Original source · versioned page text
Attachment 5 - Bushfire Management Plan - 02 December 2019
Plans and drawings: the text below has words only, no drawings.
Very large file (11.8 MB): may take a few minutes to open.
2
SUBDIVISION of
Lots 1-19, 21-24,
Easements in
Lots 1-4, 11-15,
22-24 and
Covenants in
Lots 2, 7-9, & 23
Cancelling Lot 3
on SP246584,
Original Lot 29
on MCH390
ENGINEERING 1856-R01 - G 1/11/19
PRELIMINARY 1856-SW07
CONCEPT
PROPOSED
SUBDIVISION
AT
NOOSA CIVIC,
WALTER HAY
DRIVE
NOOSAVILLE
Detail and Level 034389.50 - 09/08/2019
Survey of part of
Part of Lot 3 on
SP246584
110kV LINE 19-0496 B 12/11/19
PROFILE
LOTS 23 R19 H 11/11/2019
DRIVEWAY
LONGITUDINAL
SECTION
LOTS 23 R20 H 11/11/2019
DRIVEWAY
CROSS
SECTIONS
ROAD WORKS R08 G 1/11/2019
LAYOUT PLAN 5
OF 6
2. Easement conditions must be maintained at all times.
3. The applicant is required to update the conditions of Easement D on RP177294
to Energex’s current standard conditions document (Dealing Number
708346714). This is to be done prior to, or at the time of the sealing of the
survey plan.
4. Bollards must be installed around the existing electrical pole (at approximately
CH40) to protect the pole from vehicle collision. This is to be done prior to the
sealing of the survey plan.
Reference: HBD 6804682
Did you know Energex has a referral website?
https://www.energex.com.au/home/our-services/connections/development-application-referrals
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.