    GeoConsulting, Report #15988, July 11                                                                          Page 12
    Lot 34 Marcus Dues Court, Marcus Beach



    7.       CONCLUSIONS

    7.1      Recommendations
    Notwithstanding the following conclusions, it is recommended:
             ♦    Minimise cut/fill earthworks. Sheet piling or other retention devices should be considered to
                  stabilize the cut embankment during construction.
             ♦    It is proposed to retain the cut embankment with the retaining wall to be incorporated into
                  the residential structure. The retaining wall is to be designed by a suitably qualified engineer
                  and in accordance with the recommendations made herein.
             ♦    Foundations are to be designed based on the bearing capacity given in Tables 1 - 3 in Section
                   3.2.9 of this report.
             ♦     Install and maintain drainage systems to divert water away from the proposed residence


    7.2      Slope Stability Risk
    It has been concluded that this geological region has a negligible to low risk of slope instability.
    Movements are typically in the form of hillside scour and slumping from concentrated runoff and / or
    inappropriate earthworks. With maintenance to the surface drainage, founding to depths as discussed and
    temporary/final retention of cut/fill areas, then the risk will not preclude building. Construction should be
    in accordance with the recommendations made herein, amended and / or reinforced by structural design.


    It has been concluded that this geological region has a low risk of slope instability and with the adoption
    of our recommendations; this risk can be maintained as "low". Construction should be in accordance with
    the recommendations made herein, amended and / or reinforced by structural design.


t   A summary of the identified hazards on Lot 34 is presented in Table 6 with risk assessment prior to and
    subsequent to the recommendations made herein.


                                            Table 6 Final Risk Assessment Matrix



I                       Identified Hazard
                                                                   Existing Risk
                                                                   Assessment
                                                                                                 Risk Assessment
                                                                                                  Subsequent to
                                                                                                 Recommendations
                 1. Hillside slope failure:-
                              Lower than dwelling                       Low                         Very Low
                                    At dwelling site                    Low                         Very Low
                               Above dwelling site                      Low                         Very Low
                 2. Unsupported batters: -
                                                   Cut          Low to moderate                     Very Low
                                                    Fill        Low to moderate                     Very Low
                 3. Rendered cobble wall                        Low to moderate                     Very Low




                                               office at: 1/8 Denna St, Maroochydore, Q, 4558.
                                  Phone: 5443 6622, Fax: 5479 1899, Email: admin&geoconsulting.com.au

Used in these records

About this file

File size
12.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11_0168 & OPW11_0257.pdf · 12.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.