QDijetties

8 March 2008

Attn: Ms Trish Sweeney
Sunshine Cost Regional Council
Noosa Branch

Assessment Division

P O Box 141

Tewantin Qld 4565

Dear Ms Sweeney,
Yr REF: 08/0530
RE: Pontoon Application

297 Gympie Terrace, Noosaville
(4494 Anchorage Apartments)

In reference to your letter of 27.3.08, please find attached —
e Additional fees
e (DAS Form 1 — Part P
e IDAS Form 1 — Part A

e IDAS Check List

e Application to DNR has been submitted and we will forward response to

you as soon as received.

Thank you for your assistance with this matter.
Sincerely,

cual

Jackie Hogan
Engineering Department

15 Jade Drive Nerang
PO Box 920 Nerang [t] +617 5594 8200

Queensland Australia 4211
Atlas Marine International Pty Ltd {f] +617 5594 8222 .

 

trading as Superior Jetties ACN 100 384 254 {e| [email protected] 7 | ;

www.superiorjetties.com ABN 94 100 384 254
Full text of the other 14 pages

Page 2

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

     
  

_Form 1 Development Application___

Part A

Common details

OTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.

'Appli icant details (The Applicant is the person responsible for making the application and need not be the owner of the tand. The Applicant is responsitte for ensuring the
information provided on the {OAS Application Form is correct. This information is relied upon by the Assessment Manager and any referral agencies when assessing and
ideciaing this application, By lodging this application, ihe Applicamt incurs the obligations and responsibilties prescribed by the IPA. Any development permit or proSminary
‘approval that may be issued as a consequence of this application wif be issued fo the Applicant.)

 

 

 

Company/organisation name (if applicable) [BODY CORPORATE - THE ANCHORAGE NOOSA |

 

Individual applicant/Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this form)

Title Firstname [APPROVALS COORDINATOR Lastname [SUPERIOR JETTIES

Postal address [PO BOX 920 NERANG QLD 4211

Contact telephone number [07 5594 8200 Mobile phone number [ti (wststi‘i‘zq
Facsimile number 07 5594 8244 e-mail address [email protected]

 

 

 

 

 

 

 

 

 

 

 

 

‘Details of the premises (2. the land on which the development is proposed - refer to the advice at the end of the form) / ]
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.

 

| Name of each local government area In which the mobile and temporary ERA is proposed to operate

| 1
OR

Table Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each Jot in a separate row.)

 

 

 

 

(CJ Street address / lot on plan for the premises (Appropriate for most applications including building appfications); OF

(i) [) Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water 0.g. jetty,
pontoon etc) Wrote Lofton plan details may be obtained from title documents, a ‘Rate’ notice, or from the focal goverment.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Unt | Sieet - Street Address Lot on —— Local government area (e.g. Logan,
No. | No. Street Name and offidal suburb/ocaily name —_| Post Code } Lot No. Plan Number Cairns}
1 297 | GYMPIE TERRACE NOOSAVILLE 4566 0 BUP7631 SUNSHINE COAST REGIONAL COUNCIL
AND/OR
Table C Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a Jot, in water (e.g. channel dredging in Moreton
Bay) etc.)
Coordinates q
(Note: place each set of coordinates in a separate row) Zone Datum Local government area
Easting Northing Latitude Longitude | Reference (if applicable)
1 LD depaga
(] wesea
(C) Other-

 

 

 

 

 

 

 

 

 

 

2. — Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)

Page 3

“7

 

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, fake, cana)

 

Name of water body, watercourse or aquifer {if known)

 

[1 [NoosARWER

 

Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on pian description for strategic port land Port Authority for the lot
[1

Table F Complete if the premises are in tidal water
Name of local government for the tidal area (if applicable) Name of port authority for the tidal area (if applicable)
| 1 SUNSHINE COAST REGIONAL COUNCIL

 

 

 

 

 

 

 

 

 

3. __ Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)

 

Total area of premises

 

21.70 Im? (Jhectares (Tick appicable unit)

 

 

 

 

 

—_ |

4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)

 

[1 [PRIVATE RESIDENCES |

 

5, — Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water efc.)?
® No oO Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application

 

‘Proposal details _ coe came mnt meen eae ie spe emme __ J
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, @ bore, aquacuiture)

 

PONTOON FOR PRIVATE APARTMENT USE

 

 

 

7. Does the poposal include new buildings or operational work (including any services) on the premises?
oO No 4 Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application

 

Resource entitlement (if applicable) - further information {s provided in the advice section at thie end of the form ad

