Original source · versioned page text
Attachment 1 - Proposal Plans - MCU21-0110.pdf
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 04/09/20 FOR INFORMATION ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
22/09/20
25/09/20
FOR INFORMATION
DA APPROVAL
ST
ST
NOOSA SPRINGS REAL ESTATE PTY COVER SHEET
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This 4
drawing is copyright and the property of the author, and must 5
09/10/20
14/10/20
DA APPROVAL REVISED
DA APPROVAL REVISED
ST
ST
LTD
not be retained, copied or used without the express authority 6 04/11/20 COUNCIL PRESENTATION ST
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 01/12/20 DA APPROVAL REVISED ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
8 21/04/22 UPDATED DA DRAWINGS BY P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
9 04/05/22 UPDATED RENDERS BY
www.marchesepartners.com
10 10/05/22 UPDATED DA DRAWINGS BY
NOOSA SPRINGS BOUTIQUE HOTEL 10/05/22 BY ST
FOR APPROVAL Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323
NOT FOR CONSTRUCTION 20079 DA0.01 10
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 1 - Proposal Plans - MCU21-0110.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of pages 2 to 13 (of 33)
Page 2
CONTENTS
DRAWING TITLE DRAWING NUMBER REVISION NOOSA SPRINGS BOUTIQUE HOTEL
COVER SHEET DA0.01 9 PLANNING DATA
CONTENTS DA0.02 11
GFA CALCULATIONS DA0.03 6
SITE COVER & LANDSCAPE OPEN SPACE EXISTING CARPARKS
EXISTING CONTOURS DA0.04 7
STANDARD PWD
MOVEMENT ANALYSIS DA0.05 6 SITE AREA (PRECINCT G) 38,024m²
UPPER CARPARK 93
SITE PLAN DA1.00 12 SITE COVER
MID CARPARK 69
ENTRY LINK LEVEL PLAN DA1.01 11 PROPOSED NEW HOTEL 9.65% (3670m²)
LOWER CARPARK 49 3
BASEMENT PLAN DA1.02 11 EXISTING CLUB HOUSE 4.836% (1839m²) CLUB LOADING DOCK 6
LOWER GROUND FLOOR PLAN DA1.03 10 EXISTING DAY SPA &
GYMNASIUM 3.44% (1308m²)
TOTAL 217 3
GROUND LEVEL PLAN DA1.04 10 TOTAL SITE COVER 17.84% (6,817m²)
LEVEL 1 PLAN DA1.05 10 PROPOSED NEW CARKING
LEVEL 2 PLAN DA1.06 10 ACCOMMODATION ROOM SCHEDULE STANDARD PWD
LEVEL 3 PLAN DA1.07 10 ROOM PREMIUM PRESIDENTIAL
UPPER CARPARK 82*
SUITE SUITE MID CARPARK 66
ROOF PLAN DA1.08 10 LOWER CARPARK 97* 4*
LOWER GROUND 9
EXISTING CLUBHOUSE PLAN DA1.10 6 GROUND LEVEL 15 CLUB LOADING DOCK 6
PROPOSED CLUBHOUSE PLAN DA1.11 6 LEVEL 1 18 2 OVERFLOW NORTH 19
CARPARK PLANS DA1.12 2 LEVEL 2 29 6 OVERFLOW EAST 15 4
TOTAL 285 8
PROPOSED TENNIS PAVILION DA1.13 3 LEVEL 3 27
*INCLUDES 107 UNDERCOVER CAR PARKS
NORTH & EAST ELEVATION DA2.01 11 TOTAL (106) 98 6 2
SOUTH & WEST ELEVATION DA2.02 11 OTHER PROPOSED FACILITIES
CARPARK ELEVATIONS & SECTION DA2.03 2 PROPOSED GROSS FLOOR AREA POOL
TENNIS COURT ELEVATION & SECTION DA2.04 2 LEVEL GFA (m²)
CAFE & BAR
BUILDING SECTIONS DA3.01 11 CLUB HOUSE EX.
