PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 APRIL 2019
2. SITE DETAILS
2.1. Background
The site was previously used by Sunrise Engineering and Welding. Part of the site was also
utilised by the adjoining bus depot for access and parking. Refer to Figure 2 – Existing shed.
Figure 2 – Existing Shed
2.2. Site Description
The site has a 21 metre frontage to Project Avenue, with access to the site at the south western
corner of the site. The site is relatively flat and existing on-site parking is informal, with no line
marking. Refer Figure 3 – Subject site.
Figure 3 – Subject site
Page 27 of 90
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.