining
walls can occur seaward of the coastal building line, except for uncovered and unenclosed
cantilevered balconies that do not extend greater than 3 metres seaward of the Coastal Building
Line and are setback a minimum of 6 metres from the seaward boundary. The proposed
deck/walkway is 3 metres setback from the seaward boundary, with a large portion of the
dwelling seaward of the Coastal Building Line.




                                                                                  Page 14 of 90

Section 15

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   9 APRIL 2019


While some of the dwellings on the seaward side of Seaview Terrace are constructed seaward of
the Coastal Building Line, they complied with the statutory instruments in force at the time or
were found to be consistent with surrounding development. Since that time new information of
climate change effects on coastal processes have been modelled and more accurately depict the
risk of erosion to the subject property as shown in Figure 5 in section 2.1.
Furthermore, it should be noted that State Government planning for coastal areas has changed
over time. For example, between 2002 and 2012 State Planning Policy allowed for development
seaward of the coastal building line providing it did not protrude seaward of the neighbouring
properties building alignment. Whereas, the current State Development Assessment Provisions
are much more restrictive, not permitting development seaward of the coastal building line except
for coastal protection works. This highlights the Queensland State Government statutory planning
instruments that recognise the importance of the risks of climate change and updated information
available.
The application is considered to comply with Probable solution 18.1 which requires a mix of
native landscaping to be provided for a width of 5m from the seaward boundary to provide
buffering to the coastal dunal system.
The applicant submitted a detailed landscape plan that includes landscaping to 55% of the site
and extensive mature and shrub native plantings within the 6 metre rear setback to the proposed
dwelling. Pathways of sand with stone steppers are also proposed in this setback.
Generally
The site is subject to the Natural Hazards Overlay Code - Landslide Hazard area. The applicant
has not provided a geotechnical report relating to proposed development which is required by the
Overlay Code and the Detached House Code. It should be noted that the applicant was not
requested to provide a geotechnical report as it was indicated at that time that the development
would not be supported by officers.
Notwithstanding the above, the proposal largely complies with the Detached House Code. It
appears that the roof form meets the minimum of 5 degrees requirement. The proposed vaulted
roof form does soften the box profile of the dwelling, particularly from the east and west
elevations. Refer Figure 6 – West elevation.




                                     Figure 6 – West elevation


                                                                                  Page 15 of 90

Section 16

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    9 APRIL 2019


4.    RISK & LIABILITY
There will be increasing pressure for property owners to seek protection for their built assets to
combat erosion impacts. Who is responsible and who should cover this cost has some case law,
but is still not clear yet.
Climate change presents considerable uncertainty in terms of severity and frequency of hazard.
Council as assessment manager has a duty of care to give full consideration to coastal erosion
and sea level rise risks. While a planning scheme might provide for a particular type of
development to occur, the assessment manager must consider whether the design and siting of
that development is compatible with the risk and that any coastal risks have been appropriately
mitigated.
Advice from LGAQ and King and Co advise that Council has a duty of care to consider best
available information at the time of assessing the development application.
5.    DRAFT PLANNING SCHEME
The draft zoning under the new Planning Scheme is Low Density Residential. The parameters
under the draft scheme with regard to site cover, height, built form and setbacks has remained
unchanged. The draft Coastal Protection overlay code is further strengthened under the draft
Planning Scheme based on new and current information with regard to coastal hazards. In
summary, the draft Code includes provisions that recognises that development is sensitive to the
foreshores and avoids the need for coastal protection works. Further where buildings on the site
are already located within the coastal hazard area for year 2100 at the commencement of the
scheme, new buildings, structures or retaining walls do not extend seaward of the coastal hazard
area for year 2070. The Code refers to the Coastal Hazard areas mapping as recently released
by Council. Refer Figure 5 – Erosion Prone Area and subject site. The existing dwelling and
the proposed dwelling is located within the predicted erosion prone area for years 2100, 2070 &
2040.
6.    CONSULTATION
6.1. Concurrence Agency for Building Work
The applicant’s building certifier referred the proposal to the State Assessment and Referral
Agency (SARA), under Schedule 9 of the Planning Regulation 2017 for premises located
seaward of the coastal building line, prior to submitting the planning application to Council for
assessment.
On the 6 February 2018, the Department (DSDMIP) issued a Statement of Reasons and
conditions for the development under Version 2.4 of the State Development Assessment
Provisions (SDAP) which commenced 16 November 2018 – State Code 8 Coastal development
and tidal works. The reasons for this decision provided by SARA for the proposal are as follows.
•    To ensure the development is carried out generally in accordance with the plans of
     development submitted with the application.
•    To ensure the development avoids or minimises adverse impacts on coastal resources and
     their values.
•    To ensure any disturbance to acid sulfate soils is managed to prevent impacts to coastal
     environments.




                                                                                   Page 16 of 90

Section 17

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   9 APRIL 2019


The Department has responded with 3 conditions pertaining to the proposal as follows:




It is interesting to note, that Conditions 2 & 3 relate to construction management and not to the
presence of structures seaward of the Coastal Building Line. Condition 1 acknowledges the
development positioning seaward of the Coastal Building Line.
The State assessed the application against the relevant outcomes of the State Code 8 for
development in an erosion prone area as shown below.




                                                                                  Page 17 of 90

Section 18

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     9 APRIL 2019




The State Code 8 seeks that there is no development seaward of the Coastal Building Line
except for coastal protection work.
For guidance as to how to comply with the State Code 8 the guideline indicates the following:
Applications… should demonstrate that the proposed development is located landward of the
coastal building line; or
1.   justify why the proposed development cannot be located landward of the coastal building
     line; and
2.   demonstrate how development seaward of the coastal building line is protected from
     coastal erosion both now and in the future.
The State’s coastal building lines have been in place since 1984, and the line is set 15 metres
back from the seaward boundary in this location. This affects around a third of the property at the
rear.
The proposal is not coastal protection work. The applicant’s proposed 6m setback has relied
upon the alignment of neighbouring properties being built/approved under repealed legislation
and policy.
The lot is highly vulnerable to coastal erosion and it is imperative to provide the maximum buffer
to the sea to minimise the risk of coastal erosion. The 15m Coastal Building Line setback
provides this buffer and ensures the development is more resilient to coastal erosion and sea
level rise as climate change occurs.

                                                                                    Page 18 of 90

Section 19

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     9 APRIL 2019


Notably, State support for building works does not provide the ‘green light’ for development of the
site as the proposal requires assessment against The Noosa Plan and approval required from
Council to proceed. The proposal does not comply with the Noosa Plan and it cannot be
conditioned to comply with the Planning scheme, as a substantial part of the dwelling is located
within the 15 metre setback and significant alterations would be required to comply.
6.2. Other Referrals
The application was forwarded for comment to:
   Project Co-ordinator, Climate Change Adaptation, Strategic Planning
   Principal Strategic Planner, Strategic Planning
Advice from Strategic Planning is as follows:
Climate change presents considerable increased risk in terms of the severity and frequency of
coastal erosion. Council has a duty of care and statutory obligation to give full consideration to
current and future projected coastal erosion and sea level rise. The coastal building line is an
important regulatory tool for limiting development within coastal hazard areas. While application
of this has not always been consistent over the last few decades, new knowledge about coastal
erosion risks along the Eastern Beaches highlights the need to take a strong position on ensuring
that new development does not encroach seaward of the coastal building line. This is irrespective
of what development is already existing on properties or their neighbouring properties.
Ensuring development does not encroach seaward of the coastal building line preserves
important dune buffer areas that will be increasingly important into the future for stabilising and
slowing dune erosion. It is critical that council has a consistent approach to the way it applies
coastal building lines to help mitigate future risks.
Council’s new coastal hazard mapping for years 2040, 2070 and 2100 show the increased risk to
coastal erosion overtime. At 2040 around half of the subject property is potentially at risk, by
2070 around three-quarters is at risk.
The State’s coastal building lines have been in place since the mid 1980s, and the line is set 15
metres back from the seaward boundary in this location. This affects around a third of the
property at the rear.
Consistent with the Noosa Plan, no new buildings, structures, swimming pools and retaining
walls can occur seaward of the coastal building line, except for uncovered and unenclosed
cantilevered balconies that do not extend greater than 3 metres seaward of the Coastal Building
Line.
6.3. Public Notification
Not applicable. The application is code assessable.
7.   CONCLUSION & REASONS FOR DECISION
The 15m Coastal Building Line setback allows for the natural landscape to be the first line of
storm protection and buffering. Providing the maximum buffer from the sea will ensure that future
development is more resilient to coastal erosion and sea level rise as climate change effects
arise. Furthermore, the 15m setback preserves the integrity and structure of the frontal dune for
longer in the face of increased storm frequency, intensity and erosion without the need for
coastal protection works.
The proposed 6m setback does not provide sufficient natural landscape buffering in this highly
vulnerable erosion prone area. The 6m setback does not minimise the risk to erosion and allows
for potential impacts on and interference with coastal processes.




                                                                                    Page 19 of 90

Section 20

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          9 APRIL 2019


The subject property and surrounding properties are within a Coastal Management District, an
Erosion Prone Area and affected by the Coastal Building Line. Repealed policy and past
assessment has resulted in development forward of the Coastal Building Line. However, new
knowledge about coastal erosion including new erosion prone area modelling in accordance with
State guidelines, highlights the need to take a strong position in ensuring that development does
not encroach seaward of the Coastal Building Line to minimise risk to hazards.
The development is not in accordance with the relevant statutory planning instruments including
The Noosa Plan’s Natural Resources Overlay Code for Coastal Protection. The proposal raises
significant planning concerns and is recommended for refusal for the following reasons:
1.     The proposal is in conflict with the assessment benchmarks of the State Planning Policy as
       it proposes development in an Erosion Prone Area and Natural Hazard Area.
2.     The proposal is contrary to the provisions of the Planning Scheme in that it proposes
       development:
       a.     in the Landslide Hazard Area thereby placing people and property at risk and does
              not maintain the natural processes and protection function of land forms and
              vegetation contrary to the provisions of the Natural Hazards Overlay Code.
       b.     in the Coastal Protection Area extending seaward of the Coastal Building Line and is
              likely to adversely impact upon natural coastal processes contrary to the
              requirements of the Natural Resources Code.
       c.     which does not protect the dunal area and natural environmental nor maintain the
              safety of people and works contrary to the Overall Outcomes for the Eastern Beaches
              Locality.
3.     Recent modelling carried out by the Council indicates significant erosion is likely to occur in
       the future which may threaten life and property should the proposed development proceed.
4.     Given the site is affected by the Coastal Building Line and is located in a highly vulnerable
       erosion prone area, the proposed 6m setback is not sufficient to minimise the risk of
       erosion.


Departments/Sections Consulted:
   Chief Executive Officer        Community Services                        Corporate Services
     Executive Officer            Community Development                     Financial Services
     Executive Support            Community Facilities                      ICT
                                  Libraries & Galleries                     Procurement & Fleet
                                  Local Laws                                Property
                                  Waste & Environmental Health              Revenue Services

     Executive Services       x   Environment & Sustainable Development     Infrastructure Services
     Community Engagement         Building & Plumbing Services              Asset Management
     Customer Service         x   Development Assessment                    Buildings and Facilities
     Governance                   Economic Development                      Civil Operations
     People and Culture           Environmental Services                    Disaster Management
                                  Strategic Land Use Planning               Infrastructure Planning,
                              x
                                                                            Design and Delivery




                                                                                         Page 20 of 90

Section 21

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                   9 APRIL 2019


2                        MCU19/0007 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
                         (ENTERTAINMENT AND DINING BUSINESS TYPE 2 RECREATION, AMUSEMENT
                         AND FITNESS (FITNESS CENTRE), SITUATED AT 26 PROJECT AVENUE,
                         NOOSAVILLE
DOCUMENT INFORM AT ION




Author                           Development Planner, Lisa Pienaar
                                 Environment and Sustainable Development Department

Index                            ECM/ Application / MCU19/0007

Attachment                       1.   Proposal Plans


         APPLICATION DETAILS

         Applicant                           The Mcfarlan Group Pty Ltd

         Proposal                            Material Change of Use - Entertainment & Dining Type 2 Recreation
                                             amusement fitness (Fitness Centre)

         Properly Made Date                  16 January 2019
         Information Request Date            5 February 2019

         Information Response Date           11 February 2019

         Decision Due Date                   2 May 2019
         Number of Submissions               Nil



         PROPERTY DETAILS

         Property Address                    26 Project Avenue, Noosaville

         RP Description                      Lot 200 RP 913612

         Land Area                           1013m²

         Existing Use of Land                Industrial shed



         STATUTORY DETAILS

         SEQRP Designation                   Urban Footprint

         Locality                            Noosaville

         Zone                                Industry

         Overlays                            Natural Hazard Overlay – Acid Sulfate Soils
         Assessment Type                     Impact




                                                                                                  Page 21 of 90

Section 22

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  9 APRIL 2019


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 9 April 2019 regarding Application No. MCU19/0007 for a
Development Permit for Material Change of Use - Entertainment & Dining Type 2 Recreation
amusement fitness (Fitness Centre) situated at 26 Project Avenue, Noosaville and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
     When Conditions must be Complied With
     1.   Unless otherwise stated, all conditions of this Decision Notice must be complied with
          prior to the use commencing, and then compliance maintained at all times while the
          use continues.
     Approved Plans
     2.   Development authorised by this approval must be undertaken generally in
          accordance with the Approved Plans listed within this Decision Notice.
          Plan No.         Plan Name                                               Date
          D-11801-01A      Proposal Plan (site plan), drawn by Lynda McDougall     10/12/2018
          D-11801-02A      Ground Floor Plan, drawn by Lynda McDougall             10/12/2018
          D-11801-03A      East and West Elevations and mezzanine plan, drawn 10/12/2018
                           by Lynda McDougall
          D-11801-03A      South and North Elevations, drawn by Lynda 10/12/2018
                           McDougall
     Nature and Extent of Approved Use
     3.   Approval is for a Fitness Centre totalling a maximum floor area of 377m2 including the
          amenity building.
     Operating Hours and Class Times
     4.   The hours of operation and staff and patron numbers for the development must
          comply with the following requirements:
          a.    The hours of operation for the approved use is limited to the hours between
                5.00am and 9.00pm daily;
          b.    The number of people (patrons and staff) must not exceed 15 people at any
                one time.
          c.    Group classes must have a minimum 15 minute break between the conclusion
                of a class and the beginning of the next.
     Noise
     5.   Noise nuisance beyond the boundary of the site shall not exceed the levels specified
          in Table 1.
     Table 1
           NOISE LEVELS AT COMMERCIAL PLACE
           PERIOD       Noise level at a commercial place measured as the
                        adjusted maximum sound pressure level (Lamax, adj,T)
           5am – 6pm    Background noise level plus 10 dB(A)
           6pm – 10pm   Background noise level plus10 dB(A)
           10pm – 7am   Background noise level plus 8 dB(A)