ENTRY LINK LEVEL
105m²
0m²
HOTEL LOBBY
4 x TENNIS COURTS
PART SECTIONS 1 DA3.02 9 BASEMENT
LOWER GROUND
74m²
463m² HOTEL GUEST WAITING AREA
GROUND LEVEL 2103m²
PART SECTIONS 2 DA3.03 10 LEVEL 1
LEVEL 2
1221m²
1822m²
INCREASED PORTE-COCHERE ROOF
EXTRAPOLATED 8m & 12m ABOVE NGL PLANE DA4.01 10 LEVEL 3 1136m² ELECTRIC BICYCLE HIRE
ELEVATION STUDIES 1 DA4.02 7
TOTAL 6924m² 8 x MOTORCYCLE PARKS
ELEVATION STUDIES 2 DA4.03 6
3D VIEW - AERIAL OF SITE DA4.04 8
3D VIEW - BUILDING ENTRY DA4.05 8
3D VIEW - POOL VIEW 1 DA4.06 8
3D VIEW - POOL VIEW 2 DA4.07 8
3D VIEW - LOOKING NORTH FROM RESORT DRIVE DA4.08 8
ACCOMMODATION TYPES DA5.02 5
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 04/09/20 FOR INFORMATION ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
22/09/20
25/09/20
FOR INFORMATION
DA APPROVAL
ST
ST
NOOSA SPRINGS REAL ESTATE PTY CONTENTS
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This 4
drawing is copyright and the property of the author, and must 5
09/10/20
14/10/20
DA APPROVAL REVISED
DA APPROVAL REVISED
ST
ST
LTD
not be retained, copied or used without the express authority 6 01/12/20 DA APPROVAL REVISED ST
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 27/08/21 RFI ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
8 12/11/21 RFI ST P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
9 04/03/22 DA REVISED DESIGN ST
www.marchesepartners.com
10 21/04/22 UPDATED DA DRAWINGS BY
NOOSA SPRINGS BOUTIQUE HOTEL 04/05/22 BY ST
FOR APPROVAL 11 04/05/22 UPDATED RENDERS BY Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323
NOT FOR CONSTRUCTION 20079 DA0.02 11
Page 3
GFA - GROUND LEVEL
2073 m²
Area
30 m²
GFA BASEMENT
74 m²
GFA LOWER GROUND
463 m²
ENTRY LINK LEVEL BASEMENT LOWER GROUND GROUND LEVEL
1 2 3 4
1 : 400 1 : 400 1 : 400 1 : 400
GFA - LEVEL 3
1136 m²
GFA - LEVEL 1
25 m 2
GFA - LEVEL 2
1822 m²
Area Schedule (GFA)
Level Area
BASEMENT 74 m²
LOWER GROUND 463 m²
GROUND LEVEL 2103 m² GFA - LEVEL 1
LEVEL 1 1221 m² 1196 m²
Level 2 1822 m²
Level 3 1136 m²
Grand total 6819 m²
LEVEL 1 Level 2 Level 3
5 6 7
1 : 400 1 : 400 1 : 400
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 22/09/20 FOR INFORMATION ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
25/09/20
09/10/20
DA APPROVAL
DA APPROVAL REVISED
ST
ST
NOOSA SPRINGS REAL ESTATE PTY GFA CALCULATIONS
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This 4
drawing is copyright and the property of the author, and must 5
14/10/20
01/12/20
DA APPROVAL REVISED
DA APPROVAL REVISED
ST
ST
LTD
not be retained, copied or used without the express authority 6 04/03/22 DA REVISED DESIGN ST
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL 04/03/22 BY ST
FOR APPROVAL Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323
NOT FOR CONSTRUCTION 20079 DA0.03 6
Page 4
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 04/09/20 FOR INFORMATION ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
22/09/20
25/09/20
FOR INFORMATION
DA APPROVAL
ST
ST
NOOSA SPRINGS REAL ESTATE PTY EXISTING CONTOURS
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This 4
drawing is copyright and the property of the author, and must 5
09/10/20
14/10/20
DA APPROVAL REVISED
DA APPROVAL REVISED
ST
ST
LTD
not be retained, copied or used without the express authority 6 04/11/20 COUNCIL PRESENTATION ST
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 01/12/20 DA APPROVAL REVISED ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL 01/12/20 BY ST
