Council archive · source document
2505-45903 SRA RA6-N Response with conditions 14.05.25 · MCU25/0041
2505-45903 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition timing
Development Permit – Operational Work
Schedule 10, Part 17, Division 3, Table 2, Item 1 – Tidal works or work in a coastal management
district - The chief executive administering the Planning Act 2016 nominates the Director-General of the
Department of Transport and Main Roads to be the enforcement authority for the development to which
this development approval relates for the administration and enforcement of any matter relating to the
following conditions:
Approved plan(s)
1. The development must be carried out generally in accordance with the At all times
following plans:
Site plan and water allocation prepared by Marine Structures
dated 15/01/2025, drawing no. TJS-05028-01, Revision B
Layout plan prepared by Marine Structures dated 10/02/2025,
drawing no. TJS-0528-02, Revision B.
Lighting
2. (a) Light/mark all vessels, structures, plant and equipment associated For the duration of
with: works for operational
i. the works, in accordance with the following specifications: to be maintained at
any anchors deployed must be marked with yellow all time
buoys and fitted with FL yellow lights fitted
ii. operations, in accordance with the following specifications:
section 3 of AS4282-1997 Control of the obtrusive
effects of outdoor lighting
(b) Lighting provided must not obscure, disguise or otherwise interfere
with the safe navigation of other vessel, including the effectiveness
of navigational lighting.
Protection of navigable waterways
3. The construction, operation and maintenance of the pontoon and any For the duration of
ship berthed, moored or attached to the structure, must not: works, and at all
(a) encroach into, pass over or under a navigation corridor times
(b) be located in a high-risk maritime zone
(c) impede the safe navigation of other ships or boats
(d) restrict safe access to or from neighbouring structures.
4. Remove and dispose of any debris or similar obstruction encountered For the duration of
whilst undertaking the work at an appropriately licensed facility. works, and at all
times
5. All piles and/or structure to be demolished both above and below the Prior to the
waterline must be completely extracted/removed. completion of the
works
State Assessment and Referral Agency Page 3 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2505-45903 SRA RA6-N Response with conditions 14.05.25.pdfRelated documentApplication case desk ↗
About this file
- File size
- 247 KB (small file)
- File type
No other editions are linked here.