2014-09-25 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
MINUTES
Ordinary Meeting
Thursday, 25 September 2014
commencing at 6pm
Council Chambers, 9 Pelican Street, Tewantin
Crs Noel Playford (Chair), Bob Abbot, Sandy Bolton, Joe Jurisevic,
Frank Pardon, Tony Wellington, Frank Wilkie
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 26 sections
Section 2
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
1 ATTENDANCE & APOLOGIES
COUNCILLORS
Councillor N Playford, Mayor
Councillor S Bolton
Councillor J Jurisevic
Councillor F Wilkie
Councillor F Pardon
EXECUTIVE
B de Chastel, Chief Executive Officer
A Rogers, Director Community Services
M Shave, Director Corporate Services
M Drydale, Director Planning & Infrastructure
APOLOGIES
Councillor Abbot
Councillor T Wellington
The meeting commenced at 6.01pm
2 CONFIRMATION OF MINUTES
Council Resolution
Moved: Cr Jurisevic
Seconded: Cr Bolton
The Minutes of the Ordinary Meeting held on 28 August 2014 be received and confirmed
Carried.
3 MAYORAL MINUTES
Nil.
4 NOTIFIED MOTIONS
Nil.
Page 2 of 27
Section 3
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
5 CONSIDERATION OF COMMITTEE RECOMMENDATIONS
INFRASTRUCTURE AND SERVICES COMMITTEE RECOMMENDATIONS
16 SEPTEMBER 2014 - Crs Sandy Bolton (Chair), Frank Pardon, Noel Playford
Apology: Cr Bob Abbot
Other Councillors in Attendance: Cr Jurisevic
4 BOREEN POINT-TEWANTIN FLEXILINK SERVICE
Council Resolution
Moved: Cr Pardon
Seconded: Cr Wilkie
That Council note the report by the Senior Project Officer to the Infrastructure & Services
Committee Meeting dated 16 September 2014 and defer consideration of the matter to a
future round of Council meetings to allow staff to investigate possibilities for partnering with
existing community organisations and businesses who might want to be involved in the
provision of subsidised transport.
Carried.
The following Recommendations from the Infrastructure and Services Committee
were adopted without discussion or further amendment.
Council Resolution
Moved: Cr Pardon
Seconded: Cr Wilkie
The Infrastructure & Services Committee recommendations dated 16 September, 2014 be
adopted except where dealt with or held over by separate resolution.
Carried.
1 COOLOOLA RECREATION AREA REVENUE AND EXPENDITURE
That Council note the report by the Director, Planning & Infrastructure to the Infrastructure
& Services Committee Meeting dated 16 September 2014 regarding the Cooloola
Recreation Area Revenue and Expenditure.
Page 3 of 27
Section 4
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
2 NOOSA RIVER EROSION MANAGEMENT
That Council note the report by the Director Planning & Infrastructure and Senior Technical
Officer to the Infrastructure & Services Committee Meeting dated 16 September 2014 and:
A. Request that a detailed assessment for the development of a hydrodynamic model
for the Noosa River between Tewantin and the river mouth be prepared for
consideration by Council at the next budget review; and
B. That a Tidal Works application be submitted to the Department of Environment and
Heritage Protection for the trialling of geotextile sandbag groynes at Noosa River
Holiday Park located at Munna Point.
3 COUNCIL CABS ELIGIBILITY CRITERIA
That Council note the report by the Senior Project Officer and the Development Officer to
the Infrastructure & Services Committee Meeting dated 16 September 2014 and defer
consideration of the matter to a future round of Council meetings to allow staff to
investigate possibilities for partnering with existing community organisations involved in the
provision of subsidised transport.
5 COUNCIL POLICY - ASSET MANAGEMENT
Item not dealt with by Infrastructure & Services Committee. Referred to General
Committee for consideration.
Reason for referral: Request for a further report outlining the amendments to the
Policy suggested by the Infrastructure & Services Committee
6 CAPITAL PROGRAM DELIVERY STATUS - SEPTEMBER 2014
That Council note the report by the Asset Planning Manager to the Infrastructure &
Services Committee Meeting dated 16 September 2014 providing an update on the status
of the projects within the 2014/15 Capital Works Program.
