Original source · versioned page text
Attachment 5 - Bushfire Management Plan - 02 December 2019
Plans and drawings: the text below has words only, no drawings.
Very large file (11.8 MB): may take a few minutes to open.
Report on Updated Bushfire Management Plan for Stockwell Development Group Pty Ltd
Undeveloped Area of Noosa Civic
National Park to the east and north of Area 2 also provides a risk.
It is possible for a nuisance fire to develop on Lots 3 and 7 but with very small areas
surrounded by access and firebreaks this situation is easily controlled. It may be possible
in the future to conduct a fuel reduction burn on these two areas. Any requirements for
this will form part of the annual bushfire management assessment and plan.
5. Mitigating Actions for Compliance with Bushfire Overlay
There are no requirements for Areas 1, 3 and 5.
5.1 Access
Area 4
The link of Hofmann Drive to Walter Hay Drive provides a major improvement for
emergency access to the site. The construction for the road between Lots 3 and 7 and
access along the western boundary of Lot 3 provide confidence that any risk is easily
contained.
It is proposed to have a 6m emergency access along the southern boundary of Lots 11-15
linking Hofmann Drive with Walter Hay Drive. This access has been reviewed by
engineering and the access to Walter Hay Drive confirmed by Barlow & Shelley (see
Engineering Drawings attached. This access will be maintained via an easement and the
management of this access will be the responsibility of Lot 1(the Noosa Civic Shopping
Centre).
There will also be a 10 metre firebreak along the northern boundary of Lots 4, 5, 6 and 8.
(see Diagram B). This is an interim management plan until planning for lots 3 and 7 is
completed, and a Development Application is finalised.
Area 2
The presence of Eenie Creek Road and Walter Hay Drive removes any further actions
from north, west and south.
The existing management access under the power line is connected to Walter Hay Drive
and to the three metre bikeway in the north.
19-001 Updated Report – 2 December 2019 Commercial-in-Confidence
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.