Council archive · source document
08/0530 - Additional Information [As Published] · 142008.530
-
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
R No - (Complete Form 1, Part P}, if the Environmental Protection Agency (EPA) is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence Agency.
oO Yes - (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency.
(b) Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?
@ One only tocal govemment tidal area ( No &®) Yes
(ii) Starting in one local government tidal area and extending into another local [2] No ol Yes
govemment tidal area (but in no strategic port tidal area)
(ii) In two or more local government tidal areas but not starting in either local Dd No Cl Yes
govemment tidal area
{iv) One only strategic port tidal area —X] No C] Yes
{v) Ata area that is not a strategic port tidal area or a local government tidal B No Yes
Note: The answers you provide in (i) - (v) above may affect who the Assessment Manager is for the application.
IPA, schedule 8, part 1, teble 4, ile 5; IP Regulation. schedule 2, table 2, ilems 12, 14 and 17; IP Regulation. schedule 1, part J, table 4, wems 4A and 5
Coastal Protection and Management Act 1995, section 104A (wild river area)
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA ee |
4.41 ls any of the operational work proposed to be carried out within a coastal management district?
IX] No -Gotoas12 (J Yes
IPA, schedule 8. part 1. table 4, item 5; IP Regulation, schedule 2, table 2, items 12 and 14; IP Regulation. schedule 1, part 3, lable 4, items 4A and 5
Coastal Profection and Managesnent Act 1995 Act 1995, section 104A (wild river areal; Wild Rivers Act 2005. section 43A
feat mee aterm one a te a ee
WATERWAY AY BARRIER Wt WORKS; WILD RIVER AREA
Herr RARI OT Att imitates cometh ike Hees Foe Sk ci
4.12 \s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
BX) No -Gotoas13 ([] Yes
IPA, schedute 8 part 1 table 4, dem 6: IPA, schedule 8, part 2. latiks 4, item: 2, Fisheries Rayidation 1995 31134 (sell-assessable codes): IP Reguialian, schedule 2, table 2. tem 28: 1P
Regie schedule t pad 3. tabla 4. cem janes Act 1994, section 76D (wild nver areay: Wil Act 2008, section 424
‘DECLARED FISH HABITAT AREA; WILD RIVER AREA Sd
4.13 's any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
DX] No - Go fo 04.14
a Yes
) part f, table 4, tem 7, IPA, schedule 6 part 2. table 4. hem 2; Ficheries Ru,
recive 1 part 2, fable +, tem 7. Wid Rivers Aci 2005, sections 434, Fusherias
‘assessable codes), IP Riguiaton sehetiue 2 table 2. kam 26 16
ver 28a}.
pee
REMOVAL, DESTRUCTION OR DAMAGE OF A OF Al MARINE PLANT; WILD | RIVER AREA |
a od
4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
DX] No -Gotoasts [7] Yes
JPA. schenduie 8. part 1 table ¢ tam 8, IPA, schedule 3. part 2 fable 4, w9in 4. Fisheries Regulation 1995 $1134 (sel-assessatle cndes), IP Regulation schedule 2. tad!
Reguiaton schedule 1, pant 3 lable 4 wem é, Fisheries Act 1994. ¢ j
witb RIVER AREA
4.15 ls any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
(X] No -Gotoos16 ((] Yes
IPA, schedule 8. part 1. table 4, tem 10, IP Requiation. schedule 2. table 2, item 37; Wiki Rivers Act 2005. sections 42. 434
STATE-CONTROLLED ROAD
4.16 ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
BX] No -Endofsection4 [[] Yes
iP Regulation. scheaiile 2, iabie 2, dem 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0530 - Additional Information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 738 KB (small file)
- File type
No other editions are linked here.