Original source · versioned page text
Attachment 5 - Bushfire Management Plan - 02 December 2019
Plans and drawings: the text below has words only, no drawings.
Very large file (11.8 MB): may take a few minutes to open.
EMTU
RP844425
No. 602533554
Cov.
SPIB2B45
No. 710227518
SP182880 &&
: Me. EMT E
SPI67978 D
[ Sp No. Tete EMT W pO A
N
SP1&2880
No. 710227520
\
lease
Cov.K No. 710981233
SP182845
are W022 7518 fy, \ &
RPNT294
No. 602533547
Cov.
SPIB2B45 ~ és yy
No. 710227518
y ZK
Cov.l
Toto Site Area ~ BL 73h (Lot 3 on SP246584,
Lota Site Area 40 (Lo 4) suas
loped Area — 1.2662 ho No. 710227518
Covenont Areos:
Covenent /- 0.5254 ho 3 3
Covenant J — 1.3000 ho
Covenant K - 0.2000 ha SPIEZE4S
Covenant L - 0.3466 ha ‘ SP182845
Qevelopoble Areas:
Areo |= 0.3375 ho ~ inclusive of sewearage Emt. 710227520 (4m *)
Areo 2 - 2.6104 ha ~ inclusive of: Fl peveloped'a
- Electricity Transmission Emt. 602533547 (6699m *) te veloped Area
~ Water Supply Emt. 602533554 (19m *) a
— Orainage Emt. 710212346 (618m) [{] Devetopable Area
Area 3 - 0.7919 ha 5
Aree 4— 13.0432 ho | Environmental Covenanant
Area 5 ~ 12891 ha =
Area 6 - 0.0197 ha
TOTAL — Bizahs
9 40 80 160 240 320 400
= . - = METRES. = —— =
T — = =
Developable Area Plan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.