FOR APPROVAL Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323
NOT FOR CONSTRUCTION 20079 DA0.04 7
Page 5
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 04/09/20 FOR INFORMATION ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
22/09/20
25/09/20
FOR INFORMATION
DA APPROVAL
ST
ST
NOOSA SPRINGS REAL ESTATE PTY MOVEMENT ANALYSIS
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This 4
drawing is copyright and the property of the author, and must 5
09/10/20
14/10/20
DA APPROVAL REVISED
DA APPROVAL REVISED
ST
ST
LTD
not be retained, copied or used without the express authority 6 01/12/20 DA APPROVAL REVISED ST
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
www.marchesepartners.com
NOOSA SPRINGS BOUTIQUE HOTEL 01/12/20 BY ST
FOR APPROVAL Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323
NOT FOR CONSTRUCTION 20079 DA0.05 6
Page 6
LEGEND
OPEN SPACE RECREATION ZONE
TOURIST ACCOMMODATION ZONE
2.5 OU CONTOUR
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 14/10/20 DA APPROVAL REVISED ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2 01/12/20 DA APPROVAL REVISED ST NOOSA SPRINGS REAL ESTATE PTY COUNCIL ZONING MAP OVERLAY
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This
drawing is copyright and the property of the author, and must
LTD
not be retained, copied or used without the express authority
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
www.marchesepartners.com 1 : 500 @A1
NOOSA SPRINGS BOUTIQUE HOTEL 01/12/20 BY ST
FOR APPROVAL Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323 0 5 10 20
NOT FOR CONSTRUCTION 20079 DA0.07 2
Page 7
HAZARDOUS VEG
ET ATION EFFECTIVE
EDGE LINE
28750
40
258
SITE BOUNDARY
19 X CARPARKS
PROPOSED BUILDING - PAVILION 5
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 14/10/20 DA APPROVAL REVISED ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
01/12/20
21/04/22
DA APPROVAL REVISED
UPDATED DA DRAWINGS
ST
BY
NOOSA SPRINGS REAL ESTATE PTY SITE PLAN - BUSHFIRE AERIAL IMAGE
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This
drawing is copyright and the property of the author, and must
LTD UNDERLAY
not be retained, copied or used without the express authority
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
www.marchesepartners.com 1 : 200 @A1
NOOSA SPRINGS BOUTIQUE HOTEL 21/04/22 BY ST
FOR APPROVAL Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323 0 5 10 20
NOT FOR CONSTRUCTION 20079 DA0.08 3
Page 8
LEGEND
1 NEW HOTEL
2 POOL
3 NEW HOTEL ENTRY ROOF
4 TENNIS COURT 1
5 TENNIS COURT 2
6 TENNIS COURT 3
7 LINKS DRIVE
8 RESORT DRIVE
9 EXISTING COUNTRY CLUB
10 EXISTING DAY SPA & GYMNASIUM
11 EXISTING POOL
12 FIRE PIT
13 NEW 2 LEVEL CARPARK WITH EXISTING LOWER CAR
PARK BELOW
14 EXISTING MID CAR PARK
15 EXISTING UPPER CAR PARK
16 EXISTING PORTE-COCHERE
17 EXISTING PORTE-COCHERE ROOF
1
18 PEDESTRIAN ACCESS TO PORTE COCHERE
DA3.03 FROM UPPER CAR PARK
19 NEW PORTE COCHERE ROOF
1 20 EXISTING PORTE COCHERE ROOF EXTENSION
DA3.01 21 SERVICE ACCESS TO POOL PLANT + WATER TANKS
DA4.03 22 PLATEAU
23 SERVICE ROAD WAY EXTENSION
24 EXISTING SERVICE LANEWAY
1 25 EXISTING LOADING BAY
2 26 EXISTING SITE ACCESS
33 DA3.03 27 EXISTING MANHOLE AT PORTE-COCHERE LEVEL
28 EXISTING BUGGY PARKING
8 29 EXISTING BUS PARKING
8305
30 EXISTING BRIDGE CONNECTION
0
753
31 POOL PLANT BELOW TENNIS COURT 12m x 15m
32 TENNIS COURT SHADE STRUCTURE
DA4.02 2 WITH SEATING BELOW
19 X CARPARKS
34 33 CONTROLLED GATE TO OVERFLOW CARPARKING
34 REINFORCED TURF OVERFLOW CARPARKING / MULTI-
2.5 OU CONTOUR
PURPOSE SPACE.