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (0.9. the application
involves State land (leased and freehold), dectared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)

& No - Goto. Q9 oO Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitement must be submitted with the application. You do not need fo answer Q9 - go fo the next section.

sn ops, ny es 7

Owner's consent (ifapplicable)  - further information is is provided in (he advice section at the end of the form,

 

9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable,

 

 

 

Premises Owner's namel/s Details of the premises owned , . Date consent
Table H and postal address {street address or fot on plan description) Owners signature was obtained
BODY CORPORATE THE
1 ANCHORAGE NOOSA CTS | 297 GYMPIE TERRACE NOOSAVILEL 8.1.08
7632

 

 

 

 

 

 

 

 

 

* Owner's signature cannot be provided on the form if you intend to submit the application electronically, Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the [PA website .

fuse on i en a en a

‘Attachments and supporting information (Compete Table | - Use @ separate row for each type of attachment or information, including information requirod

‘under this Part} Please ensure aif documentation submitted with this form, including other: Parts of Form 1, or owner's consent, et ett, are securely at attached fa this Part of the Form,

PO RAE HE ce ae teat Hn IS Sn + seat sinetttlels stereo

 

 

 

Description of attachment or information
Table | (eg. Par € of Form 1. owner's consent, evidence of resource
aflocation/entifement, plans, drawings, reports}

1 OWNER'S CONSENT mail

Title (if anpicabla) Data Method of delivery to |
(e.g. General Authority James Street Traffic Report) assessment manager q

 

 

 

 

 

 

 

 

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

 

 

 

 

 

 

 

 

 

 

  

 

2 IDAS ASSESSMENT CHECKLIST mail
3 IDAS FORM 1 PART P mail
4 REGISTERED PLAN mail
5 ENGINEER CERTIFIED DRAWINGS mail
Portable Long Service Leave levy (Anplcabie for certain baiting and consnscton work valved over $80.0000my)

   

10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if applicable)
(7 the application seeks a preliminary approval only;

(X] the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);

(DZ all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(C1 the work is being carried out under an owner-builder permit issued under the Queens/and Building Services Authority Act 1991 -

Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.

11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
Dd No - End ofPart a
Ls Yes - Answer Q12 below

 

OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

. Receiving officer's Reference
Fee ($) Date received name numbers
sk A RAR memes Sink may
NOTIFICATION ¢ OF E ENGAGEMENT OF PRIVATE CERTIFIER . * . }
To: ‘auncil, | have been engaged as the private certifier for the building work referred to in this application.
Date of . . to nett “s at teat
engagement Name BSA Certification number Building classification/s

 

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

 

 

. Date receipted
oa . . ha ‘ form sighted by | Name of officer who sighted the
Description ofthe work QLeave Project Number |Amount paid ($)} Date paid assessment form
: manager
1

 

 

 

 

 

 

 

Privacy Statement

The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of Information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.

 

 

Advice for completing Part A

General advice

° Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.

° The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.

Applicant details
° If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.

 

 

 

 

 

Page 5

a

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

Details of the premises

The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other

structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.

Details of the land are not required if the application invotves a mobile and temporary Environmentally Relevant Activity only. Instead complete

Table A.

The premises may be identified in a number of ways —

« Street address and lot on plan are most common and will apply to most applications.

« Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.

The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.

StrategicPortLandis within a !ocal government area but a local government's planning scheme does not apply onStrategicPortLand.

StrategicPortLandis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on

strategic port land) and the Queensland Transport (Ports) website.

‘Tidal water is defined in the Coastaf Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic

port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water

mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local gavemment's area unless
provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local goverment has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, white the Environmental Protection

Agency generally has jurisdiction for a local government tidat area. However, the IPA gives local governments jurisdiction for assessing and

deciding applications for prescribed tidal works within the local goverment tidal area, and the planning scheme may be applied to that

assessment (to the extent provided for in the code for prescribed tidal work).

 

Resource entitlement

Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.1(10){a)(ii) states an application cannot be taken to be properly made without the required evidence.

For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.

 

Owner's consent

Section 3.2.1(3} of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994.
Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.

“Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.

 

 

Portable Long Service Leave (PLSL) Levy

The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for jong service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland.

The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave} Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.

The Building and Construction industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.

