Skip to the record
Accept no imitations.

Original source · versioned page text

Attachment 5 - Bushfire Management Plan - 02 December 2019

of 33

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (11.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
Report on Updated Bushfire Management Plan for            Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic


1. Introduction
The Noosa Civic site (total area 72.76ha) has enjoyed three completed stages of
development. This development has included commercial, industrial and residential
components. This has been largely in the north and west of the site. (see Aerial
Photograph No. 1)

The original Master Plan identified large areas of ecological significance which has been
quarantined by Council Park/Open Space or Environmental Covenant. (see Aerial
Photograph No. 1)

The next stages of development include the clearing of those nodes of expansion (see
Clearing Plan). Two areas, Lot 3 (4.261ha) and Lot 7 (2.963ha) will be retained in the
interim as regrowth vegetation.

The entire area has enjoyed previous Bushfire Management Plans and this is an update of
these previous plans and bushfire assessments. The entire precinct of Noosa Civic is
under onsite management which includes bushfire. There is an annual seasonal
preparedness review that ensures all maintenance is current. This will continue for all new
aspects of bushfire associated with this proposed development including the emergency
access south of Lots 11-15.


2. History
Prior to 2003 the site had been partially cleared and enjoyed a range of uses. In 2003 an
unplanned bushfire burnt the entire site. (Refer to Photographs in 2004 Bushfire
Management Plan) There has been no burning, planned or unplanned, on the site since
2003.


The development to date has effectively eliminated the bushfire hazard from the north and
west. In September 2019, essential emergency clearing was undertaken to provide a
break to the Council Open Space to the South of the site to manage bushfire risk.

Prior to 1990 the subject site was partly cleared with some regrowth. (see Aerial
Photograph No. 2 1993)




  19-001 Updated Report – 2 December 2019                        Commercial-in-Confidence
                                                                                  Page 1
Log in to download the original file

Attachment 5 - Bushfire Management Plan - 02 December 2019.pdf · 11.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.