40
35 PEDESTRIAL ACCESS TO CLUBHOUSE
40
36 JACUZZI
37 135000 LITRE WATER TANKS
38 SOLAR PANEL CARPORT ROOFS
450 1 39 AMENITIES
0
CL 40 PHOTOVOLTAIC SOLAR PANEL SYSTEM
EA
R 41 TENNIS PAVILION
42 TENNIS COURT
6 40
1 2.5 OU CONTOUR
1 SITE BOUNDARY
2 DA3.03
2 EXISTING EASEMENT
32 39 23 EXISTING SEWER LINE
450 2
0 1 1 DA3.03
CL
EA
R
2 1 1
5 DA3.02 DA3.02
SERVICE ROAD TO BE A
22 34 MINIMUM 3.5m WIDE
DA4.03 2 1
2 19 x CARPARKS
32 36 (INCLUDES 4xPWD) 33
450 1 2
0
CLE DA1.13 DA1.13 2
AR
00
2 12 2
35
DA2.04 41 DA3.02 1
37 4
31
152
40
11
21 SERVICE ROAD TO BE A
40 40 40 40 MINIMUM 3.5m WIDE
15
42 15 1 10
DA4.02
1 28
24
40 40
ON GRADE CARPARKING BELOW PROPOSED 3
RAISED TENNIS COURT 20
30
35
3 4
19 27
14 2
2
DA4.02 DA4.02 DA3.02
DA2.04 18
26
25
17
26
7 DA2.03 16 9
1
1
29 DA3.01
3 DA2.03
DA2.03 4
13
2
PORTE COCHERE TO BE RENOVATED TO
ENSURE 4.3M HEIGHT CLEARANCE FOR
DA2.03 VEHICLE ACCESS
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 04/09/20 FOR INFORMATION ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
22/09/20
25/09/20
FOR INFORMATION
DA APPROVAL
ST
ST
NOOSA SPRINGS REAL ESTATE PTY SITE PLAN
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This 4
drawing is copyright and the property of the author, and must 5
09/10/20
14/10/20
DA APPROVAL REVISED
DA APPROVAL REVISED
ST
ST
LTD
not be retained, copied or used without the express authority 6 04/11/20 COUNCIL PRESENTATION ST
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 01/12/20 DA APPROVAL REVISED ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
8 19/10/21 CARPARK DESIGN ST P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
9 12/11/21 RFI ST
www.marchesepartners.com 1 : 500 @A1
10 04/03/22 DA REVISED DESIGN ST
NOOSA SPRINGS BOUTIQUE HOTEL 21/04/22 AB BY
FOR APPROVAL 11
12
13/04/22
21/04/22
REVISED DESIGN
UPDATED DA DRAWINGS
BY
BY
Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323 0 5 10 20
NOT FOR CONSTRUCTION 20079 DA1.00 12
Page 9
LEGEND
8 ID DESCRIPTION Count
8
1 ROOM 96
2 ROOM SMALL 2
3 STANDARD SUITE 6
4 PRESIDENTIAL SUITE 2
13750
5 94
6 POOLSIDE COURTYARD 12
9 7
7 CIRCULATION 7
8 LIFT 10
9 STAIR 17
10 COMMUNAL 1
11 PORT COCHERE 1
12 ROAD EXTENSION 1
13 SHORT TERM PARKING 1
14 REFURBISHED PORT COCHERE 1
15 NEW HOTEL ENTRY 1
16 LIGHT WEIGHT ENTRY ROOF OVER 1
BUILDING OVER 16
17 HOUSE KEEPING ROOM 8
18 SERVICES ROOM / CUPBOARD 8
19 PLANT & EQUIPMENT 1
20 POOL 2
15
21 FIRE PIT 1
22 TENNIS PAVILION AND AMENITIES 1
23 BOH ADMIN 1
60 24 PWD 1
25 FEMALE BATHROOMS 1
26 MALE BATHROOMS 1
11 27 MALE STAFF AMENITIES 1
28 FEMALE STAFF AMENITIES 1
29 FURNITURE STORE 2
13 30 GENERAL STORE 1
10
12 31 LINEN STORE 1
32 KITCHEN 1
33 SCISSOR LIFT 1
34 DRY STORE 1
35 LIQUOR STORE 1
14 36 HOUSEKEEPER OFFICE 1
37 KEG ROOM 1
38 LIQUOR COOLROOM 1
39 SERVICE CORRIDOR 1
60
40 PREP & SERVICE KITCHEN 1
41 FUNCTION COLD ROOM 1
42 TROLLEY STORE 1
43 AV 1
44 FREEZER ROOM 1
PORTE COCHERE TO BE RENOVATED TO
ENSURE VEHICLE MOVEMENT AND 4.3M HEIGHT 45 COLD ROOM 1
CLEARANCE FOR VEHICLE ACCESS
46 KITCHEN & POT WASH 1
47 WET WASTE 1
48 DRY WASTE 1
49 LOADING DOCK 1
50 DIRTY LINEN 1
51 COMMS 1
52 MSB 1
53 SERVICE VEHICLE ACCESS ROAD 1
54 JACUZZI 1
55 ELECTRIC VEHICLE CHARGING 4
STATION
56 MOTORCYCLE PARK 4
58 PHOTOVOLTAIC SOLAR PANELS 5
59 VIEWING DECK 1