The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.qteave.gid.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:

www.gleave.qid.gov.au }

 

 

Page 6

we

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008
e Develop Applicatio OTe)
é Part P
Prescribed tidal work
Nafure of the prescribed tidal works 71
1. What is the nature of the proposed prescribed tidal work and the type of approval sought? (Tick applicable bowes)
Nature of use Estimated value of oe . {
{Tick applicable box) | _ completed works ($) Type of approval Sought |
. . (Private use
, pier or wharf
O vety, pi 3 {[] Non-private use
. 4 LJ Private use
ii Boat ramp or spillwa
UO P or spiiway [J Non-private use
Private use
OD ii Mooring pile 4 Non-private use [XJ Development Permit
Private use imi
Oo (wv) Deck or boardwalk O ; | Preliminary approval
LJ Non-private use
Private use
Vv Pontoon
XW (J Non-private use
Private use
OO wi Revetment, sea wall or retaining wall q .
(J Non-private use
oO (vii) Other (a.9. abutment, basin, bridge, breakwater, dam,
dock, dockyard, embankment, groyne, pipeline or other oO Private use
underground service etc.) - Provide details below
(1 Non-private use
2. — isthe application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of the lot connected to the

work and neighbouring lots are not at right angles to the waterway?

No

O Yes - Submit, with the application. photos of any constructed neighbouring structures, or information about approved but unconstructed

neighbouring structures.

 

‘Adjoining property access and evidence of support

3.

1s the application supported by evidence that the proposed work will not prejudice the access rights of adjoining nroperty owners?

{J No

3{a) What is the nature of the evidence?

XJ Yes - Complete 03(a)

(1) Letters of support from adjoining property owner - Submit, with the application, the letters of support.
[X] Plans illustrating a water allocation area - Submit, with the application, the plans illustrating the water allocation area.

Page 7

INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008

 

‘Certification dt

4. Has a Registered Professional Engineer of Queensland (RPEQ) or interstate equivalent certified that the works comply with the design
and safety provisions of the State IDAS code for Prescribed Tidal Works contained in the Coastal Protection and Management

 

 

 

 

 

 

 

Regulation 2003?

O No

Yes - Provide details below

Name of RPEQ or equivalent a SRB CONSULTING ENGINEERS - S. BELYEA

RPEQNo..or equivalent oe . . ‘2 |RPEQ 6204

Contact mailing address. > - ‘ . . ci- SUPERIOR JETTIES PO BOX 920 NERANG QLD 4211
Contact telephone number . . 107 5594 8200

Contact facsimile aumber 107 5594 8244

Reference number of all plans to which this certification relates |4494-D01, 002

 

 

 

 

 

‘Mandatory information <. en a :

 

5. Confirm the following mandatory information accompanies this application.

 

Confirmation of

lodgement ° Method of lodgement

 

Plans and written documentation

(i) The location and dimensions of the proposed tidal work in relation to the tot/s abutting the proposed J Confirm od
work and the tidal land on which the work is proposed to be located

(ii) All other structures on the waterfront and within 20 metres of the proposed works [X] Confirmed

(iii) The current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide (HAT) and
Mean High Water Springs (MHWS)

(iv) The slope angles of the beds and banks of the tidal area {7} Confirmed
(v) Details of the proposed work in accordance with the IDAS code for prescribed tidal work in the

Coastal Protection and Management Regulation 2003, schedule 4A (e.g. physical appearance, fighting, & Confirmed
signage, earthworks, pubic access, infrastructure, structural components, engineering design standards)

 

 

 

[X] Confirmed

 

 

 

 

 

 

 

(vi) The finished levels of the proposed works (X] Confirmed
[X] Confirmed
(vii) Details of the largest vessel, if any, to be moored at the structure
(] Not applicable
(vii) Evidence that the proposed work will not prejudice the access rights of adjoining property X Confirmed
owners (J Not applicable

 

 

 

 

 

OFFICE USE ONLY

Date Received Reference Numbers fo] EPA cost code | 433061

 

 

 

 

 

 

 

 

Page 8

INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008

Advice for completing Part P

 

General advice

je Part A must also be completed for all IDAS development applications.

* — The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another
question.

» When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) use the process from the information sheet Electronically
paying fees to the Environmental Protection Agency (EPA) and attach the form Electronic Funds Transfer (EFT) payment notification to the application.

* For further information about completing this form go to:

 

. IDAS Guide 24 (Prescribed tidal work)
. Ecoaccess website
° fideti ful id
Q1 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise

development to occur.

