Skip to the record
Every meeting, every word.

Council archive · source document

360CC Response to IR item 5 - 13 Noosa Dr · MCU19/0031

of 8

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

In the instance that all car parks for able-bodied persons are full but the car park for a
disabled person is empty, the empty disabled car park can be used as a turnaround bay.

The boom gate is designed to allow a minimum space of 1.2m from the end of the boom
gate to the building to allow pedestrians and scooters to access the scooter parking bays.

Details of the proposed boom gate and sensors are attached in Appendix A.

Any modifications to the carparking and access arrangement can be made via a subsequent
Operational Works Approval process.

End of Response to Information Request Item 5.

I trust that this addresses the engineering issues raised in Council’s Information Request –
Item 5. Please do not hesitate to contact me on 0490 530 793 should you have any queries
regarding any of the above matters or the attached drawings.

Yours sincerely,




Chris Gibberd
Principal Engineer
360 Civil Consulting Pty Ltd
RPEQ - 13268

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

360CC Response to IR item 5 - 13 Noosa Dr.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.