                                                                                 Page 22 of 90

Section 23

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  9 APRIL 2019


    Amenity
    6.    The development must be undertaken and operated in a manner that causes no
          detrimental effect upon the amenity of the area by reason of the creation of excessive
          noise, lighting nuisance or other emissions.
    Advertising Signage
    7.    Any advertising sign or device must comply with Council's policies on advertising
          devices.
    Bicycle spaces and amenities
    8.    Facilities for 4 bicycle spaces must be provided for the approved use and be made
          available at all times to patrons and staff at the commencement of the use. Indicate
          their locations with an Operational Works application.
    9.    Shower and toilet facilities must be in accordance with the approved plans and
          available at the commencement of the use.
    Landscaping Works
    10.   The development site must be landscaped. The works must be undertaken in
          accordance with an Operational Works approval and the Noosa Plan for that specific
          area and must include in particular:
          a.   The extent of works shown on the approved Site Plan (D-11801-01A);
          b.   An average of a 2 metre wide landscaping strip is to be provided along the
               Project Avenue road frontage of the subject site, exclusive of the access
               driveway and generally uncompromised by infrastructure items;
          c.   All landscape works must be established and maintained in accordance with
               the approved design for the life of the development, and in a manner that
               ensures healthy, sustained and vigorous plant growth. All plant material must
               be allowed to grow to full form and be refurbished when its life expectancy is
               reached;
          d.   All landscape works must be maintained generally in accordance with the
               approved design for the life of the development.
    Site Access and Driveways
    11.   A sealed access driveway must be provided from Project Avenue to all parking and
          manoeuvring areas of the development. The works must be undertaken in
          accordance with an Operational Works approval and must include in particular a
          driveway crossover in accordance with Council’s Standard Drawing RS-051 and any
          associated addendums.
    Car Parking
    12.   A minimum of 13 car parking spaces must be provided and marked on the site and
          made available and accessible at all times while the use is open for business. The
          works must be undertaken in accordance with an Operational Works approval and
          must include in particular:
          a.   11 visitor parking spaces (including scooter) within the total, which are clearly
               marked for that purpose and accessible at all times for visitor use;
          b.   Car spaces 10 & 11 dedicated as staff parking spaces, which are clearly
               marked for that purpose;
          c.   Dimensions, crossfalls and gradients in accordance with Australian Standard
               AS/NZS2890.1:2004 for the relevant user class.



                                                                                 Page 23 of 90

Section 24

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    9 APRIL 2019


    13.   All car parking areas and access driveways must be maintained exclusively for
          vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
    14.   Directional signage must be provided to direct visitors and customers to the car
          parking spaces provided on site.
    Stormwater Drainage
    15.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval and must include in particular:
          a.    Collection of runoff from the building and hardstand areas;
          b.    Discharge to Council’s drainage system in Project Avenue and/or to a suitable
                easement.
    Electricity and Telecommunication Services
    16.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    17.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and
          all applicable legislation at the time of construction.
    Easements
    18.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    19.   All easements must be designed in accordance with the planning scheme and
          granted at no cost to the Grantee. Where the Grantee is Council or a service
          authority, the easement documentation must be in accordance with the Grantee’s
          standard easement terms. Draft easement documentation must be submitted to
          Council for endorsement.
    20.   All works must be kept clear of any existing or proposed easements on the subject
          land, unless agreed otherwise in writing by the Grantee.
    Earthworks and Retaining Walls
    21.   All fill and associated retaining walls/batters must be contained entirely within the
          subject site unless written permission from the respective landowner(s) is provided to
          Council. All earthworks must be undertaken in accordance with the provisions of
          Australian Standard AS3798: Guidelines on Earthworks for Commercial and
          Residential Developments.
    Damage to Services and Assets
    22.   Any damage caused to existing services and assets as a result of the development
          works must be repaired at no cost to the asset owner at the following times:
          a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                immediately; or
          b.    where otherwise, upon completion of the works associated with the
                development.
          Any repair work which proposes to alter the alignment or level of existing services
          and assets must first be referred to the relevant service authority for approval.



                                                                                   Page 24 of 90

Section 25

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      9 APRIL 2019


     Performance Bond
     23.   Security in the form of a cash bond or trading bank guarantee to the sum of $5,000
           must be submitted to Council, to secure performance of all conditions of this
           approval, prior to the issue of a Development Permit for Operational Works. The cash
           bond or trading bank guarantee will be returned on performance of the conditions of
           approval less any costs incurred by Council in respect of enforcing performance of
           this permit. Council reserves the right to call upon the bond or guaranteed sum to
           effect compliance with conditions.
B.   Find the following are sufficient grounds to justify the decision despite the conflict with the
     Planning Scheme:
     1.    Some sport and recreational uses are accepted in the Industry Zone given the
           potential impacts of sport and recreation uses; and
     2..   The fitness centre relies on a large floor area that can be facilitated in an Industry
           zone, unlike other zones where it would be difficult to locate.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1.   PROPOSAL
The applicant proposes to utilise an existing industrial shed and extend the shed in the future to
accommodate a fitness centre/cross fit training facility. The existing floor space is 271m 2
(including a mezzanine level) and the extension to the east is proposed to be 84m 2. An amenities
block with toilet and showers is to be located in a separate building from the existing building.
The total proposed gross floor area of 377m2.
The development proposes to include 13 car spaces, including 2 staff spaces and a disabled
space and 4 scooter spaces. The original proposal was for 20 patrons and 3 staff. This has since
been amended to allow for a maximum number of people (including staff) on site at any one time
as long as it complies with car parking. To comply with the car parking requirement a total of 15
people are proposed to occupy the site at any one time. The fitness centre proposes to operate
5am-9pm, 7 days a week.
Refer to Figure 1 – Proposed gym.




                                                                                    Page 25 of 90

Section 26

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA     9 APRIL 2019




                          Figure 1 – Proposed gym

                                                    Page 26 of 90

Section 27

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         9 APRIL 2019


2.    SITE DETAILS
2.1. Background
The site was previously used by Sunrise Engineering and Welding. Part of the site was also
utilised by the adjoining bus depot for access and parking. Refer to Figure 2 – Existing shed.




                                        Figure 2 – Existing Shed
2.2. Site Description
The site has a 21 metre frontage to Project Avenue, with access to the site at the south western
corner of the site. The site is relatively flat and existing on-site parking is informal, with no line
marking. Refer Figure 3 – Subject site.




                                         Figure 3 – Subject site

                                                                                        Page 27 of 90

Section 28

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      9 APRIL 2019


2.3. Surrounding Land Uses
The site is located in an existing industrial area, which is largely developed with the exception of
some vacant sites located north and west of the site. A motor mechanic business adjoins the site
to the north, a mixed industrial tenancy adjoins to the south and the east. Industrial factory
tenancies are located opposite the site on the other side of Project Avenue.
3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
    State Planning Policy;
    South East Queensland Regional Plan;
    Planning Regulation 2017;
    The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The following assessment benchmark from the Planning Regulation 2017 applies to the
application:
    SEQ Development Area
The proposal is for urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of the Noosa Plan to the extent the
provisions are relevant to the development.
Locality Provisions
The subject site is located in the Noosaville Locality and is zoned Industry. The proposed fitness
centre is identified as an inconsistent use in the industry zone and is required to follow an impact
assessment process.

 Criteria                          Planning Scheme              Proposal                 Complies
 Gross floor area                  Not applicable               377 m²                   
 Site cover                        Not applicable               37%                      
 Landscaped open space             15 m² min                    152 m² (15%)             
 Carparking                        18.85 based on use area 13 equivalent spaces, X
                                   6 based on patron including 12 spaces
                                   numbers, whichever is and 4 scooter spaces
                                   the greater



                                                                                     Page 28 of 90

Section 29

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     9 APRIL 2019


 Criteria                          Planning Scheme             Proposal                 Complies
 Bicycle Spaces            3.7 bicycle spaces                  Showers and toilets 
 End of Trip Facilities*   1 locker per 2 bicycle              provided.    Condition
                                                               requiring      bicycle
 *(required only where 5 + spaces and;
                                                               spaces is proposed.
 spaces are required)      1 shower cubicle with
                           ancillary change room
                           per 10 bicycle spaces


Land Use & Works Provisions
The application has been assessed against applicable codes as follows:
   Noosaville Locality Code
   Business Uses Code
   Engineering Works Codes
   Landscaping Code
The pertinent issues arising out of the assessment against the codes are discussed below.
Overall Outcome vv) ii of the Noosaville Locality Code seeks to protect the Noosaville industrial
estate for industrial functions to the exclusion of incompatible uses, including residential,
community and commercial uses, and some sport and recreation uses. Since the
commencement of the Noosa Plan in 2006, gyms, ballet schools and the like have been
approved in the Noosaville industrial area, given these uses are generally floor area consumptive
and as such difficult to locate in the business centres. The size and scale of the building floor
area for this proposal is larger than other gym uses previously approved in Industrial Zones
within Noosaville, including the 158m2 fitness studio/martial arts centre at 63 Rene Street, and
Crossfit Noosa at 9/5 Commerce Court which is 140m2. Notably, parameters for gross floor area
in the Industry zone are not specified in Noosa Plan.
Carparking
The applicant originally identified that another approved fitness centre in Noosaville’s industrial
estate (Selkirk Drive) have applied a car parking rate of 1.5 persons per car space in support of
20 patrons. The 1.5 persons per car space was applied when other uses were occurring on site
and recognizing the parking demand from those uses. A car parking survey was also conducted
for this site. An analysis determined the compatibility of other uses and their operating times and
found that on site car spaces were available for the gym use due to operating times of the
industrial uses. In this case, there are no other uses occurring on the site. Therefore, this
scenario is not accepted for this site.
The applicant proposes 13 car spaces (12 car spaces, 4 scooter spaces). The Code requires 1
car space per 20m2 of use area or 1 space per 3 persons capable of being entertained,
whichever is the greater. Based on the total tenancy use area of 377m2, 18.85 car spaces would
be required for the proposed use. If 20 patrons were proposed (as originally requested), based
on the rate of 1 space per 3 persons, 6.66 spaces would be required. This latter rate is not the
greater rate in this case and therefore not applicable.
The applicant has indicated their willingness for Council to condition the approval to mitigate any
impacts regarding class sizes and staggering of class times to ensure there is enough onsite car
spaces for peak parking demands.
To arrive at an appropriate number of people able to occupy the site, Council’s traffic consultant
was consulted with regard to such a use occupying the entire site. It was advised that in the
case for gyms, 0.85 spaces per person (including staff) is reasonable in this case. This is based
on the premise that patrons visiting gyms mostly drive their own cars, acknowledging that there is
a small amount of ride sharing, and a small amount of walk and cycle. This is especially relevant
for an industry area, when compared to a Business centre where walking and cycling would be
more common.
                                                                                    Page 29 of 90

Section 30

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          9 APRIL 2019


Therefore, the proposed 13 spaces would enable sufficient car parking availability for a maximum
number of 15 people present on site. A condition ensuring there is no overlapping of classes is
also recommended to ensure car parks are available at all times.
The proposed fitness centre use, provided numbers are capped as recommended, has sufficient
carparking available on site to address likely parking demands.
End of trip facilities
The Business Uses Code requires secure and convenient parking space for bicycles and end of
trip facilities. The applicant has proposed end of trip facilities being showers and change rooms,
however have not indicated proposed bicycle parking. The applicant indicated they will accept a
condition for this requirement. Minimum bicycle parking is 1 bicycle park per 100m2 of gross floor
area. The proposed gross floor area is 377m2. Therefore, it is proposed to condition the
development to provide for 4 spaces for bicycles.
4.     DRAFT PLANNING SCHEME
The site is to be located within a Medium Impact Industry zone and in the Venture Drive
Enterprise precinct where sport and recreation uses may be accommodated. A fitness centre is
considered an indoor sport and recreation use under the Draft Planning Scheme. Indoor sport
and recreation uses are code assessable if located within an existing building and not involving
the expansion of the building. The proposed use is within an existing building and there are plans
to expand the building. Therefore, the proposal would be impact assessable and a consistent use
under the Draft Planning Scheme.
5.    CONSULTATION
5.1. Referral Agencies
Not applicable.
5.2. Other Referrals
The application was forwarded to the following internal Council officers:
     Engineering Officer, Development Assessment
     Traffic Consultant, Stuart Holland (parking rate only)
5.3. Public Notification
The application was publicly notified for 15 business days in accordance with the Planning Act
2016. No properly made submissions were received.
6.     CONCLUSION & REASONS FOR DECISION
Whilst Entertainment and Dining Business Type 2 Recreation, amusement & fitness is an
inconsistent use in the Industry Zone, The Noosa Plan does recognise that some entertainment
uses will locate in the industrial area. The proposal can be conditioned to address car parking
requirements by restricting the number of people on site at any one time, providing 1 car space
per 0.85 persons utilising the site. Therefore the proposal is recommended for approval, subject
to reasonable and relevant conditions.
Departments/Sections Consulted:
     Chief Executive Officer       Community Services                       Corporate Services
     Executive Officer             Community Development                    Financial Services
     Executive Support             Community Facilities                     ICT
                                   Libraries & Galleries                    Procurement & Fleet
                                   Local Laws                               Property
                                   Waste & Environmental Health             Revenue Services

     Executive Services        x   Environment & Sustainable Development    Infrastructure Services
     Community Engagement          Building & Plumbing Services             Asset Management
     Customer Service          X   Development Assessment                   Buildings and Facilities
     Governance                    Economic Development                     Civil Operations
     People and Culture            Environmental Services                   Disaster Management
                                   Strategic Land Use Planning              Infrastructure Planning,
                                                                            Design and Delivery