 

Q4 A Registered Professional Engineer of Queensland (RPEQ), or the interstate equivalent, may certify that the proposed work complies with the
design and safety provisions of the IDAS code for prescribed tidal work in the Coastal Protection and Management Regulation 2003, schedule
4A. The provision of the certification may reduce the applicable fee for assessment of the work by the local govemment.

 

 

 

Page 9

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

   
   

Form 1 Development Application eC

fa IDAS

Assessment Checklist

 

F
IDAS Development Application Form 4 is the approved form for all development applications under the Integrated Planning Act
1997 IPA). Form 1 is made up of various Parts.

Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Form 1 depends on
the nature of the application.

Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.

“Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be «~~
completed for all development applications except those proposed on land in an urban development area, or for building work
requiring assessment against the Building Act 1975 only. :

For more information about development applications on land in an urban development area, refer to www.ulda.qid.gov.au.
For more advice about building applications refer to Part B of the IDAS Application Form.

 

 

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.

 

For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist

Does the application seek approval to materially change use of the premises? Ces |BNo
if yes - complete Section 2 of this checklist

 

 

Does the application seek approval to reconfigure a lot? Ces |BaNo
if yes - comptete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government.

Does the application seek approval to carry out operational work?
if yes - complete Section 4 of this checklist

 

& Yes |[)No

 

Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?
if yes - complete Section 5 of this checklist

DYes |{KjNo

 

Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?
if yes - complete Section 6 of this checklist. OYes |—No

 

Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? OJYes |XJNo
if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government.

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yas - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of DAS Application Form 1. OYes |K)No
Assessment is by a building certifier

 

 

 

 

 

 

 

 

SECTION 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.

HERITAGE _— ee

11 Is any part of the proposal intended to be carried out on a registered place under the Queensland Heritage Act 1992?
&] No-Gotoaz2 [(] Yes

IPA, schedule 8, part {, lable 5, ten: 2, JP Regulation. schedule 2, table 2, tem 18; IPA, section 1.3 5 iDefinitions for lerms used in development)

 

 

 

REMOVING QUARRY MATERIAL; WILD RIVER AREA _ . __

1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
[IX] No-Gotoat3 (—] Yes

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
IPA, scheduie 8, pari 1, tabie 5, item 1; IP Regulation, schedule 2, lable 2, dem 11: IP Regulation, schedule 1. table 5. itom 2 (wild nver area): Water Act 2000,
Section S66C; Wild Rivers Act 2005, section 43A

Plies hularieeimamecadiemuntimaumnne aoa” ee nee me on ee ee ee oe

ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA

 

 

 

setter. amr,

 

 

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
EX) No-Gotoars [] Yes

IPA, schedule 6, part 1, table 2. ten 1, JPA, schedule 8. part 1, table 5, tams 3 and 4; 1P Regulator
73AA (wild river area), Wild Rivers Act 2005. seston 43A; relevant wild mver declaration; Mild Revers

 

jedule 2, table 2. tems {and 23, Environmental Prvection Act 1994. section

 

ee earns ncn ed reser ee ae ane

WITHIN THE LIMITS OF A PORT

: Co

14 ls sy part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
DX] No - Go fo 01.5

 

 

Oo Yes
IP Regulation, schedule 2, table 2. items 15 and 16
‘DECLARED FISH HABITAT AREA = “|

 

1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
LX] No - Go 0.01.6
oO Yes - /f answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule

8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

JP Regulation. schedule 2, table 2, tem 26

 

 

 

 

 

 

COMMUNITY INFRASTRUCTURE a _ ___. ‘|
1.6 Is any part of the premises designated for community infrastructure?

BX] No - Go fo 01.7

Yes

IP Requtation, schedule 2, table 3, item 7
WASTE WATER MANAGEMENT : TTT 7"
1.7 Does the proposal involve the establishment or expansion of a waste water disposal system?

[EX] No -Endof Section? [—] Yes
IP Regufation, schedule 2, table 3, itam §

 

SECTION 4. Section 4 must be completed when the application s seeks approval to cary out operational work,

rewritten

 

 

 

 

 

 

 

PLANNING SCHEME ee _|
41 ls any of the proposed operational work assessable under a planning scheme?
EX] No - Goto. 04.2 (J Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.

 

"ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUST

AREA.