7 EXTERNAL FUNDING GRANTS - BUS STOPS & CYCLE NETWORKS
That Council note the report by the Senior Technical Officer to the Infrastructure & Services
Committee Meeting dated 16 September 2014 regarding Council’s successful grant funding
under the Passenger Transport Accessible Infrastructure Program 2014-15 and the Cycle
Network Local Government Grants Program 2014-15 and:
A. Authorise the CEO to sign all necessary documentation related to the grant funding;
B. Provide authority to proceed with the delivery of all grant approved projects and any
necessary ancillary works.
8 TENDER CONSIDERATION PLAN FOR SUPPLY OF QUARRY, ASPHALT AND
BITUMINOUS MATERIALS
That Council note the report by the Manager Civil Operations to the Infrastructure &
Services Committee Meeting dated 16 September 2014 and resolve to establish a Supplier
Arrangement for the Supply of Quarry, Asphalt and Bituminous Materials (Contract
1415T002) commencing 1 October 2014 for a period of 9 (nine) months expiring 30 June
2015, with the Suppliers listed in Attachment 1 and schedule of rates subject to rise and
fall.
Page 4 of 27
Section 5
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
PLANNING & ORGANISATION COMMITTEE RECOMMENDATIONS
16 SEPTEMBER 2014 – Crs Frank Wilkie (Chair), Joe Jurisevic, Noel Playford
Apology : Cr Tony Wellington
Other Councillors in Attendance: Crs Sandy Bolton and Frank Pardon.
The following Recommendations from the Planning and Organisation Committee
were adopted without discussion or further amendment.
Council Resolution
Moved: Cr Wilkie
Seconded: Cr Jurisevic
The Planning & Organisation Committee recommendations dated 16 September, 2014 be
adopted.
Carried.
1 DEVELOPMENT APPLICATION FOR PRELIMINARY BUILDING WORKS
ASSESSABLE AGAINST THE PLANNING SCHEME FOR ADDITIONS TO A
DETACHED HOUSE 19 ALLAMBI RISE NOOSA HEADS - PBA14/0017
That Council note the report by the Planning Technical Officer to the Planning &
Organisation Committee Meeting dated 16 September 2014 regarding application
PBA14/0017 for Preliminary Building Works Assessable against the Planning Scheme – 3
storey addition at 19 Allambi Rise, Noosa Heads and approve the application in
accordance with the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan name, prepared by Date
DD 1.01 P1 P1 Site Plan, prepared by Tim Ditchfield Architects 01/08/14
DD 2.04 P1 P1 Undercroft Floor Plan, prepared by Tim Ditchfield 01/08/14
Architects
DD 2.03 P1 P1 Lower Ground Floor, prepared by Tim Ditchfield 01/08/14
Architects
DD 2.03 P1 P1 Upper Ground Floor, prepared by Tim Ditchfield 01/08/14
Architects
DD 2.02 P1 P1 First Floor, prepared by Tim Ditchfield Architects 01/08/14
DD 2.05 P1 P1 Roof Plan, prepared by Tim Ditchfield Architects 01/08/14
DD 3.03 P1 P1 Section C-C, prepared by Tim Ditchfield Architects 01/08/14
DD 4.01 P1 P1 South Elevation, prepared by Tim Ditchfield Architects 01/08/14
DD 4.02 P1 P1 East Elevation, prepared by Tim Ditchfield Architects 01/08/14
DD 4.03 P1 P1 North Elevation, prepared by Tim Ditchfield Architects 01/08/14
DD 4.04 P1 P1 West Elevation, prepared by Tim Ditchfield Architects 01/08/14
Page 5 of 27
Section 6
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
Building Height
3. The maximum height of all new additions to the dwelling must not exceed 8
metres above the finished ground level and the natural ground surface. The new 3
storey portion is only permitted where indicated on the approved plans.
4. Certification must be submitted to Council from a Licensed Surveyor which
certifies that the building does not exceed the maximum height requirement of this
Decision Notice.