CARPARK OVER 60 DDA COMPLIANT RAMP 1
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 04/09/20 FOR INFORMATION ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
22/09/20
25/09/20
FOR INFORMATION
DA APPROVAL
ST
ST
NOOSA SPRINGS REAL ESTATE PTY ENTRY LINK LEVEL PLAN
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This 4
drawing is copyright and the property of the author, and must 5
09/10/20
14/10/20
DA APPROVAL REVISED
DA APPROVAL REVISED
ST
ST
LTD
not be retained, copied or used without the express authority 6 04/11/20 COUNCIL PRESENTATION ST
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 01/12/20 DA APPROVAL REVISED ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
8 12/11/21 RFI ST P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
9 04/03/22 DA REVISED DESIGN ST
www.marchesepartners.com 1:250 @A1
10 13/04/22 REVISED DESIGN BY
NOOSA SPRINGS BOUTIQUE HOTEL 09/05/22 AB BY
FOR APPROVAL 11
12
21/04/22
09/05/22
UPDATED DA DRAWINGS
UPDATED DA DRAWINGS
BY
BY
Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323 0 5 10
NOT FOR CONSTRUCTION 20079 DA1.01 12
Page 10
LEGEND
SITE BOUNDARY ID DESCRIPTION Count
1 ROOM 96
2 ROOM SMALL 2
3 STANDARD SUITE 6
4 PRESIDENTIAL SUITE 2
5 94
6 POOLSIDE COURTYARD 12
7 CIRCULATION 7
8 LIFT 10
9 STAIR 17
10 COMMUNAL 1
11 PORT COCHERE 1
12 ROAD EXTENSION 1
13 SHORT TERM PARKING 1
14 REFURBISHED PORT COCHERE 1
15 NEW HOTEL ENTRY 1
16 LIGHT WEIGHT ENTRY ROOF OVER 1
17 HOUSE KEEPING ROOM 8
18 SERVICES ROOM / CUPBOARD 8
19 PLANT & EQUIPMENT 1
20 POOL 2
21 FIRE PIT 1
22 TENNIS PAVILION AND AMENITIES 1
23 BOH ADMIN 1
24 PWD 1
25 FEMALE BATHROOMS 1
26 MALE BATHROOMS 1
27 MALE STAFF AMENITIES 1
28 FEMALE STAFF AMENITIES 1
29 FURNITURE STORE 2
30 GENERAL STORE 1
31 LINEN STORE 1
32 KITCHEN 1
33 SCISSOR LIFT 1
34 DRY STORE 1
35 LIQUOR STORE 1
36 HOUSEKEEPER OFFICE 1
37 KEG ROOM 1
38 LIQUOR COOLROOM 1
39 SERVICE CORRIDOR 1
WATER TANKS UNDER TENNIS COURTS
40 PREP & SERVICE KITCHEN 1
41 FUNCTION COLD ROOM 1
42 TROLLEY STORE 1
43 AV 1
44 FREEZER ROOM 1
45 COLD ROOM 1
46 KITCHEN & POT WASH 1
POOL PLANT TENNIS COURT OVER 47 WET WASTE 1
48 DRY WASTE 1
49 LOADING DOCK 1
50 DIRTY LINEN 1
51 COMMS 1
52 MSB 1
8 53 SERVICE VEHICLE ACCESS ROAD 1
8 54 JACUZZI 1
19500
17 55 ELECTRIC VEHICLE CHARGING 4
7 STATION
56 56 56
5400
55 55 55 55 18 56 MOTORCYCLE PARK 4
9 58 PHOTOVOLTAIC SOLAR PANELS 5
9 59 VIEWING DECK 1
60 DDA COMPLIANT RAMP 1
6200
WALKWAY TO SOLAR ROOF OVER CAR PARK (21 TURNAROUND
TENNIS COURT OVER COVERED PARKS) BAY
5300
TENNIS COURTS
56
2700 2800 2700 2800 400
5400
4800
2700
BUILDING OVER
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 04/09/20 FOR INFORMATION ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
22/09/20
25/09/20
FOR INFORMATION
DA APPROVAL
ST
ST
NOOSA SPRINGS REAL ESTATE PTY BASEMENT PLAN
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This 4
drawing is copyright and the property of the author, and must 5
09/10/20
14/10/20
DA APPROVAL REVISED
DA APPROVAL REVISED
ST
ST
LTD
not be retained, copied or used without the express authority 6 04/11/20 COUNCIL PRESENTATION ST
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 01/12/20 DA APPROVAL REVISED ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