4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
EX] No -Gotoas3 [_] Yes

IPA, schedule 8, part 1, table 4, fem 2, iP Regulation, schedule 1. part 2, table $, ifenr 1c)
Wild Rivers Code (Note: the code does riot curranily contain applicable provisions for residertial, industrial or commercial development inside a designated urban

 

EVELOPMENT IN A WILD RIVER |

 

 

area}
VEGETATION CLEARING; KOALA CONSERVATION, WILDRIVERAREA ot
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

[XJ No -Gotoas¢ [] Yes

IPA, schedule 8. part 1. tabi 4. items 14-1; IP Regulation, schedule 2, table 2, tem 5 (vegetation clearing), iP Regulation, schedule 2 table 2, dem 34 (koala
conservation), IP Regulation, schedule 1. part 3. labia 4. tem (vegetation clearingéwald river area}; Vegetation Management Act 1999, section 22A (vegetation
cisaringwitd sver area): Wild Rivers Act 2005, sections 31F and 434

 

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

 

 

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA ne
4.4 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or

interfering with water from a watercourse, lake orspring (other than using a water truck to pump water; and other than under the
Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
(X] No -Gotoass (_] Yes - Answer (a) and (b) below

 
 

IPA, schedule 6 part |, table 4, teins Si
areal; Wad Revers Act 2006 sechon 434: re

 

45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?

Ns No Goto 04.6 oO Yes - (Complete Form 1, Part K,) This appiication requires assessment by the Department of Natural Resources and Water
(NRW). if NRWis not the Assessment Manager for the appfication, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, pari 1, table 4, ifem 3{bj; IP Regulation, schedule 2, table 2, fem 8: IP Requistion, schedule 1, part 3, table 4, tam 3

Wild Rivers code (Note: the code does net currenity contain applicable provisions for taking or interfering with artesian water)

46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[X] No -Gotoas7 ([] Yes - Answer (a) and (b) below

IPA, schedule 8 part 1, late 4, ein Helps: IP Regul
Wid Rivers Act 2005. section 434; relevant wild nver de;

 
 

schedule 2 table 2. tem 8; iP Reguiation, schedule { part 3, table 4, dem 3: Water Act 2000 section 965A (wd swer area),
ration. Wit Revers Code

 

47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
LX] No -Gotoass (() Yes
IPA, schedule &. part 1, table 4. item 3{c)(i: iP Reguiation, schedule 2, fable 2, item 8; IP Regulalion, schedule 1, part 3. fable 4, item 3
Water Act 2000, section 966A (wild river area}{Note: no current Wild River declaration identiftes taking or interfering wilh subartesian water as assessable)
Wild River code (Note: the code does nol currently contain applicable provisions for sub artesian water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
(I) No -Gotoas9 ([] Yes - Answer both (a) and (b) below

JPA, soheiile 8, part §, fable 4, Rems Yexn and Ha). 1P Regulation, schedule 2, table 2 item 9. 1F Reguistion, schedule # port 3. table 4. item 34, Water Act 2000, section $668 juni
river area}; relevant wild aver declaraton; Wild Rivers Code.

49 ls the proposed operational work for the following?

(i) For the construction of a referable dam as defined under the Water Act 2000 & No 0D Yes
(ii) To increase the storage capacity of a referable dam by more than 10% &) No 0 Yes

If yes to either or both (i) or {ii) above - (Complete Form 1, Part Ky) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRWis not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

IPA, schedule 8, part 1. table 4. item 4, JP Regulation. schedule 2. table 2. tem 10

 

ce meee |

TIDAL WORK; WILD RIVER AREA

ea a le NN OR ES eee el Ne ce I, 2 mee nem. ttre, seinen tt A
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
(TD No -Gotoa411 [X] Yes - Answer (a) and (b) below
(a) Is any of the proposed tidal work prescribed tidal work?
&] Yes [([] No

If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild
Rivers Act 2005?

No () Yes
If no, is the work proposed in a canal?

[K)No (J Yes

Page 12

-

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

R No - (Complete Form 1, Part P}, if the Environmental Protection Agency (EPA) is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence Agency.

oO Yes - (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency.

(b) Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?

@ One only tocal govemment tidal area ( No &®) Yes

(ii) Starting in one local government tidal area and extending into another local [2] No ol Yes
govemment tidal area (but in no strategic port tidal area)

(ii) In two or more local government tidal areas but not starting in either local Dd No Cl Yes
govemment tidal area

{iv) One only strategic port tidal area —X] No C] Yes

{v) Ata area that is not a strategic port tidal area or a local government tidal B No Yes

Note: The answers you provide in (i) - (v) above may affect who the Assessment Manager is for the application.

