Original source · versioned page text
2019-04-09 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 APRIL 2019
8. The proposal is contrary to the Overall Outcomes for the Eastern Beaches Locality as it
does not protect the dunal area and natural environment nor maintain the safety of people
and works.
The applicant subsequently appealed the decision stating that the application should be
approved subject to reasonable and relevant conditions.
It is in order for Council to defend the appeal and the recommendation is worded accordingly.
Previous Council Consideration
Ordinary Meeting Minutes, 20 December 2018, Item 1, Page 12
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 11 December 2018 regarding Application No. 51987.2951.01 to make
a minor change to an existing approval for additions to a detached house to include a swimming
pool, deck and other structures seaward of the coastal building line situated at 42 Seaview Tce,
Sunshine Beach and:
A. Refuse the change for the following reasons:
1. The proposal is in conflict with the assessment benchmarks of the State Planning
Policy as it proposes development in an Erosion Prone Area and Natural Hazard
Area.
2. Development seaward of the Coastal Building Line is contrary to the building
setbacks contained in the Planning Scheme and the setback provided under State
Code 8; Coastal Development and Tidal Works of the State development assessment
provisions.
3. Recent modelling carried out by the Council indicates significant erosion is likely to
occur in the future which may threaten life and property should the proposed
development proceed.
4. The proposal does not comply with the Planning Scheme in force at the time of the
original approval, given the extent of excavation and vegetation removal in a sand
dune area.
5. The proposal does not comply with the Natural Resources Overlay Code for Coastal
Protection as it has the potential to adversely impact on natural coastal processes.
6. Given the site is affected by the Coastal Building Line and is located in a highly
vulnerable erosion prone area, the proposed 6m setback is not sufficient to minimise
the risk of erosion.
7. The proposal does not comply with the Biodiversity Overlay Code as vegetation is
proposed to be removed within the Environmental Protection Overlay placing the
integrity and resilience of the foreshore at risk.
8. The proposal is contrary to the Overall Outcomes for the Eastern Beaches Locality as
it does not protect the dunal area and natural environment nor maintain the safety of
people and works.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Finance & Risk
It is premature at this stage to provide advice on the likely prospects of the appeal. There will be
costs associated with defending the appeal.
Page 56 of 90
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.