                                                                                         Page 30 of 90

Section 31

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA     9 APRIL 2019


                                                  ATTACHMENT 1




                                                    Page 31 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                    9 APRIL 2019

                                                                                               ATTACHMENT 1

                                                         =     ———             ‘\
                                                      A
              Trofcetie & parmectie             a                             -      .
              SE)                                ieee
              -somaahacerge          beg Feast,      les ot       eee   HON
                         A (ital                          OO        be
                          eee
                           any
                            ere eT iN  i, ~                 sel                E
                                  a a             - 2                          ;3
                                   nar Meet Ty Th
                              ai                          \       IZ/7 4 on
                              PPO A ee  ET                 od
                                   P,      Fi        \                     4 =   pa
                            %       vane cone              \   200               (4 in total on wite)
                            BY) |, Appron, Bam"         t   \ Ap913612
                             i                   Sy"           1013me
                                                             \
                                                           i     |            “4.        a1
                wen                4                       4)        “see
                                 4                           8%)         _—      entive ouldoer oreo
                                                               3h
                                            27                    \     Boe
                                                                  \            :
                                                                    1,        ff
                                                                           #4.  Swoter Gay
                                                  7        rentR’ |           iP an    ne
                                           2       4     aoe              [7     oe “ ‘
                                           )              }    ms       orgs) pxisting Fence
                                      oA e   ]           “                 ¢        \
                              ZS             -  =:              ae:    |    "

                                                                             UE
                                                  prosecT            AVEN

                                                                         Scam 1200-Maeres
                                                   ————————————— a.
                                     RPD                  DEVELOPMENT     PROJECT
  LYNDA McDOUGALL        CY          Lot200 on FRONRES2   SUMMARY               Agplcaien ts Water oe   mae.
   \ oar 200 ov          ]>S         25 Proje Awe, NOOEAWILLE eee         Change of Use (yrenasiun) Bs
   e See on          2 UNRIS E        oneenias.                          Cain Mentha Wat         Lie
                                                                         Pp Pen                  bra

                                                                                                   Page 31 of 90

Section 32

Page 32 of 90

one     ic
      ige    46
      Sev    a>
      gaeo   o>
      $23    “§
     ¢¢        8
      33
        3      ‘=
        8      oO
        3      >
        -     |
               c
       n                                                                                    28995
       i                    [_—_>ARS—_KSA a                             a 399   a                                                             7000 ——
      sz                                      [/-———   4598 ———_| --————_                        [/-&-—— 5800 —————_+
      70 |
       wn                                                                                    at                           |                                    |                    )
       m                                  |                          '                       2 il                                                              |
                                          |                          |                       y tt                         3                                    |                        PwD
                                          1                              s    2              |  u                         &                                    |
                                                                     \-— STRUCTURAL BEAM    1                                                                  |
     Si   &   a6                          |                          |                                                   L         CONCRETE FLOOR TO MATCH              o               we
     ge   ¢   Bo             |            |                                                 Tn                                     EXISITING TO ENGINEERS               &
     8?   >   >              l            |—STRUCTURAL BEAM &        |                          i                                  SPECIFICATIONS
     z    &   3              |               UNE OF MEZZANINE OVER!                             I                                                                                     SHR
     Pas                     |            |                          |                          i
              ™                           '                          !                                                                                                                SHR
          E                  |            |                          |      GYM FLOOR AREA      ||  WALL TO BE DEMOUSHED AND           PROPOSED EXTENSION          =               >
          =                                                                                     | |—— INTERNAL BLOCKWORK DIMDING
                             |            \                          '                          ||  NEW BEAM INSTALLED TO                APPROX, £dm*              S
                             i                                       |                          il  STRUCTURAL ENGINEERS                                           &   +t          -
                                                                                                    DETA
                               ===        =                          '                          | |                                                                        | 00 |
         se   23                                                     |                       ei                                       Ree
         s2¢  €                           ——-   EXISTING AMENITIES                           7
         a3   zn                         LT     To ae cemousHe.      1                          ||                                                                        PROPOSED AMENITIES
        27    28                         i                           |                          1
         e°   “2                          t                          '                          II
                4                         tr                         |                          I
                                          =                                                     VI
                                          }                          '                          | |
                        |   RECEPTION     ls                         |                          in
                                          1                          1                          II
                                                                                                |                                                                  N
                         +                          ROLLERDOOR               ROLLEROOOR                   ROLLEROOOR
222    $8   73                           so                                                       ef                                                 ee
ae     SA   Sem         | 4800 ———_-|-—— 4000 ———| 1000 | ——— 4000 ——-|_ 2000 —|__—. 400 ———_|—- 200                                         4000 ———-|—1sc0-+|
ge     3    ose
az     &      =
"gs    &    $F                                                                                                                       BLOCK EXTERIOR WALL
  §    =    ae                                                                                                                       TO MATCH EXISTING
  g    8
  2         $=
  .           z          ©                                                    GROUND FLOOR PLAN
              =          3
                         3
  ez   og   ¢            bs
  i         ak           3
  x     2   3
  Be        S            #
            ae
            = ©          =
            3
            =            o
                         3

                                                                                                                                                                                  Page 32 of 90

Section 33

Page 33 of 90

So
      our     3&         §
      rai     as         |L,;
      eR      g>         3
      q Sg    2=
      ef        9        3                                                                                    G
         2¢     *%
      a8        2                                                                                             x
        27      ©        s                                                                                                              NOTES:
         :      =                                         —                                                                             COLOURBOND ROOFING & GUTTERING TO MATCH EXISTING
                         5                                3       [380-510                      —
                i                                                         3360              3100
                                                          S|                             —_——                                           EXTERNAL WALLS TO MATCH EXISITNG BLOCKWORK. FINISH
        wn                                                 ]                            _             T                                 TO BE RENDERED & PAINTED
        Cc               2          8           EXISITNG sink] |                                                                        NEW 2500 WIDE EAVES ALONG ENTIRE SOUTHERN WALL TO
                                    J
      o>                                                       =                                                                        STRUCTURAL ENGINEERS SPECIFICATIONS.
      220 |                                         gas                                                                                 AMENITIES BLOCKWORK WALLS & FINISH TO MATCH EXISTING
      i_                                                                                                &                               BUILDING FINISH, HYDRAULIC DRAINAGE PLANS TO BE
        w                           ——————————————                                                      So                              SUPPLUED.
        Mm
                                        0                                                           n                                   NEW CONCRETE TO ALL EXTERNAL SURFACES PER
                                               Siti                                                                                     STRUCTURAL ENGINEERS DETAILS.
     _         -                         NOTE:                    |                                                                     EXISITNG AMENTIES WITHIN EXISITNG STRUCTURE TO BE
       z   8   g e                        110mm INTERNAL              ——————_—_—_—__—_—__--=                                            DEMOUSHED. SERVICES TO BE CAPPED OFF AND MADE
     Be   $    2b                         PLASTERBOARD WALLS     |—-s370                                                                GOOD.
       g   &   8                          & 820 WIDE DOORS To
     82    =                              MEZZANINE AREA                                                                                DRAINAGE & WATER SERVICES TO NEW AMENITIES BLOCK TO
     z     §   3                                                                                                                        HYDRAULIC ENGINEERS DETAILS
     eS    g   3                                                                                                                        THESE PLANS ARE CONCEPT ONLY.
           =
           "                                             EXISITNG MEZZANINE PLAN
                                                                APPROX. FLOOR
                                                                AREA 30.7m*
         27    ao
         e—   ¢€
         ig    z a
         2     aS
         La
                 =z
                 a

                                                                                                                                                                                  NEW 2500 WIDE EAVES
=o           992                                                            oro                                                   I                   ——_—_                                          |
FTE     £2   223                                eee                                                                               |                           a                                   |
Be       nh  88           SE                                                                                                      f                                                             a
  3     £F=  a8                                                                                                                   I                                                             i          =>
a=      §    e a 4                                                                                                                t                                                             t
2       =F     es                                                                                                                 f                                                             1
u       =    of                                                 ROLLER DOOR                                                       I                                                             {
se      s    438                                                                                        8                    S    |                                                             |
o       =    a =                                                                                        a                    =    |                                                             }
fi’        fe                                                         COC                                                         |                                      |                      |
o 2     =    g >                *                                     a |                               o                    a    }                                                             4
g            5 &                                                                                                                  I                                      t                      1
-              .                                                                                                                  |                 [|                   !                      |
                                         Exit                                  AMENITIES BLOCK                                    f                                      t                      |
  te   se    Sf                                                                                                                                                                    ENTRY
  ae     3   Sh                        [999 —                                                       |                             pgp                                                          |
  &      *   =
  ee
  &          3p                                            EAST ELEVATION                                                                               WEST ELEVATION
             oF
             8                                                                                                                                                                                      y
             s                                                                                                                                                                      Om    Im   2m   3m__4m     5m

                                                                                                                                                                                                Page 33 of 90

Section 34

Page 34 of 90

our 3
    ba2 46
    288 82
    3 ;    S                                                          88  TT S006
      :    ©                                                                                    |}——___     7000 —_____—_.
           FT
      An        3
      om                             nnn)
    a=                                                                                                                       TO MATCH EXISTING
    "70 |                                                                                                                                    [oorne
     a      |                                                                                                                   T                  7
    ee                                                                                                                                        ROOFING
                8                                                                                                                “
    gi 3 g8    |                                                                                                                                     |
                                                                                                                                 g                  8
    gf 3                                                                                                                                           —
    Ss"   3                                            |—— 4000 ———_|                                                                     4100 ———|
    =     8                                             EXISTING                                           EXTENSION
        g a                      RENDERED & PAINTED BLOCKWORK                                                                          EXTERIOR WALL
        =                        TO ALL EXTERIOR WALLS
                                                                             SOUTH ELEVATION                                           AMENITIES

       o- oo
       ge  5
       ~ 2 é
      qf a8
            =                             ——

PER   SF FFa
ee” 3 a 3
 7   i   aq S          COLOURBOND
 a   =   te            ROOFING   _     2
 5       32                       L
  :        t   i                  3
 ft ef of         |» ——|
 ak
 RF                  AMENITIES                                               NORTH ELEVATION
         ef
         8                                                                                                                       Om Im   2m  3m_4m  5m
         =                                                                                                                     (el              Ll
                                                                                                                                           Page 34 of 90

Section 35

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                               9 APRIL 2019


3                        MCU16/0079.03 - REQUEST TO CHANGE A DEVELOPMENT APPROVAL FOR 5
                         MEMORIAL DRIVE, TEWANTIN
DOCUMENT INFORM AT ION




Author                          Coordinator Planning, Patrick Murphy
                                Environment and Sustainable Development Department

Index                           ECM/ Application/ MCU16/0079.03

Attachments                     1.   Proposal Plans
                                2.   Comments by WBP Architects




APPLICATION DETAILS

Application No.                             MCU16/0079.03

Development Approval                        Development Permit for Material Change of Use of Premises -
                                            Extension to existing RSL Club

Applicant                                   Rubicon Design and Construct

Request Received On                         4 February 2019



PROPERTY DETAILS

Property Address                            5 Memorial Avenue, Tewantin

RP Description                              Lot 10 on SP 273411

Land Area                                   6,116m2

Existing Use of Land                        Tewantin Noosa RSL Club



STATUTORY DETAILS

SEQRP Designation                           Urban Footprint

Locality                                    Tewantin and Doonan

Zone                                        Community Services

Overlays                                    Natural Hazard Overlay (Bushfire & Acid Sulphate Soils)

Assessment Type                             Minor Change to Development Approval




                                                                                              Page 35 of 90

Section 36

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   9 APRIL 2019


RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 9 April 2019 regarding Application No. MCU16/0079.03 to make a
minor change to an existing approval for extensions to the RSL club situated at 5 Memorial
Avenue, Tewantin, described as Lot 10 on SP 273411 and:
A.   Refuse the change for the following reasons:
     1.    In accordance with architectural commentary at the time of the assessment of the
           original application the screens are required to reduce the impact of the building and
           provide visual interest to the building and streetscape.
     2.    The building form presents as a back of house/ service area to Pelican Street with
           limited opportunity for landscaping to screen the building. The proposed presentation
           to Pelican Street is not an appropriate response to the local streetscape and is not
           reflective of the Tewantin character.
     3.    The screens are required to ensure the building meets the overall specific outcomes
           of the Tewantin and Doonan Locality Code.
B.   Consider the amended colour on the louvres as Generally in Accordance with the original
     approval.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1.   PROPOSAL
The applicant has recently completed construction of extensions and renovations to the existing
RSL club on the site, which were approved by Council in February 2017. A recent inspection of
the site by Council staff revealed that the external appearance of the building was not in
accordance with the conditions of approval with regard to the provision of timber look aluminium
screens that were specifically included as part of the approved plans to address concerns with
the appearance of the proposed building.
The applicant is requesting to amend the approved plans in order to be consistent with what has
already been implemented on site. In this regard, the applicant seeks to amend Condition 2 and
include amended plans that reflect the building façade without the approved louvres and
screening.
A copy of the proposal plans are included at Attachment 1.
2.   BACKGROUND
The Tewantin Noosa RSL has been located on the site for a number of years, with the original
building occupying the land fronting Poinciana Avenue, being Lot 3. Since that time, the RSL has
continued to grow in response to community need. The current development approvals for the
existing RSL are briefly described below:
   TPC 1894 – Dining Room (Caterer’s Room) an Extension to Existing RSL;
   TPC 2782 – Extensions to Existing RSL Club;
   R 473 – Rezoning from Special Use – Church to Special Facilities RSL Club in accordance
     with a Plan of Development;
   3B-388 Special Facilities (RSL Club in accordance with the Plan of Development);
   1043 TC – Tewantin Noosa RSL and Citizens Memorial Club – Liquor Sales Area &
     Ancillary Changes;
   MCU16/0079 - Development Permit for Material Change of Use of Premises - Extension to
     existing RSL Club.

                                                                                  Page 36 of 90

Section 37

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   9 APRIL 2019


    MCU16/0079.01 – An amendment to the existing approval was approved by Council on 29
      August 2017 primarily relating to changes to the internal floor layouts and the roof form.
    MCU16/0079.02 – An amendment to the existing approval was approved by Council on 22
      May 2018 which increased the number of gaming machines from 180 to 195 machines.
The most recent Material Change of Use application (MCU16/0079) related to significant
extensions and alterations to the RSL Club proposed along the Pelican and Doonella Street
frontages of the site. During assessment of MCU16/0079, significant concerns were raised with
the proposed building’s street presentation in terms of bulk, amenity and setbacks which resulted
Council engaging an architectural consultant to review the proposal plans.
A locality plan of the site is provided below:




                                          Figure 1 – Site Location

3.    ASSESSMENT
3.1. Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
    State Planning Policy;
    South East Queensland Regional Plan;
    Planning Regulation 2017;
    The Noosa Plan.