IPA, schedule 8, part 1, teble 4, ile 5; IP Regulation. schedule 2, table 2, ilems 12, 14 and 17; IP Regulation. schedule 1, part J, table 4, wems 4A and 5

Coastal Protection and Management Act 1995, section 104A (wild river area)
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA ee |
4.41 ls any of the operational work proposed to be carried out within a coastal management district?
IX] No -Gotoas12 (J Yes

IPA, schedule 8. part 1. table 4, item 5; IP Regulation, schedule 2, table 2, items 12 and 14; IP Regulation. schedule 1, part 3, lable 4, items 4A and 5
Coastal Profection and Managesnent Act 1995 Act 1995, section 104A (wild river areal; Wild Rivers Act 2005. section 43A

 

 

 

   

feat mee aterm one a te a ee

WATERWAY AY BARRIER Wt WORKS; WILD RIVER AREA

Herr RARI OT Att imitates cometh ike Hees Foe Sk ci

 

 

4.12 \s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
BX) No -Gotoas13 ([] Yes

IPA, schedute 8 part 1 table 4, dem 6: IPA, schedule 8, part 2. latiks 4, item: 2, Fisheries Rayidation 1995 31134 (sell-assessable codes): IP Reguialian, schedule 2, table 2. tem 28: 1P
Regie schedule t pad 3. tabla 4. cem janes Act 1994, section 76D (wild nver areay: Wil Act 2008, section 424

 

     
    

 

 

 

‘DECLARED FISH HABITAT AREA; WILD RIVER AREA Sd
4.13 's any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
DX] No - Go fo 04.14

a Yes

 

) part f, table 4, tem 7, IPA, schedule 6 part 2. table 4. hem 2; Ficheries Ru,
recive 1 part 2, fable +, tem 7. Wid Rivers Aci 2005, sections 434, Fusherias

 
 

‘assessable codes), IP Riguiaton sehetiue 2 table 2. kam 26 16
ver 28a}.

 

pee

REMOVAL, DESTRUCTION OR DAMAGE OF A OF Al MARINE PLANT; WILD | RIVER AREA |

 

 

a od

4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
DX] No -Gotoasts [7] Yes

JPA. schenduie 8. part 1 table ¢ tam 8, IPA, schedule 3. part 2 fable 4, w9in 4. Fisheries Regulation 1995 $1134 (sel-assessatle cndes), IP Regulation schedule 2. tad!
Reguiaton schedule 1, pant 3 lable 4 wem é, Fisheries Act 1994. ¢ j

 

   
  
 

witb RIVER AREA

 

4.15 ls any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
(X] No -Gotoos16 ((] Yes
IPA, schedule 8. part 1. table 4, tem 10, IP Requiation. schedule 2. table 2, item 37; Wiki Rivers Act 2005. sections 42. 434

STATE-CONTROLLED ROAD

4.16 ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
BX] No -Endofsection4 [[] Yes
iP Regulation. scheaiile 2, iabie 2, dem 3

Page 13

wo

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

 

Disclaimer:
While the Department of infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all {iability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
teliance on this process and the information contained on this form.

 

 

 

Page 14

 

Sunshine Coast ‘and use SECTION FEES

Regional Council

 

 

 

 

 

 

 

 

RECEIPT TYPE

SALE OF DOCUMENTS

Superseded Planning Scheme Documentation 520

Copy of Permit/Approval Letter 110

The Noosa Plan Documentation 111
APPLICATION FEES

Material Change of Use - Code/Impact

Consistent 521
Inconsistent 521

Assessment under Superseded Planning Scheme §21

Modification to a Development Permit 521

Extension of a Currency Period 521

Operational Works - Landscaping §21

Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW

Half Hour 522

One Hour 522
ADVERTISING

Purchase Advertised Applications 523
JETTIES

Jetty Application Fee “FR 524

Jetty Bond 51

. (Category 4)
BONDS
’ Performance Bond 51
(Category 9)

SIGNS

Registration Fee 222
SEARCH FEE .

Search of Land Use Section file 112

Liquor Licensing Request mo : 113

Total ¢ 775 _
NAME; AA ar M own THe tp preatlio ~or_t A Ll.
AppREss: fo Go. P20
WAC AW) G. ie) “7h

FILENO: O87 20 -_ DATE: 19 fyuflot
RECEIPT NO: i B9cH Signature of TP Officer: PD pee
AUTHORITY NO:

 

[4/2208 /S3—/,

Page 15

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

 

TOTAL FEES

 

 

Used in these records

About this file

File size
738 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0530 - Additional Information [As Published].pdf · 738 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.