Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257

of 64

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (12.5 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
              APPENDIX C: - QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


    QUALITATIVE RISK ANALYSIS MATRIX - LEVEL OF RISK TO PROPERTY
                     LIKELIHOOD                                                 CONSEQU ENCES TO PROP ERTY (With Indicative Approximate Cost of Damage)
                                         Indicative Value of          1: CATASTROPHIC                 2: MAJOR               3: MEDIUM                4: MINOR                    5:
                                        Approximate Annual                  2000G,                       60%                     20%                     5%                INSIGNIFICANT
                                             Probability                                                                                                                        0.5%
A - ALMOST CERTAIN                                10"1                                                                                                     H                   M or L (5)

B    LIKELY                                       10.2                                                                             H                       M                        L

C - POSSIBLE                                      10"3                                                     H                       M                       M                       VL

D    UNLIKELY                                     10-4                          H                          M                       L                       L                       VL

E - RARE                                          I0"3                          M                          L                       L                      VL                       VL

F - BARELY CREDIBLE                               l0-6                          L                         VL                       VL                     VL                       VL

    Notes:    (5)   For Cell A5, may be subdivided such that a consequence of less than 0.1 % is Low Risk.
              (6)   When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                    time.



    RISK LEVEL IMPLICATIONS
                       Risk Level                                                                                  Example Implications (7)
                                                                Unacceptable without treatment Extensive detailed investigation and research, planning and implementation of treatment
                                                                options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
ism                                                             property.
                                                                Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
         H                          HIGH RISK
                                                                risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                May be tolerated in certain circumstances (subject to regulator's approval) but requires investigation, planning and
         M                     MODERATE RISK                    implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                implemented as soon as practicable.
                                                                Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
         L                          LOW RISK
                                                                required.
                                                                Acceptable. Manage by normal slope maintenance procedures.
         VL                     VERY LOW RISK

     Note:    (7)   The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
                    given as a general guide.




    92                         Australian Geomechanics Vol 42 No 1 March 2007

Used in these records

About this file

File size
12.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11_0168 & OPW11_0257.pdf · 12.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.