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of
$5,000 must be submitted to Council, to secure performance of all conditions of
this approval, prior to the issue of a Development Permit for Building Works. The
cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Landscaping
6. The land between the dwelling and the eastern boundary must be reinstated to the
natural ground surface level except for the vehicle access to the north east corner
of the lot.
7. Existing trees on the site and within road reserves must be retained, except where
required to be removed between the dwelling and the eastern boundary.
8. Trees to be retained and must be protected from construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are
already cleared
d. using low impact construction techniques around vegetation.
9. Screening vegetation must be planted along the eastern boundary in accordance
with Council’s Planning Scheme Policy PSP3 Landscaping Plants and Guidelines.
The planted vegetation must have a minimum pot size of 200mm and consist of
native, endemic species. In this regard, 4 species with a pot size of 45 litres, must
be planted and evenly spaced along the length of the eastern elevation.
Geotechnical Stability
10. All works must be carried out in accordance with a Geotechnical Report for the
site prepared by a qualified person*. Prior to the issue of a Development Permit
for Building Works, certification must be submitted to Council from a qualified
person* which certifies that the site is not at risk from landslide emanating from the
site or from other land.
External Colours
11. External colours and finishes of the building must comprise of
muted/environmental tones that blend with the natural environment to assist the
building to blend with the surrounding vegetation. In this regard, the colour palette
must be in accordance with the colour indicated on the approved plans or
alternatively submitted to Council for approval prior to the issue of Development
Permit for Building Works.
Page 6 of 27
Section 7
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not
form part of the assessment manager conditions:
Development Compliance Inspection
1. Prior to the commencement of the use, please contact Council's Planning
Assessment Branch to arrange a Development Compliance Inspection.
* Qualified Person – Geotechnical Stability
2. For the purpose of preparing a Geotechnical Report, and for certifying
geotechnical stability for the development, a qualified person is considered to be a
person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and
c. has a minimum of 5 years’ experience in the field of geotechnical
engineering or engineering geology.
2 APPLICATION FOR MATERIAL CHANGE OF USE ANIMAL HUSBANDRY TYPE 2 -
INTENSIVE) AND ENVIRONMENTALLY RELEVANT ACTIVITY (ERA 4 - POULTRY
FARMING) SITUATED AT 136 TOP FORESTRY ROAD, RIDGEWOOD MCU12/0184
Item not dealt with by Planning & Organisation Committee. Referred to General
Committee for consideration.
Reason for referral: Significance of issue.
3 APPLICATION FOR MATERIAL CHANGE OF USE - MULTIPLE HOUSING TYPE 4
CONVENTIONAL (4 UNITS) AND ASSOCIATED OPERATIONAL WORKS SITUATED
AT 28 NANNYGAI STREET, NOOSAVILLE MCU14/0051 & OPW14/0274
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 16 September 2014 regarding Application No. MCU14/0051 and
OPW14/0274 for Development Permits for Material Change of Use for Multiple Housing
Type 4 Conventional (4 units) and Operational Works situated at 28 Nannygai Street,
Noosaville; and
A. Approve the applications in accordance with the following conditions:
Development Permit for Material Change of Use for Multiple Housing Type 4
Conventional (4 units)
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied
with prior to the use commencing, and then compliance maintained at all times
while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
in the following table unless otherwise amended by these conditions.
Page 7 of 27
Section 8
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
Plan No. Rev. Plan/Document Name Date
4416SM Sheet 5 of 36 PA Site Plan, prepared by I Want 27 June 2014
That Design
4416SM Sheet 6 of 36 PA Lower Floor Plans, prepared by I 27 June 2014
Want That Design
4416SM Sheet 7 of 36 PA Upper Floor Plans, prepared by I 27 June 2014
Want That Design
4416SM Sheet 35 of 36 PA 3D Perspectives 1 of 2, prepared 27 June 2014
by I Want That Design
4416SM Sheet 36 of 36 PA 3D Perspectives 2 of 2, prepared 27 June 2014
by I Want That Design
1196-Sk01 Driveway Layout, prepared by 1 July 2014
Contour
3. Development authorised by this approval must be undertaken generally in
accordance with the Approved Plans listed within this Decision Notice.
Building Height
4. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground level.
