Council archive · source document
08/0530 - Additional Information [As Published] · 142008.530
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
IPA, scheduie 8, pari 1, tabie 5, item 1; IP Regulation, schedule 2, lable 2, dem 11: IP Regulation, schedule 1. table 5. itom 2 (wild nver area): Water Act 2000,
Section S66C; Wild Rivers Act 2005, section 43A
Plies hularieeimamecadiemuntimaumnne aoa” ee nee me on ee ee ee oe
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA
setter. amr,
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
EX) No-Gotoars [] Yes
IPA, schedule 6, part 1, table 2. ten 1, JPA, schedule 8. part 1, table 5, tams 3 and 4; 1P Regulator
73AA (wild river area), Wild Rivers Act 2005. seston 43A; relevant wild mver declaration; Mild Revers
jedule 2, table 2. tems {and 23, Environmental Prvection Act 1994. section
ee earns ncn ed reser ee ae ane
WITHIN THE LIMITS OF A PORT
: Co
14 ls sy part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
DX] No - Go fo 01.5
Oo Yes
IP Regulation, schedule 2, table 2. items 15 and 16
‘DECLARED FISH HABITAT AREA = “|
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
LX] No - Go 0.01.6
oO Yes - /f answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
JP Regulation. schedule 2, table 2, tem 26
COMMUNITY INFRASTRUCTURE a _ ___. ‘|
1.6 Is any part of the premises designated for community infrastructure?
BX] No - Go fo 01.7
Yes
IP Requtation, schedule 2, table 3, item 7
WASTE WATER MANAGEMENT : TTT 7"
1.7 Does the proposal involve the establishment or expansion of a waste water disposal system?
[EX] No -Endof Section? [—] Yes
IP Regufation, schedule 2, table 3, itam §
SECTION 4. Section 4 must be completed when the application s seeks approval to cary out operational work,
rewritten
PLANNING SCHEME ee _|
41 ls any of the proposed operational work assessable under a planning scheme?
EX] No - Goto. 04.2 (J Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.
"ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUST
AREA.
4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
EX] No -Gotoas3 [_] Yes
IPA, schedule 8, part 1, table 4, fem 2, iP Regulation, schedule 1. part 2, table $, ifenr 1c)
Wild Rivers Code (Note: the code does riot curranily contain applicable provisions for residertial, industrial or commercial development inside a designated urban
EVELOPMENT IN A WILD RIVER |
area}
VEGETATION CLEARING; KOALA CONSERVATION, WILDRIVERAREA ot
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
[XJ No -Gotoas¢ [] Yes
IPA, schedule 8. part 1. tabi 4. items 14-1; IP Regulation, schedule 2, table 2, tem 5 (vegetation clearing), iP Regulation, schedule 2 table 2, dem 34 (koala
conservation), IP Regulation, schedule 1. part 3. labia 4. tem (vegetation clearingéwald river area}; Vegetation Management Act 1999, section 22A (vegetation
cisaringwitd sver area): Wild Rivers Act 2005, sections 31F and 434
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0530 - Additional Information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 738 KB (small file)
- File type
No other editions are linked here.