Advanced tree stock planting
Proposed Tapley Residence - Lot 34, Noosa Dunes. selection to Noosa Shire Council
approval and guidelines.
EXTENT OF WORKS
Contractor should take full account of documentation of Civil PLANT STOCK NOTES
Engineering, Hydraulic Engineering and Electrical Engineering
Container sizes are noted with Pots in millimetres & Bags in litres.
Works. Landscape works are to include the following: 2100 x 75 x 75 Hwd stakes. All
Stock may be rejected if plants are:
a) Undersized proportional to specified container size or stakes to be chamfered, centrally
1. Topsoil - Supply and incorporation pointed & driven vertically into
if the root system is underdeveloped
2. Shaping of garden areas the ground outside the rootball
b) Oversized proportional to specified container size or
3. Containerised Plant Material - Supply and installation
severely root bound
4. Garden Mulch - Supply and Spread Approved securing material such
c) Unbalanced or unchara cteristic of normal or specified
5. Turf Supply & Lay as Rubber tree ties or 50mm
growth pattern for the species
6. Maintenance of landscape works (90days) jutemat/hessian ties in figure 8
d) Not suitably acclimatised for the specific environment
loops secured loosely to tree &
e) diseased, infested with pests or suffering from other fixed to stake with flathead galv.
form of significant stress nails
1. TOPSOIL- SUPPLY AND INCORPORATION
Planting areas are to be progressively filled with premium 100mm nom. composted organic
grade blended organic garden soil mix. Soil to be "organic 4. GARDEN MULCH mulch or NSC approved. Form
garden mix" type. Soil supplier as well as intended mix Organic Mulch : Mulch shall be Tea Tree Fines mulch to shallow dish drain to base of tree.
is to be nominated. Soil is to be mounded to facilitate good Mound at pit edge
to a predominant depth of 100mm after settlement.
drainage to hardstand areas (max. 1:3 grade) and is to finish
Tree pit to be excavated to min.
50mm below edging after settlement. Organic additive 900 depth and backfilled with
"dynamic lifter" or similar is to be incorporated throughout the 5. TURF-SUPPLY AND LAY 100 friable imported topsoil with
soil mix at the recommended rate. a. Empire Zoysia "Sapphire" (or similar approved) 20% organic content, light
A slow release ferti liser such as "osmocote" or its equivalent is minimum sod depth - 25 mm. compaction only.
also to be incorporated with individual plantings in accordance b. Turf to be laid within 24 hours of being cut.
with the manufacturers recommendations. c. Allow for ground preparation and deposition of 50 mm (Max 2% organic content). Backfill
imported garden loam topsoil. Apply Dynamic Lifter or original subgrade material, light
equivalent as per manufacturers recommendations. compaction only. Rootball to sit
2. SHAPING OF GARDEN AREAS I TURF MOUNDS on top of backfill
d. Turf to be close butted and rolled in accordance with
Planting areas are to be fin ished in a gently mounded fashion
accepted practice to ensure a smooth even surface. Slow release fertiliser to
to facilitate drainage of excess water and to show planting to ,- x manufacturers specifications
best advantage. Contractor is to seek confirmation of finished
levels prior to final plantings and application of mulch. 6. MAINTENANCE OF LANDSCAPE WORKS Cultivate subgrade to 150 depth
All garden beds to be well drained. Drainage shall be provided a. Monitor plant performance and st ress constantly and take
appropriate remedial action. Soil moisture levels are porous d FUA. Lx IUUL UdII WIULII
for in areas of that stay saturated for extended periods to the
critical during early establishment. enerally 2x width of rootbaff)
potential detriment of plantings.
b. Prune and shape all shrubs and trees as required
ie. Clear trunk to 1200mm & damaged branches PLANTING DETAIL - ADVANCED STOCK NTS
3. CONTAINERISED PLANT MATERIAL c. Remove all stakes at 90 day inspection
Plant material is to be approved by superintendent prior to d. Fertilise all garden beds at 3 months (low phosphorus type)
planting. Planting is to be carried out in a manner consistent
with good horticultural practice. All trees are
e. Contractor shall maintain an up to date written log book
to record inspection observations and actions.
(7-
to be guyed and staked as per Detail - Advanced B COUNCIL PLANNING APPLICATION 25/07/11
Container Planting. Smaller plant stock is to be staked as B BODY CORPORATE SUBMISSION
28/06/11
necessary. Stakes shall not pass through rootball of plant at • HEIGHTS SHOWN TO RELATIVE TO AHD.
time of planting or any time thereafter. A BODY CORPORATE SUBMISSION 21/06/11
Issue Comments Date
Landscape Specification
NOTE: PLANT SPECIES SELECTION:
GENERALLY TREES OUTSIDE THE PLANT SPECIES HAVE BEEN SPECIFICALLY PROPOSED TAPLEY RESIDENCE
BUILDING E N VALOPE AREA ARE SELECTED FOR THIS HASTINGS ST PROJECT: Lot 34, Noosa Dunes
TO BE RETAINED.
- THAT ARE NATIVE OR NATURALISED TO THE NOOSA AREA
- TOLERANT OF THE HARSH COASTAL ENVIRONMENT
- PERFORM SPECIFIC FUNCTIONS AS PART OF THE PLANTED LANSCAPE, !m` foster
INCLUDING, SHADE, FRAMING, BORDER DEFINITION AND SCREENING
- ARE AESTHETICALLY PLEASING AND FIT THE LANDSCAPE STYLING
- FIT WITHIN AND ARE SIMILAR TO THE NOOSA DUNES
STREETSCAPE REDEVELOPMENT CJ ARC-0.13 - B
RINTEI
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257Related documentApplication case desk ↗
Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257Related documentApplication case desk ↗
About this file
- File size
- 12.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.