Skip to the record
Beware of cheap imitations.

Council archive · source document

Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257

of 64

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (12.5 MB): may take a few minutes to open.

Log in to see the plans as drawn
    GeoConsulting, Report #15988, July 11                                                                   Page 2
    Lot 34 Marcus Dues Court, Marcus Beach



    2.0        ASSESSMENT METHODOLOGY

    2.1        Methodology
    This assessment comprised of the following stages: -


          a)   Desktop Study
               ♦   Review of available relevant planning documentation including layout, topographic plans and
                   flood data (if applicable).
               ♦   Review of historical landslide documentation (if available).
               ♦   Collation of regional soil and geological data.
               ♦   Review of existing geotechnical reports (if applicable).


          b)   Site Assessment
               ♦   Conduct a site walkover and confirm visual and/or anecdotal evidence of landslip hazards.
               ♦   Advance boreholes (BH) and dynamic cone penetrometer (DCP) tests at representative locations
                   and as appropriate.
               ♦   Confirm findings of desktop study.


          c)   Analysis of Data and Stability Risk Assessment
               ♦   Assignment of a qualitative measure of likelihood; consequence to property; level of risk to life
                   and property; and risk implications.
               ♦   Determine recommendations and construction guidelines.


    2.2        Referenced Documentation Specific to lot 34
    Existing documents referenced in this review include: -
               ♦   Sunshine Coast Regional Council (SCRC), The Noosa Plan - Eastern Beaches Natural Hazard:
                   Landslide and Flooding Overlay, (Map OM4.3).
               ♦   Department of Mines and Energy, Queensland 1999, Gympie, Australia 1:100 000 Geological
                   Special, Sheet 9445, Part 9545, Department of Mines and Energy, Queensland, Brisbane.
               ♦   Architectural plans by Foster Designs - #SK-0.03/05/08-P, May 2011.



    2.3        Review Procedures
    Review procedures were in accordance with the following: -
               ♦
f              ♦
               ♦
                   AS 1289
                   AS 1726
                   AS 2870
                                 -
                                 -
                                 -
                                             Methods of Testing of Soils for Engineering Purposes
                                             Geotechnical Site Investigations
                                             Residential Slabs and Footings - Construction
               ♦   AS 3798       -           Guidelines on Earthworks for Commercial and Residential Development
               ♦   AS 4055       -           Wind Loads for Housing




                                                Office at: 1/8 Venna St, Maroochydore, Q, 4558.

                                     Phone: 5443 6622, Fax: 5479 1899, Email: admin®geoconsulting.com.au

Used in these records

About this file

File size
12.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11_0168 & OPW11_0257.pdf · 12.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.