8 12/11/21 RFI ST P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
9 04/03/22 DA REVISED DESIGN ST
www.marchesepartners.com 1:250 @A1
10 13/04/22 REVISED DESIGN BY
NOOSA SPRINGS BOUTIQUE HOTEL 10/05/22 AB BY
FOR APPROVAL 11
12
21/04/22
10/05/22
UPDATED DA DRAWINGS
UPDATED DA DRAWINGS
BY
BY
Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323 0 5 10
NOT FOR CONSTRUCTION 20079 DA1.02 12
Page 11
LEGEND
SITE BOUNDARY ID DESCRIPTION Count
1 ROOM 96
2 ROOM SMALL 2
3 STANDARD SUITE 6
4 PRESIDENTIAL SUITE 2
5 BALCONY 93
6 POOLSIDE COURTYARD 12
7 CIRCULATION 7
8 LIFT 10
9 STAIR 17
10 COMMUNAL 1
11 PORT COCHERE 1
12 ROAD EXTENSION 1
13 SHORT TERM PARKING 1
14 REFURBISHED PORT COCHERE 1
15 NEW HOTEL ENTRY 1
16 LIGHT WEIGHT ENTRY ROOF OVER 1
17 HOUSE KEEPING ROOM 8
18 SERVICES ROOM / CUPBOARD 8
19 PLANT & EQUIPMENT 1
20 POOL 2
21 FIRE PIT 1
22 TENNIS PAVILION AND AMENITIES 1
BUILDING OVER 23 BOH ADMIN 1
24 PWD 1
25 FEMALE BATHROOMS 1
26 MALE BATHROOMS 1
27 MALE STAFF AMENITIES 1
28 FEMALE STAFF AMENITIES 1
29 FURNITURE STORE 2
30 GENERAL STORE 1
BUILDING OVER
31 LINEN STORE 1
32 KITCHEN 1
33 SCISSOR LIFT 1
34 DRY STORE 1
35 LIQUOR STORE 1
BUILDING OVER
36 HOUSEKEEPER OFFICE 1
37 KEG ROOM 1
38 LIQUOR COOLROOM 1
39 SERVICE CORRIDOR 1
40 PREP & SERVICE KITCHEN 1
41 FUNCTION COLD ROOM 1
42 TROLLEY STORE 1
43 AV 1
44 FREEZER ROOM 1
45 COLD ROOM 1
46 KITCHEN & POT WASH 1
47 WET WASTE 1
48 DRY WASTE 1
BUILDING OVER
49 LOADING DOCK 1
50 DIRTY LINEN 1
51 COMMS 1
52 MSB 1
8 53 SERVICE VEHICLE ACCESS ROAD 1
8 54 JACUZZI 1
55 ELECTRIC VEHICLE CHARGING 4
ID
17
VO
FIRE HYDRANT HOT WATER PLANT DOMESTIC CW
22300 STATION
58 58 58 PUMP ROOM LOCATION PUMPSET 18 56 MOTORCYCLE PARK 4
19 EXISTING DAY SPA & FITNESS CENTRE
9 58 PHOTOVOLTAIC SOLAR PANELS 5
7 9 59 VIEWING DECK 1
CARPARKING BELOW
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM
LG.1 LG.2 LG.3 LG.4 LG.5 LG.6 LG.7 LG.8 LG.9
1 1 1 1 1 1 1 1 1
58 58
5 5 5 5 5 5 5 5 5
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 04/09/20 FOR INFORMATION ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
22/09/20
25/09/20
FOR INFORMATION
DA APPROVAL
ST
ST
NOOSA SPRINGS REAL ESTATE PTY LOWER GROUND FLOOR PLAN
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This 4
drawing is copyright and the property of the author, and must 5
09/10/20
14/10/20
DA APPROVAL REVISED
DA APPROVAL REVISED
ST
ST
LTD
not be retained, copied or used without the express authority 6 04/11/20 COUNCIL PRESENTATION ST
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 01/12/20 DA APPROVAL REVISED ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
8 12/11/21 RFI ST P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
9 04/03/22 DA REVISED DESIGN ST
www.marchesepartners.com 1:250 @A1
10 13/04/22 REVISED DESIGN BY
NOOSA SPRINGS BOUTIQUE HOTEL 13/04/22 AB BY
FOR APPROVAL Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323 0 5 10
NOT FOR CONSTRUCTION 20079 DA1.03 10
Page 12
LEGEND
SITE BOUNDARY ID DESCRIPTION Count
1 ROOM 96
2 ROOM SMALL 2
3 STANDARD SUITE 6
4 PRESIDENTIAL SUITE 2
5 BALCONY 93
6 POOLSIDE COURTYARD 12
7 CIRCULATION 7
8 LIFT 10
9 STAIR 17
BUILDING OVER 10 COMMUNAL 1
11 PORT COCHERE 1
12 ROAD EXTENSION 1
13 SHORT TERM PARKING 1
14 REFURBISHED PORT COCHERE 1
15 NEW HOTEL ENTRY 1
