   catchpit, manhole and pipeline locations
   drainage details (if applicable)
   cross road drainage culverts (if applicable)
   concrete footpaths and cycle paths
   location and details for access points, ramps and invert crossings
   changes in surfacing material.
Applications for operational work involving stormwater drainage
Drawings showing:                                                                     Confirmed         Electronic
 existing and proposed contours                                                      Not applicable
 drainage locations, diameters and class of pipe, open drains and
    easements
 manhole location, chainage and offset or coordinates and inlet and outlet
    invert levels
 inlet pit locations, chainage and offset or coordinates and invert and kerb
    levels.
Applications for operational work involving water reticulation
Drawings showing:                                                                     Confirmed
 kerb lines or edge of pavement where kerb is not constructed                        Not applicable
 location and levels of other utility services where affected by water
    reticulation works
   pipe diameter, type of pipe and pipe alignment
   water main alignments
   water supply pump station details (if applicable)
   minor reservoir details (if applicable)
   conduits
   location of valves and fire hydrants
   location of house connections (if applicable)
   location of bench marks and reference pegs.
Applications for operational work involving sewerage reticulation
Drawings showing:                                                                     Confirmed
   location of all existing and proposed services                                    Not applicable
   location of all existing and proposed sewer lines and manhole locations
   location of all house connection branches
   kerb lines or edge of pavement where kerb is not constructed
   chainages
   design sewer invert levels
   design top of manhole levels
   type of manhole and manhole cover
   pipe diameter, type of pipe and pipe alignment
   location of house connections (if applicable)
   sewer pump station details (if applicable).
Applications for operational work involving street lighting
Drawings showing:                                                                     Confirmed
   location of all light poles and service conduits                                  Not applicable
   location of all other cross road conduits
   type of wattage and lighting
   any traffic calming devices
   additional plans for roundabouts and major roads (if applicable)
   details of any variations to normal alignment

                                                                          IDAS form 6—Building or operational work assessable
                                                                                                   against a planning scheme
                                                                                                  Version 3.1—3 August 2015
Log in to download the original file

sara-idas-form-6-building-or-operational-work.pdf · 100 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.