Council archive · source document
Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257
Plans and drawings: the text below has words only, no drawings.
Very large file (12.5 MB): may take a few minutes to open.
• Water that is transmitted into masonry, metal or timber building
elements causes damage and/or decay to those elements.
• High subfloor humidity and moisture content create an ideal
environment for various pests, including termites and spiders.
• Where high moisture levels are transmitted to the flooring and
Clump of trees,
heaht se ccted walls, an increase in the dust mite count can ensue within the
-or distance living areas. Dust mites, as well as dampness in general, can be a
?ream ;Noose health hazard to inhabitants, particularly those who are
L7t abnormally susceptible to respiratory ailments.
Lawn
'fhe garden
The Ideal vegetation layout is to have lawn or plants that require
1` rnn only light watering immediately adjacent to the drainage or paving
Patio edge, then more demanding plants, shrubs and trees spread out in
that order.
Overwatering due to misuse of automatic watering systems is a
Di airit u common cause of saturation and water migration under footings. If
Carport ?alhsvay it is necessary to use these systems, it is important to remove garden
beds to a completely safe distance from buildings.
Existing trees
Where a tree is causing a problem of soil drying or there is the
existence or threat of upheaval of footings, if the offending roots are
subsidiary and their removal will not significantly damage the tree,
they should be severed and a concrete or metal barrier placed
vertically in the soil to prevent future root growth in the direction of
vsrden bed
the building. If it is not possible to remove the relevant roots
Drivewayl d yr lh
mulch without damage to the tree, an application to remove the tree should
be Made to the local authority. A prudent plan is to transplant likely
Medurn offenders before they become a problem.
height tree
Information on trees, plants and shrubs
State departments overseeing agriculture can give information
regarding root patterns, volume of water needed and safe distance
from buildings of most species. Botanic gardens are also sources of
information. For information on plant roots and drains, see Building
Technology File 17.
should extend outwards a minimum of 900 mm (more in highly Excavation
reactive soil) and should have a minimum fall away from the Excavation around footings must be properly engineered. Soil
building of 1:60. The finished paving should be no less than 100 supporting footings can only be safely excavated at an angle that
mm below brick vent bases.
It is prudent to relocate drainage pipes away from this paving, if
possible, to avoid complications from future leakage. If this is not
allows the soil under the footing to remain stable. This angle is
called the angle of repose (or friction) and varies significantly
between soil types and conditions. Removal of soil within the angle
of repose will cause subsidence.
1
practical, earthenware pipes should he replaced by PVC and
backfilling should be of the sarrte soil type as the surrounding soil
and compacted to the same density. Remediation
Except in areas where freezing of water is an issue, it is wise to
remove taps in the building area and relocate them well away from Where erosion has occurred that has washed away soil adjacent to
the building preferably riot uphill from it (see BTF 19).
It may be desirable to install a grated drain at the outside edge of the
paving on the uphill side of the building. If subsoil drainage is
footings, soil of the same classification should be introduced and
compacted to the same density. Where footings have been
undermined, augmentation or other specialist work may be required.
Remediation of footings and foundations is generally the realm of a
L I
needed this can be installed under the surface drain.
specialist consultant.
Condensation Where isolated footings rise and fall because of swell/shrink effect,
In buildings with a subfloor void such as where bearers and joists the homeowner may be tempted to alleviate floor bounce by filling
support flooring, insufficient ventilation creates ideal conditions for the gap that has appeared between the bearer and the pier with
condensation, particularly where there is little clearance between the blocking. The danger here is that when the next swell segment of the
floor and the ground. Condensation adds to the moisture already cycle occurs, the extra blocking will push the floor up into an
present in the subfloor and significantly slows the process of drying accentuated dome and may also cause local shear failure in the soil.
out. Installation of an adequate subfloor ventilation system, either If it is necessary to use blocking, it should be by a pair of fine
natural or mechanical, is desirable. wedges and monitoring should be carried out fortnightly.
Warning: Although this Building'Iechnology File deals with This BTF was prepared by John Lewer FAIR, MIAMA, Partner,
cracking in buildings, it should be said that subfloor moisture can Construction Diagnosis.
result in the development of other problems, notably:
The information In this and other issues in the series was derived from various sources and was believed to be correct when published.
The information Is advisory. It is provided in good faith and not claimed to be an exhaustive treatment of the relevant subject.
Further professional advice needs to be obtained before taking any action based on the information provided.
Distributed by
C S I RO PUBLISHING PO Box 1139, Collingwood 3066, Australia
Freecall 1800 645 051 Tel (03) 9662 7666 Fax (03) 9662 7555 www.publish.csiro.au
Email: [email protected]
© CSIRO 2003. Unauthorised copying of this Building Technology file is prohibited
I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257Related documentApplication case desk ↗
Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257Related documentApplication case desk ↗
About this file
- File size
- 12.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.