                                                                                  Page 37 of 90

Section 38

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   9 APRIL 2019


The applicant has requeted to make a minor change to a development approval under s78 of the
Planning Act 2016. An application for a minor change to a development approval can only be
made in circumstances where a change would constitute a ‘minor change’.
The proposed change to the development approval requested by the applicant is determined to
constitute a minor change on the grounds that:
   the development would not result in substantially different development as the use and built
     form are not significantly altered;
   the change does not include prohibited development;
   the change would not require the application to be referred to an additional referral agency
     or cause a referral agency to have regard to new matters prescribed by regulation;
   where the original application was code assessable, the change would not cause the
     application to become impact assessable.
3.2. Statutory Instruments – Planning Scheme
The applicant seeks to amend condition 2.
     Condition 2 Development undertaken in accordance with this approval must generally
     comply with the approved plans of development. The approved plans are listed in the
     following table unless otherwise amended by these conditions.

     Plan No.              Rev.    Plan/Document Name                          Date

     1620/DA/1.02          D       Existing/Demolition Ground Floor Plan       15/05/17

     1620/DA/2.01          P       Proposed Basement Plan – Stage 4            28/07/17

     1620/DA/2.02          L       Proposed Ground Floor Plan – Stage 4        28/07/17

     1620/DA/2.05          K       Proposed Roof Plan – Stage 4                28/07/17

     1620/DA/3.01          G       Sections – Stage 4                          28/07/17

     1620/DA/4.01          K       Elevations – Stage 4                        28/07/17

     1620/DA/5.01          G       Landscape Concept Strategy – Plan           28/07/17

     1620/DA/5.02          E       Landscape Concept Strategy                  28/07/17

     For clarity, in regard to Plan No. 1620/DA/2.02 Rev. L Proposed Ground Floor Plan – Stage
     4 dated 28/07/17 the maximum number of gaming machines is limited to 195 machines.
Applicant’s Request
The applicant requests that condition 2 be amended to reflect the building façade as constructed
on site. The applicant states:
As seen below, the current Pelican Street façade of the RSL building is considered to be
generally consistent with the stamped plans referenced within the decision notice. Whilst the
timber look aluminium louvres are slightly different to that approved by Council, the chosen
materials are still considered to be in keeping with the heritage character of Tewantin and thus
complies with Condition 12 of the decision notice.




                                                                                  Page 38 of 90

Section 39

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                             9 APRIL 2019




                     Figure 2 – Applicant’s Photograph of Existing Screens and Treatment.

In addition, it is acknowledged that the Pelican Street façade does not include the additional
louvers as illustrated within the stamped approved plans. Following DA approval, the construction
estimates resulted in the need for cost saving measures. It was determined that the additional
louvers along Pelican were not required as they were to be solely used a cosmetic feature, unlike
the louvers used for the adjacent smoker’s area which provided a barrier between the patron
area and the street frontage.
Given the land owner and operator is a not-for-profit entity it is considered to be unreasonable to
enforce the implementation of the additional louvers when they serve no other purpose than
being a cosmetic feature.
The applicant considers the building façade to be in keeping with the heritage character of the
area and has included a commentary plan prepared by WBP Architects included in Attachment
2 that outlines the difference between the approved plans and the current façade. An extract of
this comparison is detailed below.




                                                                                            Page 39 of 90

Section 40

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     9 APRIL 2019




                               Figure 3 – Extract of Applicants Comparison

Assessment of Request
It is agreed that the aluminium screens installed around the smoking area are in keeping with the
intent of the approved plans and reflect the appearance of timber battens. Whilst the finish of the
screens is more reflective than originally envisaged, the subdued colour is sympathetic to the
building and the surrounds and can be considered in accordance with the conditions of approval.

                                                                                    Page 40 of 90

Section 41

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    9 APRIL 2019


The applicant’s request for deletion of the screens approved to the eastern façade however is not
supported. During assessment of the original application, significant concerns were raised with
regard to the bulk and scale of the development especially with regard to the treatment of the
street frontages. Council engaged an architectural consultant to review the plans and a number
of revised plans were submitted. The second peer review of the proposal plans by Council’s
architectural consultants included comments:
     the introduction of additional materiality, screening services, battening with a timber
       appearance and the deletion of one set of stairs has improved setback treatment;
     the introduction of different materials in response scheme has assisted in breaking up the
       perception of the podiums bulk when viewed from Pelican and Doonella Street.
The requirement for the screens was therefore a direct result of architectural comments that
these screens were significant in reducing the impact of the building, breaking up the form and
providing visual interest to the building and streetscape.
The current streetscape presentation to Pelican Street includes a sealed driveway entrance of
over 9 metres in width that provides a direct view to the eastern façade of the building which has
limited articulation as demonstrated in figure 4 below. The building form presents as a back of
house/ service area to Pelican Street with limited opportunity for landscaping to screen the
building. This presentation to Pelican Street is not considered an appropriate response to the
local streetscape and is not reflective of the Tewantin character which provides for smaller
building forms with high levels of detail.




Figure 4 – Photograph of Pelican Street Streetscape Presentation

It is also noted that a number of setback concessions were granted as part of assessment of the
original application and were linked to the use of additional materials, landscaping and screens
and battens to break the bland, bulky building form.
The applicant’s submission is not supported.
4.     DRAFT PLANNING SCHEME
The Draft Planning Scheme includes the site in the District Centre zone and the RSL use is a
consistent use in the zone. The purpose of the District Centre zone includes outcomes that relate
to design including:
     Development has a high level of architectural merit and contributes positively to the
       activation of the street and the character of the centre.
     Development reinforces the traditional ‘main street’ character and scale of development in
       the centre;

                                                                                   Page 41 of 90

Section 42

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 APRIL 2019


    Development facilitates the creation of vibrant and safe business centres, with attractive
      and functional buildings and streets with integrated high amenity public spaces
Performance outcomes also include specific requirements relating to building design and
streetscape including:
     Frontages to public streets or other public or semi-public spaces are articulated with
       vertical elements to emphasise a finer-grain and human scale to the building frontage;
     Variations in the treatment and patterning of windows, sun protection and shading devices,
       or other elements of a façade treatment at a finer scale than the overall building structure
5.     CONCLUSION & REASONS FOR DECISION
The applicant’s request to amend the approved plans to enable removal of screens that were
required to provide articulation to the façade of the building is not supported. The screens were
considered by architectural consultants to be an important component of the overall fabric of the
building and were required to assist in reducing the overall scale and bulk of the development.
Due to the existing driveway access, there is limited opportunity for landscaping to screen the
area and the screens are required to provide additional articulation and detail to this area. The
request to change the appearance of the louvres however is supported and considered to be
Generally in Accordance with the approved plans.

Departments/Sections Consulted:
   Chief Executive Officer        Community Services                      Corporate Services
     Executive Officer            Community Development                   Financial Services
     Executive Support            Community Facilities                    ICT
                                  Libraries & Galleries                   Procurement & Fleet
                                  Local Laws                              Property
                                  Waste & Environmental Health            Revenue Services

     Executive Services           Environment & Sustainable Development   Infrastructure Services
     Community Engagement         Building & Plumbing Services            Asset Management
     Customer Service             Development Assessment                  Buildings and Facilities
     Governance                   Economic Development                    Civil Operations
     People and Culture           Environmental Services                  Disaster Management
                                  Strategic Land Use Planning             Infrastructure Planning,
                                                                          Design and Delivery




                                                                                       Page 42 of 90

Section 43

ATTACHMENT 1




Page 43 of 90

——    |      |   moc
                          Si lit       |      ine    it .
  (Ted      ptt           .   | aR              ani AT)
                              Th A     |      1. te
                                              | |       4
     |   a         I       4   th      |    @   it le \
      mn              |        i       :               |
     |             |                   |      (cs    5)  |
     fe                      oi         ie? : |e
     | a il  |     |  |      I         a    aI  i   —
         |   Hest                     74  |   i “al     :
       al TW 4              hE      [|        =        i
     .        ENT            Ae [i        aE         to
     |   | — . F             |  =     | a       mr        |
     |      —   =)    |      J — |     E= |    | HII =)
     og         =i          Fa |    eel! a
            SI  =) le      ay WA.             we.
     S|         ae       ae     Bay           |     Ee
     |   |    : = 2)       °        ==        | A    Zag
     OE Ss ie i                 iS iL. |        ull     =
     |   |      === | | gee        =|==  i      cH   ==
     |  |   L =         “thy ee |   at ee      ae
          ty    Slat            Ne          | aE =
       ok Je          a         a         |   a
     |      r   &     |         ay } te      ve se
     ;   | t     |    |         mal       | oth filed lie
     |       .        el        —   1h          RH   = :
         |i        '       ||   at           ney i
           |     B\ &       ie      my        : ae is
         |          '       &         1   |  rae
     |   |          fj     @   an     1-be al   |      E  Mi
         |           f |i   fj =      |       —a          E
     ;   | TN f               ae me       i  4 i           z
         |      V/ |         =       eT     Tdi
     ;           \ /       wil t--     Eg       -          >
     pS               |        ik            Ae            2
     |   |      f  |  |       We |                         =
         |  To     |  lig    sls a §_e
                p  |            a           ee
         an   i      i .        .
    i Bt 236   3      —
   el 5 a's              |
   = i g2       cue
o

Section 44

ATTACHMENT 2




    Page 44 of 90

ATTACHMENT 2
  MINOR CHANGE COMMENTARY
          eo    4         ef         FB ee
   pemanemnmen |e) EES se="= allie —_
   ee eee;                         eam TTT
      if {cf                                                 ,
      : 2
  — Pe                   reer                rete
          ©    a      6      ©     &       ©            és  é
  ms ELEVANON — PELICAN STREET          — TWEER-LOCK LOUVRE FINGH IS — TWEER-LOOK ALUWINUM LOUVRE
                                         sree © Came cae eases
  ORIGINAL CONSENT VERSION |. |-ssgz:azae
                                         BUILDINGS IN THE VERNACULAR STYLE
          °     °         ?       T           atin at          ae
  ssermepemine |p           Saul                      ="     _
            a                    SSS aml   AN TEM        KAA |
      i  BB    —————_ ——  I          Set                  ee i
          0    eS          LSS     SS                   ae {
  —— ern sree ae                   tI ee dee
 __ | SEIS NT                                         ee | ae
CBR ES Serr
  MINOR CHANGE VERSION
                                                            Page 44 of 90

Section 45

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                    9 APRIL 2019



4                       OPW19/0046 - DEVELOPMENT APPLICATION FOR OPERATIONAL                                WORKS
                        (ADVERTISING DEVICE) SITUATED AT 1/100 RENE STREET, NOOSAVILLE
OCUMENT INFORM AT ION




Author                           Contract Planner, Ben Thrower
                                 Environment and Sustainable Development Department

Index                            ECM/ Application/ OPW19/0046

Attachments                      Nil


APPLICATION DETAILS
Applicant                                  Reece Australia P/L
Proposal                                   Operational Works - Signage
Properly Made Date                         28 February 2019
Information Request Date                   N/A
Information Response Date                  N/A
Decision Due Date                          18 April 2019
Number of Submissions                      N/A


PROPERTY DETAILS
Property Address                           Noosa Metro Innovation Park, 1/100 Rene Street, Noosaville 4566
RP Description                             Lot 1 SP 230643
Land Area                                  1,585 m²
Existing Use of Land                       Industrial Business Type 1
                                           Industrial Business Type 2
                                           Education Type 3


STATUTORY DETAILS
SEQRP Designation                          Urban Footprint
Locality                                   The Noosa Plan
Zone                                       Shire Business Centre
                                           Open Space
Overlays                                   Biodiversity: Environment Protection Area
                                           Natural Hazard Overlay: Bushfire Hazard and Acid Sulfate Soils
Assessment Type                            Code




                                                                                                   Page 45 of 90

Section 46

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     9 APRIL 2019


RECOMMENDATION
That Council note the report by the Contract Planner to the Planning & Environment Committee
Meeting dated 9 April 2019 regarding Application No. OPW19/0046 for a Development Permit for
Operational Works - Signage, situated at Noosa Metro Innovation Park, 1/100 Rene Street,
Noosaville and:
A.   Refuse the application for the following reasons:
     1.    The application proposes an Advertising Device in the form of a Wall Sign in excess
           of 4m2 signface area which is inconsistent with:
           i.     Overall Outcomes of The Noosa Plan’s Advertising Devices Code, being that:
                  a.   The proposed advertising device does not complement and detracts from
                       the desirable characteristics of the natural and built environment in which
                       the advertising devices are exhibited;
                  b.   The proposed advertising devices is not designed and integrated into the
                       built form so as to minimise visual clutter;
                  c.   The proposed Advertising Device exceeds the legitimate need to provide
                       directions and business identification in a manner that is consistent with
                       achieving the codes overall outcomes; and
                  d.   Signs with a signface area exceeding 4m² are not located in Noosa Shire.
           ii.    Specific Outcomes of The Noosa Plan’s Advertising Devices Code, being that:
                  a.   Signs with a signface area exceeding 4m² are inconsistent with the
                       overall outcomes sought by this Code and are not located in Noosa Shire;
                  b.   The proposed sign is not compatible with the existing and future planned
                       character of the locality in which it is situated;
                  c.   The proposed sign is not designed, sited and integrated to not contribute
                       to the proliferation of visual clutter and to not unduly dominate the visual
                       landscape; and
                  d.   The proposed sign is not of a scale, proportion and form that is
                       appropriate to the streetscape in which it is located.
           iii.   Probable Solutions of The Noosa Plan’s Advertising Devices Code, being that:
                  a.   Advertising devices do not include signs with a signface area exceeding
                       the Acceptable Solutions of this Code or 4m², whichever is the lessor; and
                  a.   General design and amenity complies with the specific requirements for
                       all types of advertising devices, including a Wall Sign, do not exceed a
                       maximum signface area of 4m².
B.   With regard to the other existing Window Sign advise the applicant to:
     1.    Make the Window Sign compliant with the Advertising Devices Code’s Acceptable
           Solutions; or
     2.    Remove the Window Sign; or
     3.    Lodge a development application seeking approval for the Window Sign.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.




