Council archive · source document
Module 10 · OPW16/0098
Attached to the e-mail OPW16/0098 - Operational Works Application.
Performance outcomes Acceptable outcomes Response Comment
AO4.4 For at-sea disposal of dredged material where the N/A
marine spoil disposal site is a retentive (i.e. non-
dispersive) site, the disposal site identified in the dredge
management plan has the capacity to hold and retain the
material within its boundaries during construction and
operation of the development.
Editor’s note: The use of dredged material for a beneficial
purpose could include development of port or other marine
facilities, use for construction or industrial purposes, or use to
create or modify land or waters for an approved environmental
outcome (such as creation of a bird roosting site). Further
information about beneficial uses is contained in the National
assessment guidelines for dredging, Australian Government
Department of Environment, Water, Heritage and the Arts, 2009
Within a strategic environmental area: riparian and wildlife corridor functions
PO5 Where clearing of native marine AO5.1 Clearing of marine plants is minimised and an N/A
plants cannot be avoided and the extent environmental offset is for any significant residual impact
of clearing has been minimised, an from the clearing
environmental offsets is provided for any
significant residual impact from the AND
clearing.
AO5.2 Any clearing of marine plants is limited to the N/A
minimum area required for the works and to allow for
maintenance.
PO6 Natural regeneration of any cleared AO6.1 There is no impediments to the natural N/A
or work areas is facilitated regeneration of native plant species in the area of clearing
and works following completion of works.
PO7 Development avoids or minimises AO 7.1 Development avoids, or minimises adverse N/A
adverse impacts on fish passage. impacts on fish passage during works and the carrying out
of the activity.
PO8 Development avoids or minimises AO8.1 Works are located, designed, and constructed to N/A
impacts on fish habitat values. minimise impacts on fish habitat values and function.
Within a strategic environmental area: hydrological processes
PO9 Development avoids or minimises No acceptable outcome is prescribed. N/A
impacts on natural drainage lines or flow
paths, during both construction and
operation.
State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code
10 October 2014 V1.5 Page 14 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Module 10.pdfRelated documentApplication case desk ↗
About this file
- File size
- 198 KB (small file)
- File type
No other editions are linked here.