8 16 LIGHT WEIGHT ENTRY ROOF OVER 1
BU
8 17 HOUSE KEEPING ROOM 8
IL
D
18 SERVICES ROOM / CUPBOARD 8
IN
G
O
19 PLANT & EQUIPMENT 1
VE
R
52
20 POOL 2
5000L IN-GROUND GREASE TRAP
21 FIRE PIT 1
BUILDING OVER 22 TENNIS PAVILION AND AMENITIES 1
9 51
23 BOH ADMIN 1
24 PWD 1
50
25 FEMALE BATHROOMS 1
53 26 MALE BATHROOMS 1
CA
49
F E
SE
27 MALE STAFF AMENITIES 1
RV
E RY
28 FEMALE STAFF AMENITIES 1
39 47 48 29 FURNITURE STORE 2
T
AN
30 GENERAL STORE 1
UR
TA
00
46
R
S
29 31 LINEN STORE 1
RE
VE
35
45
O
32 KITCHEN 1
L
O
PO
44 43
33 SCISSOR LIFT 1
BUILDING OVER
40
41 42 34 DRY STORE 1
35 LIQUOR STORE 1
33
39 39 36 HOUSEKEEPER OFFICE 1
BUILDING OVER
37 38
32 37 KEG ROOM 1
54 36 35 34 38 LIQUOR COOLROOM 1
39 SERVICE CORRIDOR 1
31
30 40 PREP & SERVICE KITCHEN 1
29 41 FUNCTION COLD ROOM 1
22 27 28 42 TROLLEY STORE 1
43 AV 1
21
44 FREEZER ROOM 1
45 COLD ROOM 1
20
46 KITCHEN & POT WASH 1
24 25 47 WET WASTE 1
48 DRY WASTE 1
26
49 LOADING DOCK 1
BUILDING 50 DIRTY LINEN 1
6 6 OVER 6 6 6 6 23 51 COMMS 1
52 MSB 1
LO
BB
Y
8 53 SERVICE VEHICLE ACCESS ROAD 1
/R
EC
EP
8 54 JACUZZI 1
TI
ROOM ROOM ROOM ROOM ROOM ROOM
ON
25510
R
VE
55 ELECTRIC VEHICLE CHARGING 4
ID
G.10 G.11 G.12 G.13 G.14 G.15 17
O
VO
STATION
G
1 1 1 1 1 1
IN
18
D
56 MOTORCYCLE PARK 4
IL
BU
9
EXISTING DAY SPA & FITNESS CENTRE
58 PHOTOVOLTAIC SOLAR PANELS 5
7 9 59 VIEWING DECK 1
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM
G.1 G.2 G.3 G.4 G.5 G.6 G.7 G.8 G.9
1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5
BUILDING OVER
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 04/09/20 FOR INFORMATION ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
22/09/20
25/09/20
FOR INFORMATION
DA APPROVAL
ST
ST
NOOSA SPRINGS REAL ESTATE PTY GROUND LEVEL PLAN
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This 4
drawing is copyright and the property of the author, and must 5
09/10/20
14/10/20
DA APPROVAL REVISED
DA APPROVAL REVISED
ST
ST
LTD
not be retained, copied or used without the express authority 6 04/11/20 COUNCIL PRESENTATION ST
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 01/12/20 DA APPROVAL REVISED ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
8 12/11/21 RFI ST P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
9 04/03/22 DA REVISED DESIGN ST
www.marchesepartners.com 1:250 @A1
10 13/04/22 REVISED DESIGN BY
NOOSA SPRINGS BOUTIQUE HOTEL 13/04/22 AB BY
FOR APPROVAL Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323 0 5 10
NOT FOR CONSTRUCTION 20079 DA1.04 10
Page 13
LEGEND
SITE BOUNDARY ID DESCRIPTION Count
1 ROOM 96
2 ROOM SMALL 2
3 STANDARD SUITE 6
BUILDING OVER
4 PRESIDENTIAL SUITE 2
BUILDING OVER
5 BALCONY 93
6 POOLSIDE COURTYARD 12
7 CIRCULATION 7
8 LIFT 10
9 STAIR 17
10 COMMUNAL 1
11 PORT COCHERE 1
9 12 ROAD EXTENSION 1
7 13 SHORT TERM PARKING 1
18
BU
ROOM ROOM ROOM ROOM ROOM ROOM 14 REFURBISHED PORT COCHERE 1
IL
L1.19 L1.18 L1.17 L1.16 L1.15 L1.14 17
D
15 NEW HOTEL ENTRY 1
IN
G
1 1 1 1 1 1
O
8 16 LIGHT WEIGHT ENTRY ROOF OVER 1
VE
R
8 17 HOUSE KEEPING ROOM 8
6 6 6 6 6 6 18 SERVICES ROOM / CUPBOARD 8
19 PLANT & EQUIPMENT 1
20 POOL 2
21 FIRE PIT 1
22 TENNIS PAVILION AND AMENITIES 1
9
23 BOH ADMIN 1
20
PWD
24 PWD 1
LOADING DOCK 25 FEMALE BATHROOMS 1
STO S
BELOW 26 MALE BATHROOMS 1
L ET
BUILDING OVER
R.