                                                                                    Page 46 of 90

Section 47

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     9 APRIL 2019


REPORT
1.   PROPOSAL
The application seeks a retrospective Operational Works Development Permit for an existing
Advertising Device in the form of a Wall Sign (non-illuminated) located on the side of an existing
building located at Noosa Metro Innovation Park 1/100 Rene Street, Noosaville (refer to Figures
1 and 2). The subject sign is already erected on the wall of the existing building, in addition to:
   A second unapproved and non-conforming Window Sign which does not form part of this
     application; and
   An existing pylon sign which is located within the common property of Noosa Metro
     Innovation Park. This sign is the outcome of a successful appeal and approval by the
     Planning and Environment Court on 20 July 2009 following a decision by Council to refuse
     the sign.
This application is in response to a compliance check undertaken by Council’s Compliance
Officer on or about 20 November 2018, who found the existing Wall Sign does not conform to the
original approved plans and/or the Noosa Plan provisions.
The subject sign comprises a width of 5.6m and height of 1.57m, being a total signface area of
8.792m² (refer to Figure 3). Pertinent to the assessment of this application, the applicant
considers the proposed sign is consistent with The Noosa Plan signface area provisions for the
following reasons:
          “The proposed sign is compatible with the character of the industrial
             business locality in which it is exhibited. The locality comprises
             predominately of large, industrial buildings including examples of signage of
             similar or greater dimensions;
          The proposed sign is compatible with the scale and proportion of the
             building with the sign reflecting 2.5% of the northern façade;
          The proposed sign is of scale, proportion and form that is appropriate to the
             streetscape with the sign being integrated into the built form and
             proportionate to the size of the building. The sign is also compatible with
             other development in the immediate locality such as the directly adjacent
             Trade Link;
          The sign has been carefully considered so that it is integrated into the built
             form and proportionate to the size of the building with the size limited to
             2.5% of the northern façade. Furthermore, the proposal seeks to
             consolidate signage into a single sign rather than having multiple signs so
             as to minimise visual clutter. The proposed sign is maintained below the
             total overall signage allowance of 10sqm for the site;
          The sign maintains and supports a high standard of architectural, urban
             and landscape design for the site in manner that is compatible with the
             industrial business locality.”
The application is before Council in accordance with the current decision making delegations
because the proposed Wall Sign is recommended for refusal.




                                                                                    Page 47 of 90

Section 48

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                            9 APRIL 2019




                       Figure 1 - Proposed Advertising Device (Wall Sign) location




Figure 2 - Photo of the subject Wall Sign, the unapproved Window Sign and existing Pylon Sign servicing 11
                              lots within the estate, as viewed from Rene Street




 Figure 3 - Proposed Wall Sign dimensions, being 5.6mm width, 1.57m height and 8.792m² signface area.


                                                                                           Page 48 of 90

Section 49

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                  9 APRIL 2019


2.       SITE DETAILS
2.1. Background
On 13 May 2008 a Development Permit was granted for a Material Change of Use for Industrial
Business Type 1 & 2 and Education Type 3 uses to operate on the site.
On 20 July 2009, the Planning and Environment Court issued a consent order permitting a 9.5m
high Pylon Sign (Council reference 142008.1689). The sign was constructed soon afterwards
and now provides a place for businesses within the estate to advertise, as seen within Figure 2.
On the 14 October 2010, an estate containing eleven individual lots and common property was
created. The common property includes the driveway/access point to each lot and the location of
existing Pylon Sign.
On 16 February 2018 a minor change to the existing approval was granted which included plans
of development for the subject building (Council reference 132007.1841.7). The approved plan
identifies two proposed Wall Signs, with each sign complying with the Noosa Plan, being 4m
width, 1m height and a signface area of 4m² (refer to Figure 4).




     Figure 4 - Extract of plans approved 16 February 2018 illustrating two wall signs, each complying with the
                         Noosa Plan, being 4m width, 1m height and a signface area of 4m².

On or about 20 November 2018 Council’s compliance officer noted the existing sign does not
conform with:
       The signage plan assessed and approved as part of the preceding change to the existing
         approval; and
       The Noosa Plan provisions as they relate to Advertising Devices.
As a result the applicant was advised that the sign needed to be reduced to 4m² signface area or
an application (i.e. this application) would need to be submitted to Council.
Prior to lodgement of this application, the applicant’s representative contacted Council’s planning
department, whereby they were advised that Council’s planners would likely recommend the
application be refused based on conflicts with the Noosa Plan provisions. Regardless of this
advice, the applicant proceeded to lodge this application as is.




                                                                                                 Page 49 of 90

Section 50

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                 9 APRIL 2019


On 14 March 2019, being post lodgement of this application, the applicant’s representative was
again advised that Council’s planners would likely recommend the application be refused based
on conflicts with the Noosa Plan provisions. Regardless of this advice, the applicant’s
representative advised that they wished to proceed to a final decision to be made by Council.
Of relevance to the assessment and decision making for this development application, Council
strengthened the signface area provisions within The Noosa Plan at its Ordinary Meeting on 15
June 2017 as part of the package of alignment amendments undertaken with the transition to the
new Planning Act 2016. The amendment was directly in response to unfavourable mediation
outcomes relating to the nearby StorageFirst Self Storage application for signage (Council
reference OPW15/0214) and to address changes to decision rules under the Planning Act 2016.
Based on the outcomes of this mediation process, Council’s solicitor recommended that:
    The Advertising Devices Code is strengthened if Council wishes to enforce the maximum
      signface area of 4m² for all developments; and
    The maximum signface area should be included as an item within the outcomes of the
      Advertising Devices Code rather than relying on the more subjective statements of the then
      current overall and specific outcomes of the code.
2.2. Site Description
The site supports an existing warehouse operating as an Industrial Business at 1/100 Rene
Street, Noosaville (refer to Figure 5).
The site forms part of the Noosa Metro Innovation Park estate, which consists of similar
warehouses and uses, while some of the lots within the estate remain vacant. The common
property within the estate supports the existing Pylon Sign.
The proposed location of the Wall Sign is clearly visible from Rene Street.




Figure 5 - Aerial Photo of the site and Noosa Metro Innovation Park estate, illustrating the existing Pylon Sign,
                                          Wall Sign and Window Sign.

                                                                                                Page 50 of 90

Section 51

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          9 APRIL 2019


2.3. Surrounding Land Uses
The site is surrounded to the north and west by other similar Industrial Warehouse uses and
Eenie Creek Bushland Reserve to the south and east (refer to Figure 6).
Adjoining the estate to the west is StorageFirst Self Storage which includes two signs exceeding
4m² signface area, being 6m² each. These signs are the result of a successful appeal against
Council’s decision to refuse the proposed signs on the basis they exceed 4m² this occurred prior
to Council strengthening its provisions related to signage in 2017.




                        Figure 6 - Aerial photo of the site and surrounding land uses.

3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
     State Planning Policy;
     South East Queensland Regional Plan;
     Planning Regulation 2017;
     The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.




                                                                                         Page 51 of 90

Section 52

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      9 APRIL 2019


South East Queensland (SEQ) Regional Plan
The site is located within the urban area of the SEQ Regional Plan. The proposal is consistent
with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The following assessment benchmark from the Planning Regulation 2017 applies to the
application:
    SEQ Development Area
The proposal is for urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the Advertising Devices Code. The pertinent issues
arising out of the assessment against the code provisions generally relate to the proposed sign’s
8.792m² signface area exceeding 4m². In addition, it is also considered the size and siting of the
proposed sign is an excessively prominent element of the streetscape, contributes to the visual
clutter in the street and is not consistent with the unobtrusive signage strategy sought for Noosa
Shire.
Notably, the surrounding locality includes some other signs which exceed 4m² signface area.
However, these signs have either been approved under court order, following a Council
resolution to refuse the subject signage and/or are unlawful, with no development permit in place.
It is noted that the Planning Scheme was amended, following the most recent Court Order, to
strengthen Council’s resolution that advertising devices exceeding 4m² signface area are not
located in Noosa Shire.
On this basis, the proposal is not supported as it is inconsistent with:
1.    Overall Outcomes of The Noosa Plan’s Advertising Devices Code, being that:
      i.     The proposed advertising device does not complement and detracts from the
             desirable characteristics of the natural and built environment in which the advertising
             devices are exhibited;
      ii.    The proposed advertising devices is not designed and integrated into the built form
             so as to minimise visual clutter;
      iii.   The proposed Advertising Device exceeds the legitimate need to provide directions
             and business identification in a manner that is consistent with achieving the codes
             overall outcomes; and
      iv.    Signs with a signface area exceeding 4m² are not located in Noosa Shire.
2.    Specific Outcomes of The Noosa Plan’s Advertising Devices Code, being that:
      i.     Signs with a signface area exceeding 4m² are inconsistent with the overall outcomes
             sought by this Code and are not located in Noosa Shire;
      ii.    The proposed sign is not compatible with the existing and future planned character of
             the locality in which it is situated;
      iii.   The proposed sign is not designed, sited and integrated to not contribute to the
             proliferation of visual clutter and to not unduly dominate the visual landscape; and
      iv.    The proposed sign is not of a scale, proportion and form that is appropriate to the
             streetscape in which it is located.




                                                                                     Page 52 of 90

Section 53

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         9 APRIL 2019


3.       Probable Solutions of The Noosa Plan’s Advertising Devices Code, being that:
         i.    Advertising devices do not include signs with a signface area exceeding the
               Acceptable Solutions of this Code or 4m², whichever is the lessor; and
         ii.   General design and amenity complies with the specific requirements for all types of
               advertising devices, including a Wall Sign, do not exceed a maximum signface area
               of 4m².
While the existing unapproved and non-compliant Window Sign (refer to Figure 2) does not form
part of this application, it is considered likely the same assessment outcome would apply should
a development application be lodged seeking its approval. On this basis, and post Council’s
decision of this application, it is recommended that Council’s compliance officers advise the
applicant to either make the sign compliant, remove the sign or lodge a development application
seeking a development permit for the sign.
4.       DRAFT PLANNING SCHEME
The Draft Planning Scheme does not contain any assessment criteria relevant to Advertising
Devices. Alternatively, Advertising Devices are proposed to be assessed under a new Local Law
which is currently under draft.
5.       CONSULTATION
5.1. Referral Agencies
Nil.
5.2. Other Referrals
Not applicable.
5.3. Public Notification
Not applicable.
6.       CONCLUSION & REASONS FOR DECISION
The application seeks a retrospective Operational Works Development Permit for an existing
Advertising Device in the form of a new Wall Sign located on the side of the existing industrial
building located at Noosa Metro Innovation Park, 1/100 Rene Street, Noosaville. The proposed
Advertising Device, in the form of a Wall Sign in excess of 4m² signface area, is considered
inconsistent with the Overall Outcomes, Specific and Probable Solutions of the Advertising
Devices Code because:
      Signs with a signface area exceeding 4m² are not to be located in Noosa Shire;
      The proposed advertising device does not complement and detracts from the desirable
       characteristics of the natural and built environment in which the advertising device is
       exhibited;
      The proposed sign is not compatible with the existing and future planned character of the
       locality in which it is situated; and
      The proposed sign is not of a scale, proportion and form that is appropriate to the streetscape
       in which it is located.
On this basis, it is recommended the application is refused.
While the existing unlawful Window Sign does not form part of this application it is recommended
that Council’s compliance officers advise the applicant to:
1.       Make the Window Sign compliant with the Advertising Devices Code’s Acceptable
         Solutions; or
2.       Remove the Window Sign; or
3.       Lodge a development application seeking approval for the Window Sign.
                                                                                        Page 53 of 90

Section 54

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 APRIL 2019


Departments/Sections Consulted:

   Chief Executive Officer        Community Services                      Corporate Services
   Executive Officer              Community Development                   Financial Services
   Executive Support              Community Facilities                    ICT
                                  Libraries & Galleries                   Procurement & Fleet
                                  Local Laws                              Property
                                  Waste & Environmental Health            Revenue Services

   Executive Services         X   Environment & Sustainable Development   Infrastructure Services
   Community Engagement           Building & Plumbing Services            Asset Management
   Customer Service           X   Development Assessment                  Buildings and Facilities
   Governance                     Economic Development                    Civil Operations
   People and Culture             Environmental Services                  Disaster Management
                                  Strategic Land Use Planning             Infrastructure Planning,
                                                                          Design and Delivery




                                                                                       Page 54 of 90

Section 55

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                          9 APRIL 2019


5                        PLANNING & ENVIRONMENT COURT APPEAL NO. 245 OF 2019 (M DESIGN &
                         FOURTEEN ENTERPRISES) - REFUSAL OF A MINOR CHANGE TO A DEVELOPMENT
                         APPROVAL FOR ADDITION OF A SWIMMING POOL AND DECK AT 42 SEAVIEW
                         TERRACE, SUNSHINE BEACH
DOCUMENT INFORM AT ION




Author                               Manager Development Assessment, Kerri Coyle
                                     Environment & Sustainable Development Department

Index                                ECM/ Application/ 51987.2951.01 / Case / 245/2019 M Design and Fourteen
                                     Enterprises Pty Ltd

Attachments                          Nil



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 9 April 2019 regarding Planning & Environment Court
Appeal No. 245 of 2019 and agree to defend the appeal.


