Original source · versioned page text
Drawing Transmittal
Attached to the e-mail Operational Works Application OPW16 /0203 - 1 of 4.
PAGE 2 OF 2
Calibre Consulting (Aust) Pty Ltd ABN 55 070 683 037
Ground Floor, 545 Queen Street, Brisbane QLD 4000 calibreconsulting.co
PO Box 10349 Adelaide Street, Brisbane QLD 4000
Phone 07 3895 3444
DRAWING REGISTER / TRANSMITTAL FORM
PROJECT NAME
PALM LAKE RESORT - COOROY - STAGE 2
Project Number DATE OF ISSUE
D 12
16-001014 M 9
Drawing Description No. Y 16
SEWERAGE RETICULATION
SEWERAGE RETICULATION NOTES AND LOCALITY PLAN -200 -
SEWERAGE RETICULATION LONGITUDINAL SECTION SHEET 1 OF-202
2 A
SEWERAGE RETICULATION LONGITUDINAL SECTION SHEET 2 OF-203
2 A
SANITARY SERVICES SITE PLAN -210 A
WATER SUPPLY
WATER SUPPLY NOTES AND DETAILS -300 A
WATER SUPPLY LAYOUT PLAN -301 A
STORMWATER QUALITY
WATER QUALITY NOTES AND DETAILS -400 A A
SOUTHERN BIORETENTION BASIN LAYOUT PLAN -401 A A
SOUTHERN BIORETENTION BASIN SECTIONS -402 A A
CENTRAL BASIN LAYOUT PLAN -403 - -
CENTRAL BASIN SETOUT PLAN SHEET 1 OF 4 -404 - -
CENTRAL BASIN SETOUT PLAN SHEET 2 OF 4 -405 - -
CENTRAL BASIN SETOUT PLAN SHEET 3 OF 4 -406 - -
CENTRAL BASIN SETOUT PLAN SHEET 4 OF 4 -407 - -
CENTRAL BASIN SECTIONS SHEET 1 OF 2 -408 - -
CENTRAL BASIN SECTIONS SHEET 2 OF 2 -409 - -
CENTRAL BAIN DETAILS -410 - -
NORTHERN BASIN LAYOUT PLAN -411 - -
NORTHERN BASIN SECTIONS -412 - -
E - Email, M - Mail / Post, D - Hand Delivered E
Revision
Current
P - PDF, A - ACAD, H - HARDCOPY P
Size - A0, A1, A3, A4 A3
DISTRIBUTION COPIES
Council - Noosa Shire Council 1
REASON FOR ISSUE
A - APPROVAL, P - PRELIMINARY, R - REVISION, S - AS REQUESTED A
T - TENDER, C- CONSTRUCTION, AC - AS-CON, X - INFORMATION
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.