VOID
TOI
27 MALE STAFF AMENITIES 1
LOADING 28 FEMALE STAFF AMENITIES 1
DOCK BELOW
29 FURNITURE STORE 2
ROOM 30 GENERAL STORE 1
L1.13 31 LINEN STORE 1
1
5 32 KITCHEN 1
ROOM 33 SCISSOR LIFT 1
BUILDING OVER
L1.12
VOID
34 DRY STORE 1
BUILDING OVER
1
VOID
5 35 LIQUOR STORE 1
ROOM
36 HOUSEKEEPER OFFICE 1
L1.11
1 MULTI-PURPOSE 37 KEG ROOM 1
5 SPACE BELOW
ROOM 38 LIQUOR COOLROOM 1
+RL 7.50
L1.10 39 SERVICE CORRIDOR 1
1 40 PREP & SERVICE KITCHEN 1
5
ROOM 41 FUNCTION COLD ROOM 1
L1.9 42 TROLLEY STORE 1
7 1
5 43 AV 1
+RL 9.20
ROOM SMALL 44 FREEZER ROOM 1
L1.8 45 COLD ROOM 1
2
5 46 KITCHEN & POT WASH 1
ROOM
47 WET WASTE 1
L1.7
ROOM 1 48 DRY WASTE 1
L1.6 49 LOADING DOCK 1
ROOM 1 5 50 DIRTY LINEN 1
BUILDING OVER L1.5 51 COMMS 1
5
ROOM 1 5 52 MSB 1
5 8 L1.4 53 SERVICE VEHICLE ACCESS ROAD 1
1
8 ROOM 5 54 JACUZZI 1
PRESIDENTIAL SUITE PRESIDENTIAL SUITE L1.3 55 ELECTRIC VEHICLE CHARGING 4
17
L1.1 L1.2 1 STATION
28700 ROOM 5
4 4 18
L1.2 56 MOTORCYCLE PARK 4
9
ID
1 5 58 PHOTOVOLTAIC SOLAR PANELS 5
7 9 59 VIEWING DECK 1
VO
5
18°
BUILDING OVER
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 04/09/20 FOR INFORMATION ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
22/09/20
25/09/20
FOR INFORMATION
DA APPROVAL
ST
ST
NOOSA SPRINGS REAL ESTATE PTY LEVEL 1 PLAN
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This 4
drawing is copyright and the property of the author, and must 5
09/10/20
14/10/20
DA APPROVAL REVISED
DA APPROVAL REVISED
ST
ST
LTD
not be retained, copied or used without the express authority 6 04/11/20 COUNCIL PRESENTATION ST
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 01/12/20 DA APPROVAL REVISED ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
8 12/11/21 RFI ST P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
9 04/03/22 DA REVISED DESIGN ST
www.marchesepartners.com 1:250 @A1
10 13/04/22 REVISED DESIGN BY
NOOSA SPRINGS BOUTIQUE HOTEL 13/04/22 AB BY
FOR APPROVAL Sydney ꞏ Brisbaneꞏ Melbourne ꞏ Adelaide
Kuala Lumpur ꞏ Auckland ꞏ Christchurch ꞏ London ꞏ Madrid JOB DRAWING REVISION
ABN 33 590 578 323 0 5 10
NOT FOR CONSTRUCTION 20079 DA1.05 10
The text continues on page 14.