Council archive · source document
Decision Notice - Negotiated - OPW22 0299 [As Published] · OPW22/0299
Landscaping Works
47. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice. Updated landscape plans
must be resubmitted prior to a prestart meeting that include all changes approved as part of
the higher order MCU22/0231.01.
(* Refer to Advisory Note)
48. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
49. Landscape works must:
a. Ensure amenity or sales signage and ancillary infrastructure is not installed within the
road reserve.
b. Ensure permanent irrigation is not installed within the road reserve.
c. Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of
foreign matter including anthropogenic waste, rock, soil/sediment contamination and is
applied to all planting areas to ensure a minimum 100mm depth once settled.
(* Refer to Advisory Note)
50. Public amenity trees* must:
a. Meet AS 2302 – Tree Stock for landscape use.
b. Be located in accordance with engineering requirements for safe vehicle and
pedestrian sight lines.
c. Be located from services and infrastructure a minimum of:
i. 6m from electricity poles and pillars.
ii. 4m from street lighting.
iii. 2m from stormwater catchment pits.
iv. 2m from any adjoining driveway.
*(Refer to Advisory Note)
51. Turfed areas must be free of pest, diseases and weeds and level with adjoining surfaces.
52. Soil for landscaping must:
a. Provide for healthy and sustained site specific vegetation performance.
b. comply with AS 4419, Soils for landscaping and garden use.
Damage to Services and Assets
53. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION / PRIOR TO COMMENCEMENT OF THE USE
Certification
54. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the Operational Works permit.
Page 10 of 15
Document Set ID: 22425549
Version: 3, Version Date: 15/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Negotiated - OPW22 0299 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 168 KB (small file)
- File type
No other editions are linked here.