REPORT
A report on this application to change an existing development approval for a house to facilitate
the construction of a swimming pool and extend a deck within the Coastal Building Line at 42
Seaview Terrace, Sunshine Beach was considered by Council at its Ordinary Meeting on 20
December 2018.
At the Ordinary Meeting Council found the proposal was contrary to the Noosa Plan and state
policy for coastal management and accordingly resolved to refuse the application for the
following reasons:
1.                       The proposal is in conflict with the assessment benchmarks of the State Planning Policy as
                         it proposes development in an Erosion Prone Area and Natural Hazard Area.
2                        Development seaward of the Coastal Building Line is contrary to the building setbacks
                         contained in the Planning Scheme and the setback provided under State Code 8; Coastal
                         Development and Tidal Works of the State development assessment provisions.
3.                       Recent modelling carried out by the Council indicates significant erosion is likely to occur in
                         the future which may threaten life and property should the proposed development proceed.
4.                       The proposal does not comply with the Planning Scheme in force at the time of the original
                         approval, given the extent of excavation and vegetation removal in a sand dune area.
5.                       The proposal does not comply with the Natural Resources Overlay Code for Coastal
                         Protection as it has the potential to adversely impact on natural coastal processes.
6.                       Given the site is affected by the Coastal Building Line and is located in a highly vulnerable
                         erosion prone area, the proposed 6m setback is not sufficient to minimise the risk of
                         erosion.
7.                       The proposal does not comply with the Biodiversity Overlay Code as vegetation is
                         proposed to be removed within the Environmental Protection Overlay placing the integrity
                         and resilience of the foreshore at risk.
                                                                                                         Page 55 of 90

Section 56

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      9 APRIL 2019


8.   The proposal is contrary to the Overall Outcomes for the Eastern Beaches Locality as it
     does not protect the dunal area and natural environment nor maintain the safety of people
     and works.
The applicant subsequently appealed the decision stating that the application should be
approved subject to reasonable and relevant conditions.
It is in order for Council to defend the appeal and the recommendation is worded accordingly.


Previous Council Consideration
Ordinary Meeting Minutes, 20 December 2018, Item 1, Page 12
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 11 December 2018 regarding Application No. 51987.2951.01 to make
a minor change to an existing approval for additions to a detached house to include a swimming
pool, deck and other structures seaward of the coastal building line situated at 42 Seaview Tce,
Sunshine Beach and:
A.   Refuse the change for the following reasons:
     1.    The proposal is in conflict with the assessment benchmarks of the State Planning
           Policy as it proposes development in an Erosion Prone Area and Natural Hazard
           Area.
     2.    Development seaward of the Coastal Building Line is contrary to the building
           setbacks contained in the Planning Scheme and the setback provided under State
           Code 8; Coastal Development and Tidal Works of the State development assessment
           provisions.
     3.    Recent modelling carried out by the Council indicates significant erosion is likely to
           occur in the future which may threaten life and property should the proposed
           development proceed.
     4.    The proposal does not comply with the Planning Scheme in force at the time of the
           original approval, given the extent of excavation and vegetation removal in a sand
           dune area.
     5.    The proposal does not comply with the Natural Resources Overlay Code for Coastal
           Protection as it has the potential to adversely impact on natural coastal processes.
     6.    Given the site is affected by the Coastal Building Line and is located in a highly
           vulnerable erosion prone area, the proposed 6m setback is not sufficient to minimise
           the risk of erosion.
     7.    The proposal does not comply with the Biodiversity Overlay Code as vegetation is
           proposed to be removed within the Environmental Protection Overlay placing the
           integrity and resilience of the foreshore at risk.
     8.    The proposal is contrary to the Overall Outcomes for the Eastern Beaches Locality as
           it does not protect the dunal area and natural environment nor maintain the safety of
           people and works.
B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

Finance & Risk
It is premature at this stage to provide advice on the likely prospects of the appeal. There will be
costs associated with defending the appeal.




                                                                                     Page 56 of 90

Section 57

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 APRIL 2019


Consultation
External Consultation - Community & Stakeholder
Wakefield Sykes – Solicitor

Internal Consultation

Departments/Sections Consulted:

   Chief Executive Officer        Community Services                      Corporate Services
   Executive Officer              Director                                Director
   Executive Support              Community Development                   Financial Services
                                  Community Facilities                    ICT
                                  Libraries & Galleries                   Procurement & Fleet
                                  Local Laws                              Property
                                  Waste & Environmental Health            Revenue Services

   Executive Services         x   Environment & Sustainable Development   Infrastructure Services
   Director                       Director                                Director
   Community Engagement           Building & Plumbing Services            Asset Management
   Customer Service           x   Development Assessment                  Buildings and Facilities
   Governance                     Economic Development                    Civil Operations
   People and Culture             Environmental Services                  Disaster Management
                                  Strategic Land Use Planning             Infrastructure Planning,
                                                                          Design and Delivery




                                                                                       Page 57 of 90

Section 58

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          9 APRIL 2019



                         CONFIDENTIALITY OF THIS ITEM WAS REMOVED –
                                         4 JUNE 2019
CLOSED SESSION
6                         ENVIRONMENT LEVY POTENTIAL
                          LAND ACQUISITION - LOT 3 RP186809
DOCUMENT INFORM AT ION




Author                              Principal Environment Officer, Peter Milne
                                    Environment and Sustainable Development Department

Index                               ECM/ Subject/ Environment Levy

Attachments                         1.    Conservation Evaluation Report (1999)
                                    2.    Bugler Francis Valuation



REASON FOR CLOSED SESSION
This report was considered in closed session in accordance with Section 275 (1) of the Local Government
Regulation 2012, which permits the meeting to be closed to the public for business relating to the
following:
(e)                        Contracts proposed to be made by it.




                                                                                         Page 58 of 90

Section 59

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   9 APRIL 2019


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Principal Environment Officer to the Planning & Environment
Committee Meeting dated 9 April 2019 and:
A.   Authorise the Chief Executive Officer to negotiate the purchase of Lot 3 RP186809 based
     on the valuation obtained by Council; and
B.   Remove the confidentiality in relation to this report upon the signing of a contract to
     purchase Lot 3 RP186809.



REPORT
The Environment Levy Policy provides for the acquisition of environmentally significant land. The
Conservation Land Guideline was adopted by Council in September 2018 and provides a
methodology for identifying suitable land parcels for acquisition. The criteria for suitable land
parcels are:
   30ha or more;
   Have connectivity with Core Protected Areas including National Park and/or Bushland
     Reserve; and
   Have high biodiversity value.

1.   Environmental values

1675 Louis Bazzo Drive, Boreen Point, (3RP186809) is currently for sale for $425,000 and meets
the criteria under the Environment Levy Policy and the Conservation Land Guideline:
   Size of land parcel: 51.53ha
   Connectivity: The property has direct connectivity with Lake Cootharaba Bushland
     Reserve, on the shores of Lake Cootharaba. The Noosa River and lakes are considered
     part of the Noosa-Cooloola Core Protected Area. Purchase of this land would essentially
     extend the Lake Cootharaba Bushland Reserve, while the parcel also helps provide
     connectivity between Yurol-Ringtail State Forest and Cooloola National Park (see Map 1).
   Biodiversity value: The property has mapped ‘Of Concern’ vegetation (Regional
     Ecosystem 12.3.11 Eucalyptus tereticornis, Eucalyptus siderophloia and Corymbia
     intermedia), which is potential koala habitat (see Photo 1 & 2). Eucalyptus robusta was
     recorded at the site which is also an important koala food source. The land also has
     Regional Ecosystem 12.3.5 Melaleuca wetlands. Although classified as Least Concern,
     wetlands provide important recharge areas for groundwater and help maintain the water
     quality for the Noosa River. The land parcel has been on previous Council acquisition lists
     and a comprehensive environmental assessment was undertaken in 1999 (Attachment 1).




                                                                                  Page 59 of 90

Section 60

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                           9 APRIL 2019




Map 1. 1675 Louis Bazzo Drive, Boreen Point, has direct connectivity with Lake Cootharaba Bushland Reserve
             and could potentially help link Yurol-Ringtail State Forest to Cooloola National Park.




Photo 1 Koala food trees

                                                                          Photo 2 Habitat tree with hollows




                                                                                          Page 60 of 90

Section 61

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  9 APRIL 2019


2.   Noosa Plan

Under the Noosa Plan 3RP186809 is zoned Rural and is covered by the overlays shown below:




                     Map 2. Biodiversity Overlay-Environmental Protection Area




                                   Map 3. Flood hazard Overlay

                                                                                 Page 61 of 90

Section 62

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              9 APRIL 2019




                Map 4. Bushfire Overlay-High potential bushfire intensity




                Map 5. Koala Habitat Overlay-largely remnant koala habitat


                                                                             Page 62 of 90

Section 63

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     9 APRIL 2019


3.   Climate change considerations

Council now has new climate change mapping which identifies lands that are preferred
biodiversity retreat areas. These are areas where ecosystems can adapt under climate change
sea level rise scenarios. 3RP186809 is included as a biodiversity retreat area under these maps
(see Map 6 areas coloured in blue to the west of Boreen Point)




                          Map 6. Biodiversity climate change adaptation areas

4.   Threats

Under the Noosa Plan 3RP186809 is zoned as Rural and is covered by the Biodiversity Overlay.
There are exemptions for clearing of vegetation under this overlay including clearing for:
   A house site (up to 2000 metres square)
   Fire trails
   Timber for fencing and firewood
   Emergency services

Although there is an old house site to the west on the land parcel (see Map 7) it is quite possible
that a new landholder may prefer to build a house next to Louis Bazzo Drive because of its close
proximity to the Boreen Point township and ease of power connection. This would require
clearing of remnant vegetation and raising the ground levels with fill for a house site.




                                                                                    Page 63 of 90

Section 64

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                              9 APRIL 2019




     Map 7. Shows old house site and dam. The land parcel is in close proximity to Boreen Point Township.

5.     Conservation Land Guideline purchase options

The Environment Levy Policy and Conservation Land Guideline provides for two types of
acquisition. ‘Buy and hold’ or ‘Revolving fund’.

The advantages and disadvantages of each option for 3RP186809 is shown in Table 1 below:
Option           Advantages                     Disadvantages                   Notes
Buy and hold     Remains      in      public    Becomes a Council asset         Weeds such as umbrella
                 ownership    and     public    requiring management for        trees were recorded on
                 access would be allowed.       weeds, feral animals and        edges
                                                fire.
Revolving        Eventually comes under         Being private land, public      Potentially the land parcel
fund             private ownership with a       access would not be             could be subdivided for
                 Nature Refuge protection       allowed unless permitted by     park purposes and the
                 and doesn’t require Council    the landholder.                 house site area on-sold.
                 maintenance.                   A house site on western         This would allow continued
                 On the sale of the property,   side of land parcel would       public access through the
                 capital costs are recouped     need to be cleared of           Nature Refuge. However
                 for further EL purchases.      weeds and an access road        there are costs associated
                                                would     need     a    minor   with subdivision and on-
                                                upgrade        and      short   selling the entire Nature
                                                causeway crossing. (refer       refuge with a house area is
                                                to photo 1, 2 & 3). There is    preferred under a revolving
                                                no power connection to the      fund scenario. Being within
                                                house site but power lines      the flood hazard overlay a
                                                are 500m away.                  future house site would
                                                                                require raised floor levels
                                                If a house site was selected
                                                                                and access road, and/or
                                                on the eastern portion of
                                                                                pole house construction.
                                                land, clearing of vegetation
                                                and fill would be required.
                                                Selling costs such as
                                                agency fees and Nature
                                                Refuge processing.
                        Table 1. Advantages and disadvantages of purchasing options.



                                                                                             Page 64 of 90

Section 65

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                             9 APRIL 2019


The ELWG initially recommended that the land parcel be purchased as a ‘buy and hold’
proposition to avoid any house site vegetation clearing and selling costs under a revolving
scenario. A cost benefit analysis for a revolving fund transaction could be developed post
purchase to allow time for a thorough assessment and a report brought back to the ELWG and
Council.




 Photo 1. Access road to western house site has been gravelled previously and would need minor clearing of
                                 regrowth (i.e. for a revolving fund option).




Photo 2. Western house site overgrown with weeds,        Photo 3. Dam in front of western house site.
mostly Lantana and Setaria.


                                                                                            Page 65 of 90

Section 66

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      9 APRIL 2019


Previous Council Consideration

Ordinary Meeting Minutes, 20 September 2018, Item 3, Page 13
That Council note the report by the Principal Environment Officer to the Planning & Environment
Committee Meeting dated 11 September 2018 and adopt:
A.   The Conservation Land Guideline provided at Attachment 1 to the report which provides a
     mapping methodology to support the Environment Levy Land Acquisition Program and
     Private Landholder Conservation Partnerships Programs, with minor changes as
     authorised by the CEO;
B.   The Revolving Fund Guideline provided at Attachment 2 to the report which provides a
     framework to implement a revolving fund, with minor changes as authorised by the CEO;
C.   The Private LandConservation Guideline provided at Attachment 3 to the report to guide
     the Voluntary Conservation Agreement (VCA) and Land for Wildlife (LfW) Programs, with
     minor changes as authorised by the CEO; and
D.   The Fact Sheet - Conserving Land in Noosa Shire provided at Attachment 4 to the report.


Finance
A valuation was undertaken by Bugler Francis Valuers (Attachment 2). The property has been
valued between $400,000 to $450,000, with an estimate of $425,000 (which is the same as the
asking price).

By comparison the most recent Environment Levy purchases of Johns Landing and Cooloothin
Creek were much more expensive to purchase having direct river frontage and higher ground.
Prices are summarised in Table 2.

EL Land parcel                   Purchase cost                    Price per ha
Johns Landing                    $2.2m                            $44,900/ha
Cooloothin Creek                 $2.7m                            $25,470/ha
1675 Louis Bazzo                 $425,000                         $8,250/ha

The restricted cash reserves of the Environment Levy are forecast to be $1.8 million by 30 June
2019 based on the current budget forecasts. This indicates that there is sufficient capacity to
purchase the land parcel using Environment Levy funds without impacting the delivery of current
environmental programs and still retaining a surplus of reserves for utilisation in future years.

It is proposed that, should Council proceed with the recommendation, an allocation of $425,000
be set aside in the capital works program for the purchase at Budget Review 3 (BR3).

Risks & Opportunities
There is a risk that if Council does not purchase the land, a new landholder will clear vegetation
and fill a portion of the land for a house site on the eastern side of the parcel.

If Council purchases the land there is inherent risks of bushfire similar to other bushland reserves
and ongoing weed maintenance requirements.

By purchasing this land there is an opportunity to help consolidate a linkage between Yurol-
Ringtail State Forest and Cooloola National Park.




                                                                                     Page 66 of 90

Section 67

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                            9 APRIL 2019


Consultation
External Consultation - Community & Stakeholder
Bugler Francis Valuers
Internal Consultation
The Environment Levy Working Group met on 7 March 2019 and recommended Council
consideration for the purchase of 3RP186809 under the Environment Levy program.

