Build 4 U Quote · 132004.4078.09

Attached to the e-mail Changes Application - Tourist Information Centre - 132004.4078.09.

of 5

Text shows just the words. Original shows the document exactly as it was published.

                                                              Travcon Pty Ltd T/as Build 4 U Quality Constructions

                                                                                              ABN: 12 606 778 590
                                                                                           QBCC Licence: 15029383




                                                      OHS/WHS
                                                   Prequalification


                                     Term and Conditions of Quotation

    1. This Quotation contains the Specifications of the materials to be used and the price for which the
       Contractor will undertake the building works. It does not, in itself, create a contractual relationship
       between the parties. The only contract by which the parties will be bound is a formal Building
       Contract executed by all parties.

    2. A provisional sum as described in the Domestic Building Contract Act is an estimate of the cost of
       carrying out particular work. The estimate includes the cost of supplying any materials needed for
       the work. An estimate is required if, after making all reasonable enquiries, the builder cannot give a
       definite amount for the item at the time the contract is entered into. Any difference between the
       provisional sum listed in the contract and the actual cost is paid by the client. This in effect changes
       the contract price. Provisional sums are in addition to the total price quoted unless stated otherwise

    3. This Quotation remains open for acceptance by the Owner for 30 days after its delivery to the
       Owner. If the Owner wished to accept the Quotation it must, within this period:
              3.1     initial each page;
              3.2     date and sign where indicated; and
              3.3     deliver it to the Contractor.

    4. Upon receipt of the accepted Quotation within the specified period, a formal Building Contract will
       be prepared for signing by the parties.

Signed for and on behalf of the Contractor:                      Signed for and on behalf of the Owner

………………………………………………                                               ………………………………………..
Signature                                                        Signature

………………………………………………                                               ……………………………………….
Name (BLOCK CAPITALS)                                            Name (BLOCK CAPITALS)

………………………………………………                                               ……………………………………….
Date                                                             Date




                                                 Initials_______                PO Box 708, Coolum Beach QLD 4573
Page 5 of 5                                                                    P: 07 5448 2155 E: [email protected]
                                                                                       Mick Lance - M: 0455 379 112

Used in these records

About this file

File size
662 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Build 4 U Quote.pdf · 662 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.