Skip to the record
Accept no imitations.

Council archive · source document

Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257

of 64

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (12.5 MB): may take a few minutes to open.

Log in to see the plans as drawn
GeoConsulting, Report 015988, July I I                                                               Page 7
Lot 34 Marcus Dues Court, Marcus Beach



                                 Figure 1 Major types of Landslide Movement




                                                               Topple.            Debt is now




                                                                                     Creep



                                                                                                                I
                                                        I:dcral sjIr,


                                                  (Source: AGS (2007'))




5.0        STABILITY RISK ASSESSMENT & MITIGATION

5.1        Terminology
The terminology of the Practice Note Guidelines for Landslide Risk Management (AGS (2007c)) has
been used in the descriptions of hazards and the qualitative assessment of likelihood, consequence and
risk of slope instability. Extracts of the Practice Note Guidelines for Landslide Risk Management (AGS
(2007c)) that details terminology and associated risk matrix tables have been attached as APPENDIX B.


5.2        Visual Observations
With reference to the site features and geology described in the above sections, there were no obvious          I
signs of slope instability observed during our site inspection and the base geology of Quaternary Dunes
is not generally considered to be highly prone to instability.


 5.3       Subsurface Observations
 Inspection of the site indicates consistent subsurface soil profiles that typically reflect this topographic   I
 region.

                                                                                                                1
                                          01rim at: 1/8 Denna St, Maroochydore, Q, 4558.
                               Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]

Used in these records

About this file

File size
12.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11_0168 & OPW11_0257.pdf · 12.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.