Departments/Sections Consulted:

x   Chief Executive Officer       Community Services                      x   Corporate Services
    Executive Officer             Director                                    Director
    Executive Support             Community Development                   x   Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                              x   Property
                                  Waste & Environmental Health                Revenue Services

    Executive Services        x   Environment & Sustainable Development       Infrastructure Services
    Director                  x   Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service          x   Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture        x   Environmental Services                      Disaster Management
                              x   Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 67 of 90

Section 68

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA     9 APRIL 2019


                                                  ATTACHMENT 1




                                                    Page 68 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA             9 APRIL 2019

                                                          ATTACHMENT 1
  "|.   le ° st

              CONSERVATION EVALUATION REPORT

                           Lot 3 RP 186809
                        1675 Louis Bazzo Drive
                             Boreen Point

                 Author: Jacky Williams (B App. Eny Se) September 1999

                                     SCANNED
                                    REGISTERED

                                                            Page 68 of 90

Section 69

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 69 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 APRIL 2019

                                             2

    1, Property Description
    The property is situated in the Boreen Point locality and the property description is Lot 3
    RP 186809 1675 Louis Bazzo Drive, Boreen Point. The property owner is Monika Frank.
    There are no dwellings on the site. Map | indicates the cadastral boundaries and the sites
    of survey works. The property is approximately 51.5 hectares and is almost entirely
    covered in native vegetation.

    2. Methodology
    This Conservation Report is based on a site visit, a brief flora and fauna survey of two
    sites of the property, aerial photographic analysis and literature review.

    A brief field survey was conducted on September 13” 1999 after an initial visit to the
    property with the landholders and Noosa Council Environment Officer in August. The
    sites surveyed were after assessment of the aerial photography provided by Council.
    Floristics of each site and fauna (cither by calls, skats, tracks or sightings) were recorded.
    The two sites selected were based on demonstrating the different forest types present on
    site and also accessibility of other sites was difficult, and time and money constraints
    limited the scope of fieldwork. An accurate fauna and flora survey would entail weeks of
    work conducted at differing times of the day and night and would require a number of
    field scientists. This survey was conducted in the late hours of the morning hence a great
    deal of fauna is not captured. Habitat assessment of the forest types present on the site
    can provide an indication of potential fauna capability. The age of the vegetation was
    estimated to be approximately 40 to 50 years old, and there are present small hollows,
    fallen logs and a developed structural forest that provides a viable habitat potential for
    many native fauna species.

    The aerial photography demonstrated a number of different textures indicating a change
    of vegetation community, however from site assessment this change would is more

                                                                                       Page 69 of 90

Section 70

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 70 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         9 APRIL 2019

                                              3

    present in understorey composition and the site is heavily dominated with a Melaleuca
    quinguenervia overstorey.

    3. Literature Review
    The property is categorized under the " Vegetation of Noosa Shire" Report 1995 as being:

    " Sub-type 4.2 Melaleuca quinguenervia with Wetland Understorey
    The variation in the fluctuating water table determines the length of the period during
    which these communities are waterlogged. Some sites have free water all year round (in
    years of average or greater rainfall), whilst other sites are flooded for only certain parts of
    the year. The factor they share in common is the regular and prolonged inundation which
    results in the understorey of these forests being dominated by wetland plant species
    {Appendix 2, Site #019). This is in contrast to the other Melaleuca forest which has a
    more variable understorey and less frequent and regular history of inundation. Melaleuca
    guinguenervia dominates the canopy with only infrequent occurrence of other species
    such as Eucalyptus robusta, E.tereticornis and Lophostemon suaveolens. These latter two
    species are more commonly found in the drier Melaleuca communities. Members of the
    Cyperaceae and Restionaceae are common elements of the understorey of these regularly
    flooded forests, Ferns may be locally abundant and form a diagnostic understorey on
    some sites with Blechnum cartilagineum, a species which has substantial cultural
    significance to Aboriginal peoples. Land filling and drainage practices have probably
    destroyed many of these Me/aleuca communities outside the Crown estate.

    The Melaleuca communities would appear to be one of the most threatened habitat types
    remaining on the coastal plain. Their former extent is now difficult to comprehend, as
    detailed historical distributions for this Vegetation Type are not readily available. To
    ascertain the location of any remnants of this forest type would be a valuable exercise In
    order to determine whether or not any extent remnants retain the natural attributes of this
    community. Drainage and fire (often with associated grazing) usually results in the
    destruction of these communities, so the degraded or regenerating phase of this forest

                                                                                        Page 70 of 90

Section 71

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 71 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                            9 APRIL 2019

                                              4

    type is seldom found in the field. Where the source of degradation is less dramatic, such
    as eutrophication of the aquifer via nutrient pollution from surrounding land use
    practices, or alteration to the drainage patterns of the aquifer, the understorey of the
    community can become dominated by weed species such as Para Grass (Brachiaria
    mutica) and the canopy species exhibit progressive die-back. This scenario is repeated in
    many of the Melaleuca communities which are downstream of agricultural or pine
    plantation areas where nutrient pollution of the aquifer has occurred. "

    The Vegetation Community present on the property is best defined as Melaleuca
    quinguenervia tall open forest to tall woodland, The Forest Assessment Unit and
    Queensland Herbarium Department of Environment have mapped and classified this
    regional ecosystem in South East Queensland in the project "Forest Ecosystems Mapping
    and Analysis " as part of the Queensland CRA/RFA process.
    This vegetation community is classified as vulnerable, and results of this survey indicate
    that the extent preclearing of this vegetation community was 51,000 ha, and the current
    extent is 18,500ha. 7% of this vegetation community is in protected areas and 2% in State
    Forests. Further to this the effects of clearing between 1995-1997 indicate a loss of 700
    hectares (or 3.6% of 1995 area} during this period.
    The Vegetation Community described in the Forest Ecosystem Mapping and Analysis
    report is as follows:
    Regional ecosystem 12.3.5
    Description: Melaleuca guinguenervia tall open forest to tall woodland on Cainozoic
    alluvial plains in coastal areas. Understorey depends upon duration of waterlogging with
    sedges and ferns especially Blechmum indicum in wetter microhabitats and grasses and
    shrubs in drier microhabitats. Other tree species that may be present as scattered
    individuals or clumps include Lophostemon suaveolens, Eucalyptus robusta,
    E. tereticornis, Corymibia intermedia, Livistona australis, Endiandra sieberi. Melastoma
    affine and Glochidion sumatranum and Euodia elleryana are often in understorey.
    Provinces: 4, 8, 10.

                                                                                           Page 71 of 90

Section 72

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 72 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 APRIL 2019

                                               5

     Protected areas: Burrum Coast NP (1000ha), Great Sandy NP (2700ha); also in
     protected areas <1000ha.
      Extent reserved: Medium.
      Special ecological values: Habitat for rare and threatened flora species including Phaius
     australis and P. tancarvilleae.
      Comments; Extensively cleared for sugar cane and urban development in south of
     bioregion. Tallest stands associated with estuarine sediments.
      Subject to weed invasion especially groundse! Baccharis halimifolia. Data on clearing
     rate between 1995-97 indicate that the RE continues to experience an annual loss in
     excess of 1% of current extent per annumn, The area remaining is likely to fall below 30%
     within 5-10 years.
     Estimated extent: 36% remains of a preclearing area of about 51 000ha.
     Conservation status: Vulnerable.

     Regional ecosystems have been assessed using JANIS (1997) criteria to determine
     whether they are endangered or vulnerable. An endangered RE is defined thus:
     “ An endangered ecosystem is one where its distribution has contracted to less than 10%
     of its former range or the total area has contracted to less than 10% of its former area, or
     where 90% of its area is in small patches which are subject to threatening processes and
     unlikely to persist”.
     A vulnerable ecosystem is one which is:
     “j) approaching a reduction in areal extent of 70% within a bioregional context and
     which remains subject to threatening processes; or
      ii) not depleted but subject to continuing and significant threatening processes which
     may reduce its extent.”

      4, Field Survey data
      Field data collected from the site follows this brief discussion. There is presently a heavy
      occurrence of groundsel in the understorey of areas in and adjoining Site 1, however in
      some areas this is being superceded by other native pioneer species. Management of the

                                                                                       Page 72 of 90

Section 73

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 73 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       9 APRIL 2019

                                            6

   groundsel especially during flowering season would be required to assist with facilitation
   of succession by native species. Introduced Cassia is also a problem on site, and this
   would need to be managed to avoid future infestation through the remnant. Site 1 had a
   different overstorey from the rest of the site with Eucalyptus tereticornis and
   Lophostemon suavelons more dominant. The under and midstorey also has more drier
   species present. Eucalyptus robusta was not recorded at either site and the understorey
   appears to be dependent on soil type and waterlogging. Site 2 is dominated by
   Melaleuca overstorey and has rainforest and vine species present, with some rainforest
   species occurring in the upper canopy. There is a small lantana problem at the edge of the
   forest at the road reserve and management of the road reserve is an issue that will need to
   be considered to avoid degradation of the site. The property in general consists of a large
   plain of tall Melaleuca forest with a variety of understorey consisting of sedges, ferns,
   palms, vines, banksias and rainforest species. There is a large quantity of fallen logs and
   ferns, mosses and lichens are abundant. The species diversity in the understorey is
   extremely diverse and a key feature of the site. If purchased by Council the site would
   lend itself to having an education facility or boardwalk based on wetlands. Potential
   partnerships could be forged with education bodies such as Sunshine Coast University,
   Education Queensland and CSIT.

   FLORA AND FAUNA SPECIES LIST

   SITE 1 (21 native species)

   Scientific Name                           Common Name
   Jacksonia scoparia                        Dogwood
   Acacia aulacocarpa                        Brush Ironbark Wattle *
   Acacia melanoxylon                        Blackwood *
   Acacia maidenii                           Maiden's wattle *
   Eucalyptus tereticornis                   Forest Red Gum or Blue Gum
   Melaleuca quinquenervia                   Paperbarked Tea Tree

                                                                                      Page 73 of 90

Section 74

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 74 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     9 APRIL 2019

                                            7

     Lophostemon suaveolens                  Swamp Box    *
     Commersonia bartramia                   Brown Kurrajong
     Glochidon sumatranum                    Umbrella Cheese Tree
     Glochidon ferdinandi                    Cheese tree
     Elaeocarpus obovatus                    Hard Quandong *
     Symplocos thwaitesii                    White Hazelwood *
     Smilax australis                        Barbed wire vine *
     Alphitonia excelsa                      Red Ash*
     Banksia robur                           Swamp Banksia
     Livistona australis                     Cabbage palm
     Cupaniopsis parviflora                  Small leaved Tuckeroo
     Lomandra longifolia                     Long leaved Mat rush
     Cordyline rubra                         Red fruited lilly pilly *
     Hibbertia scandens                      Twining Guinea flower *
     Hibiscus diversifolius                  Swamp Hibiscus

     Weeds present
     Baccharis halimifolia                   Groundsel
     Cassia coluteocides                     Winter Senna

     Evidence of Fauna ( by sight, call, skats and tracks)

     Birds
     Pachycephala pectoralis                       Golden Whistler
     Pachycephala rufiventris                      Rufous Whistler
     Myzomela sanguinolenta                        Scarlet Honeyeater
     Myzomela obscura                              Dusky Honeyeater
     Eopsaltria australis                          Eastern Yellow Robin
     Zosterops lateralis                           Silver eye

                                                                                    Page 74 of 90

Section 75

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 75 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   9 APRIL 2019

                                            8

     Psophodes olivaceus                           Eastern Whipbird
     Meliphaga lewinii                             Lewin's honeyeater
     Alectura lathami                              Scrub Turkey

     Mammals

     Wallabia bicolor                              Swamp Wallaby
     Isodon macrourus                              Brown Bandicoot
     Macropus giganteus                            Eastern Grey Kangaroo

     (The introduced Brown hare skats were found on site)

     Monotremes

     Tachyglossus aculeatus                        Echidna

     SITE 2 { 43 native species)

     Scientific Name                         Common Name
     Asplenium australascium                 Crows Nest Fern
     Acacia aulacocarpa                      Brush Ironbark Wattle
     Acacia maidenii                         Maiden's wattle
     Acacia melanoxylon                     Blackwood
     Polyalthia nitidissima                  Polyalthia
     Polyscias elegans                       Celery wood
     Notelea longifolia                      Large mock olive
     Lophostemon suaveolens                  Swamp Box
     Clerodendrum floribundum                Smooth Clerodendrum
     Alyxia ruscifolia                       Prickly Alyxia

                                                                                  Page 75 of 90

Section 76

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 76 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   9 APRIL 2019

                                             9

      Endiandra sieberi                      Hard corkwood
      Denhamia celastroides                  Denhamia
      Zieria smithii                         Sandfly zieria
      Alphitonia excelsa                     Red Ash
      Acmena smithii                         Lilly Pilly
      Corymbia intermedia                    Bloodwood
      Wilkea huegeliana                      Veiny wilkea
      Duboisia myoporoides                   Corkwood
      Elaeocarpus obovatus                   Hard Quandong
      Elaeocarpus reticulatus                Blueberry Ash
      Acronychia wilcoxiana                  Lemon Aspen
      Symplocos thwaitesii                   White Hazelwood
      Dianella caerulea                      Common Flax Lilly
      Euodia elleryana                       Euodia
      Cordyline rubra                        Red fruited palm lilly
      Melaleuca quinquenervia                Paperbarked Tea Tree
      Guioa acutifolia                       Northern Guioa
      Guioa semiglauca                       Guioa
      Cryptocarya glaucescens                Jackwood
      Lygodium microphyllum                  Climbing Fern
      Smilax australis                       Barbed wire vine
      Flagellaria indica                     Whip vine
      Cissus antartica                       Water vine
      Cissus hypoglauca                      Five-leaf water vine
      Hibbertia scandens                     Twining Guinea flower
      Sacropetalum harveyanum                Pearl vine
      Blechnum cartilagineum                 Gristle ferm
      4 Cyperaceae species                   2 species of Gahnia and 2 species of
                                             water reeds/sedges

                                                                                  Page 76 of 90

Section 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 77 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       9 APRIL 2019

                                              LO

     Millettia australis                       Blunt Wisteria

     Weeds present
    Lantana camara                             Lantana

     Evidence of Fauna (by sight, call, skats and tracks)

    Birds
    Eopsaitria australis                       Eastern yellow robin
    Cuculus saturatus                          Oriental cuckoo
    Chenonetta jubata                          Australian Wood duck
    Rhipidura fuliginosa                       Grey fantail
    Monarcha frater                            Black faced Monarch

    5. Wildlife corridor linkages
    The site is predominantly vegetated and has adjoining properties with significant
    vegetation being both freehold and crown lands. The site is part then of a wildlife corridor
    network and provides a significant area of habitat to facilitate genetic diversity.
    The road is a management issue for fauna as this intersects the corridor to the lake and
    adjoining crown lands to the south of the property. The site at present is a section of a
    large viable remnant that provides habitat and linkages between other remnants. The
    property forms part of a wildlife corridor that links crown lands to the National Park. This
    linkage provides access to Lake Cootharaba and to the Cooloola National Park. The
    continued viability of this site will be dependent on future management of adjoining lands
    and the implementation of vegetation controls on private lands. This vegetation
    community is a known food source for the grey headed and common blossom bats, with
    the Eucalyptus tereticornis being food source for both the Koala and Yellow-bellied
    Glider.

                                                                                      Page 77 of 90

Section 78

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 78 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      9 APRIL 2019

                                              i

     6. Aboriginal cultural significance
     As previously identified in the Noosa Council Vegetation Report the site could have
     aboriginal cultural significance and the local Aboriginal custodians need to be contacted
     and involved with the management of the property if identified as a cultural site.

     7. Recommendations
     The site is identified as housing a Vulnerable Ecosystem identified by the Forest
     Ecosystem Mapping and Analysis Project which is the most up to date assessment of
     vegetation communities in the region. This alone provides a basis that the site has merit
     for purchase as a Conservation Reserve. The site also provides an important linkage
     between crown lands and the National Park, which assists with the facilitation of genetic
     diversity of our native flora and fauna.
     Further survey works are required as the site could house rare ad threatened flora and
     fauna species and ] would like to recommend that the site be nominated for any fauna
     studies that are to be conducted in the future by Noosa Council and Noosa River
     Catchment Co-ordinating Committee.

                                                                                     Page 78 of 90

Section 79

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 79 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 9 APRIL 2019

                                             12

       8. References
       Queensland CRA/RFA Steering Committee 1997 Draft Systematic Vertebrate Fauna
       Survey Project Queensland Government
       Noosa Council 1995 Vegetation of Noosa Shire A Planning Scheme Review Project
       Noosa Council
       Queensland CRA/RFA Steering Committee 1998 Forest Ecosystems Mapping and
       Analysis Queensland Government

                                                                                Page 79 of 90

Section 80

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 80 of 90

vu
                                                                                                                                     rm
                                       ATTACHMENT: MAP 1 OF BOREEN POINT PROPERTY CONSERVATION REPORT                                7
                                                                                                                                     =
                                                                                                                                     z
                                                                                                                                     Gq)
                              =  ~ . —                                Ts                                                             Qo
                                                                                                                                     m
                                                                                                                                     =
                          |                                                                                                          <
                          |                                                                                                          zw
                          fp                                                                                                         Oo
                          }                 ie   ee                                                                     G            =
                                                   ————                                                                              m
                          |                                 oo                                                                       =
                          |                                         ae                                                               =i
                          |                                                        ae                               a                Q
                          |                                                                   he                                     oO
                          |                                                                             oe            °              =
                          |                 Oxsite |                                                            oe                   =
                                                                                                                 °     ~.
                          |                               L3RP186809 1675 Louis Bazzo                           °                    m
                                                          Drive, Boreen Point                                                        =
                                                                                                                   —                 m
                                                                        ®                                                            m
                                                                                                                                     a
                                            ~                                                                                        z
                          }                                                                                      7                   q
                          }                         .                                                                   _            >
                                                        :                                                                            )
                                                                 7                                                                   2
                                                                   ~.,                                                                Oo
                                                                                                                                     >

                                                                                .                      SITE 2   Oo

                                                        °
                                                                                                                           |
S                                                                                                                                    ©
                                                                                                                                     >
e                                                                                                                                    U
©                                                                                                                                    vv
°                                                                                                                                    r
°                                                                                                                                    8
 Oo                                                                                                                                  —_
 So                                                                                                                                  o

Section 81

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA     9 APRIL 2019


                                                  ATTACHMENT 2




                                                    Page 81 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                9 APRIL 2019

-                                                                           ATTACHMENT 2

    Lancelyn Pty. Ltd. ABN 41 010 865 273 T/A
                                                                       P.O. Box 232
    BUGLER FRANCIS VALUERS                        A      | aeaaeyart  NOOSA HEADS Q 4567
                                                 J         aeeTenaans  Phone: (07) 5447 4911
                                                 EE site               Email: [email protected]

                                         VALUATION OF

                                     1675 LOUIS BAZZO DRIVE
                                     BOREEN POINT QLD 4565

                                              FOR

                                      NOOSA SHIRE COUNCIL
                                           PO BOX 141
                                       TEWANTIN QLD 4565

                   ;   *               ey ee           SPOS     :

                  oe           oc.                vt.            |        *
                       ‘3     ‘       ?   Tone

                   4                                   ey              te  “
                                           oe                         3

                                          VALUATION

                                            $425,000

                                       INSPECTION DATE

                                         21 MARCH 2019

                                         REPORT DATE

                                         22 MARCH 2019

                                                                               Page 81 of 90

Section 82

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 82 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                            9 APRIL 2019

                                                  -2?-

    INSTRUCTIONS           To ascertain the “market value” of the subject property as at the date of
                           inspection, subject to the definitions and conditions set out in the valuation
                           addendum attached.

    REGISTERED
    OWNER/S                Sundale Ltd

    REAL PROPERTY
    DESCRIPTION            Lot 3 on Registered Plan 186809
                            County of March, Parish of Noosa

    LAND AREA               51.53 Hectares

    ZONING                 Rural

    SITE VALUE             Department of Natural Resources, Mines and Energy.
                           $350,000 as at 30/06/2018

    SERVICES/ROADS         Electricity and telephone available for connection. Bitumen sealed road.

    ACCESS                 Average

    LOCATION               Boreen Point on the western shores of Lake Cootharaba approximately
                           20 kilometres north west of Tewantin in the Noosa Hinterland

    SITE DESCRIPTION       An irregular shaped parcel of land which is mostly low lying and flood
                            prone. It consists of heavily timbered forest regrowth and melaluca wetlands,
                           A lagoon is located near the western boundary and a possible slightly elevated
                            House site is available nearby however the access is difficult with the unformed
                            Cootharaba Downs Road the frontage. The frontage to Louis Bazzo Drive is
                           Approximately 552 metres.

    IMPROVEMENTS            Nil

                                                                                           Page 82 of 90

Section 83

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 83 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         9 APRIL 2019

                                                -3-

 ENVIRONMENTAL
 ISSUES                   Contamination
                          The subject existing and past land use indicates that contamination is
                          UNLIKELY.
                          We are not contaminated land experts and cannot confirm ff the site is
                          contaminated or otherwise.

                          Flooding Hazard
                          The land IS located in a flood hazard area.

                          Landslide Hazard

                          The land IS NOT located in a landslide hazard area.

                          Bushfire Hazard

                          The land IS located in a medium bushfire hazard area.

                          Biodiversity
                          The land IS located in an environmental! protection area.
                          The land IS NOT located in an environmental enhancement area.

                          Acid Sulphate
                          The land IS located in an acid sulphate area.
                          The potential hazard is ...HIGH...

                                                                                        Page 83 of 90

Section 84

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 84 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               9 APRIL 2019

                                   4.

         >             a’

               Ls %
               ,   B      :   ———      a
     at             ae                           a
              es os eee Ke                        "
       a.      ead  es Se                         ———
      Pope te    Aas ot                                ~
   eee Bigs i,                                 |
    es Same         Epa
         ert          METH,
       Bl era     Bese
   Pispeseny lee a   Feige be et erent
   OLS                  OTE  ISN,

                 “View south along Louis Bazzo Drive frontage”

   t                             “4
    7"   aha                       bi 7 yy                        1
                                    * ca     .                     7

                “View north along Louis Bazzo Drive frontage

                                                                              Page 84 of 90

Section 85

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 85 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    9 APRIL 2019

                                     Sp

     ea  Tae      iy  BY    Seine 4 Paine     ae     hat     ear
      eh          “Gh     k wie    ’    a    Fog             wy
    Seder’ Yip.    5                   Oe pe     ee    ae
          J      Sift eae   e            4   Pagpear’..  :
            CP      eee    tek      te              a    Na
         A 4 heey k, ie : ; =      4  oy:           RR       FE .
             rs                     os                   |
               tal       alae.   Leg jap                     Oe eae

      eS                   en,   et       REE      at        :
      -   be a       as     a  am      = ie |      4           3
                  =   Are               Le eae 2                :
           Wa       ai        Rae      eee   ee
            \  ‘ ares oN      oe    oP os      ae:  ny
       \       BS    \e beat    WP   TAG:
          :         NZ
                             ““Atypical vegetation”

                                  ”                  A r           ag

    +e
    a            : :  a
    :   ’ v"   eles ‘ oe aa
       eae aca Fie                                     “te
    - ey         a)  * ;    ira!                                     ane

                      “Unformed Cootharaba Downs Road

                                                                                   Page 85 of 90

Section 86

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 86 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   9 APRIL 2019

                                            -6-

  SALES EVIDENCE        Sale 1                 20 JUNE 2016

                        55 Lake Flat Road, Boreen Point. Lot 7 on SP 109944 40.51 Ha

                        A large habitable shed on an elevated house site.

                        Sold for $388,000

                        Adjoining allotment consisting of heavily timbered low lying flood prone land.
                        Land content assessed at $8,000/ha. Considered the most comparable sale

                        Sale 2                 21 AUGUST 2017

                        104-196 Burtons Road, Maroochy River. Lot 2 on SP 269537 43.54 Ha

                       An irregular shaped generally level partly cleared allotment.

                       Sold for $450,000

                        Former flood prone part cane land allotment with a house site. Land content
                       assessed at $10,335/Ha

                        Sale 3                 30 OCTOBER 2018

                       90 Eastern Branch Road, Kin Kin. Lot 3 on RP 164586 45.38 Ha.

                       A Timber and metal roof Queenslander with a machinery shed

                       Sold for $601,000

                        Superior quality useable land assessed at $11,018/ha

                                                                                  Page 86 of 90

Section 87

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 87 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                          9 APRIL 2019

                           -7-

       Sale 4                 25 AUGUST 2018

       327 Eastern Branch Road Kin Kin. Lot 2 on RP 65204 32.42 Ha

       A timber and metal roof Queensland with sheds.

       Sold for $570,000

       Superior quality mostly improved pasture assessed at $13,880/Ha

       Sale 5                  24 MAY 2018

       54-64 Dynes Road, Valdora Qld. Lot 30n SP 277877 49.18 Ha

       An irregular shaped generally level flood prone allotment.

       Sold for $682,500

       Cleared flood prone former Cane land assessed at $13,877/ha.

                                                                         Page 87 of 90

Section 88

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 88 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        9 APRIL 2019

                                              -8-

 COMMENTS               The subject property comprises a 51.51 Hectare parcel of heavily timbered low
                         lying flood prone land within 600 metres of the Boreen Point Village and Lake
                        Cootharaba in the Noosa Hinterland. In our opinion in the current market
                        conditions and having regard to limited recent recorded sales evidence of similar
                        size parcels of land and the subject topography we consider a range of
                        $400,000 to $450,000 indicative.

  VALUATION             WE VALUE 1675 LOUIS BAZZO DRIVE, BOREEN POINT QLD 4565 AS
                         FOLLOWS

                                               $425,000 ($8,247/ha)

                          (FOUR HUNDRED AND TWENTY FIVE THOUSAND DOLLARS)

                          laa
                                 a        i

                        Warren Walker AAPI
                        Certified Practising Valuer/Registration No.1828.

                                                                                 Our Ref: 19-08

                                                                                       Page 88 of 90

Section 89

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 89 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     9 APRIL 2019

                                    VALUATION ADDENDUM

  Market Value

  “Market Value” is defined as “The estimated amount for which an asset should exchange on the date of
 valuation between a willing buyer and a willing seller in an arm's length transaction after proper marketing
  wherein the parties had each acted knowledgeably, prudently and without compulsion”.

  Easements/Encumbrances
 The title deed has not been searched to venfy if any encumbrance or easement exists. This valuation is
  assessed on the title being free from any encumbrance or easement other than a registered mortgage.

  Improvements
  Nil
  Basis of Valuation

  We have assessed our valuation on the basis of Freehold Title with vacant possession. Our valuation is
  determined on the basis that the property, the title thereto and its use is not affected by any other matter
 than that mentioned in this report. Specifically, we have assumed that the property is not affected by
  financial liens of any nature.
  We have neither undertaken, requested, nor sighted the following:
  ®* Detailed Title Search or a photocopy of the Certificate of Title:
  =  Written Town Planning Certificate:
  =  Identification Survey by a Licensed Surveyor,
  =  Queensland Transport Roads Search;
  =  Written Flood Search;

                                                                                    Page 89 of 90

Section 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   9 APRIL 2019




                                                  Page 90 of 90

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      9 APRIL 2019

    ®  Soil Survey;
    =  Weare not Contaminated Land Experts;
    =  A-search of the Contaminated Land Register has not been made;
    =  We have assumed the land is free from contamination for valuation purposes.
    NOTE: Any comments on these issues are based on observations on site and, where necessary,
    appropriate verbal inquiry without the benefit of searches, surveys etc. The valuer reserves the right to
   review the valuation and the report if searches and inquiries reveal contrary conditions or matters not
    addressed herein.

    Disclaimers
    Third Party This valuation is for the use only of the party to whom it is addressed and for no other
    purpose. No responsibility is accepted to any third party who may use or rely on the whole or any part of
    the content of this valuation.
    Market Movement This valuation is current as at the date of valuation only. The value
    assessed herein may change significantly and unexpectedly over a relatively short period
    {including as a result of general market movements or factors specific to the particular property).
    We do not accept liability for losses arising from such subsequent changes in value. Without
    limiting the generality of the above comment, we do not assume any responsibility or accept any
    liability where this valuation is relied upon after the expiration of three months from the date of
    the valuation, or such earlier date if you become aware of any factors that have any effect of the
    valuation.

    Private Lending No responsibility is accepted to any party associated with solicitor arranged mortgages.

                                                                                     Page 90 of 90

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.