5. Certification must be submitted to Council from a Licensed Surveyor which
certifies that the buildings do not exceed the maximum height requirement of
this Decision Notice.
Landscaping
6. The development site must be landscaped prior to the commencement of use.
The works must be undertaken in accordance the works shown on the
Approved Plans, except where amended by these conditions.
7. 4 x 45L street trees must be planted within the Nannygai Street frontage. The
trees shall be located so as to allow for adequate sight lines, and be clear of
existing and proposed services within the road reserve, including the footpath.
8. All landscape works must be maintained generally in accordance with the
approved design for the life of the development.
9. All landscape works must be established and maintained in accordance with
horticultural best practice with construction techniques that allow for healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow
to full form.
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of
$20,000 must be submitted to Council, to secure performance of all conditions
of this approval, prior to the pre-start meeting. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less
any costs incurred by Council in respect of enforcing performance of this
permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
Building Appearance
11. All air conditioning units or other mechanical equipment must be located at
ground level, or otherwise fully enclosed or screened such that they are not
visible from the street frontages nor adjoining properties.
Page 8 of 27
Section 9
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
Fencing and Walls
12. Any street fencing must be set back an average of 1 metre from the front
property boundary. Any fencing on the front boundary must either:
a. not exceed a maximum height of 1.2m; or
b. be of open construction.
13. The area of land between the fence and the front property boundary must be
densely landscaped to screen any fencing from the street.
Community Management Statement
14. Any proposed Community Management Statement required for the
development pursuant to the Body Corporate and Community Management Act
1997 must be submitted to Council for endorsement at the same time as
submission of the Building Format Plan (or similar) to Council for compliance
assessment.
15. All clauses and by-laws of the proposed Community Management Statement
must accord with the requirements of this Decision Notice
Waste Management
16. Refuse storage, removal and collection facilities must be provided in
accordance with the following:
a. provision of a minimum of two 240L wheelie bins for each dwelling unit;
b. provision of separate bins for general and recyclable waste for each
tenancy, with an equal number of each being provided; and
c. provision of a hardstand impervious area in accordance with the
approved plan.
Unitywater
17. Reticulated water supply and sewerage must be provided to the development.
18. Construction activities must not impede the access of Unitywater or Fire
Brigade personnel to vital infrastructure (eg. valves, fire hydrants and sewer
access chambers).
19. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 15 litres per second.
20. A single Unitywater installed primary water meter must be provided immediately
inside the property boundary. Meters must be Unitywater approved, installed in
accordance with Unitywater requirements and remain accessible at all times for
reading and maintenance purposes.
21. Sub meters must be provided at the boundary of each title to be administered
by a body corporate.
22. The existing 100mm diameter AC watermain within Nannygai Street must be
replaced for the full frontage of the development site with DICL pipes. The
replacement works must be completed prior to placing construction
materials/site offices over or adjacent to the water main alignment.
23. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ
standards. Easements shall be centred over the pipe. Easement terms shall be
the most current registered dealing held by the Department of Natural
Resources & Mines and shall not be altered or amended.
24. Water meters must be located on alternative boundaries to electrical pillars.
Page 9 of 27
Section 10
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
25. Buildings and other structures must maintain a minimum clearance of 1.5
meters from Unitywater sewer mains, and 1.0 meter from a sewer manhole
chamber or sewer inspection opening.
26. Storm water retention systems and gross pollutant traps must maintain a
minimum clearance of 1.5 meters from Unitywater water supply and sewerage
infrastructure.
27. The applicant must adjust the level of the existing sewerage inspection opening
as necessary to suit the proposed finished levels. Work must be undertaken by
Unitywater at the owner’s cost. Where the existing sewerage inspection
opening point is located within a sealed or concreted parking area, a brass cap
is required to be fitted.
28. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature,
and suitable approved varieties.
29. Construction works undertaken in the vicinity of Unitywater water supply or
sewerage infrastructure must not adversely affect the integrity of the
infrastructure. All costs associated with repair, replacement or alteration of
infrastructure must be met by the applicant.
ENGINEERING
External Works
30. Nannygai Street must be upgraded for the length of its frontage to the subject
site. The works must include in particular:
a. Construction of a pedestrian footpath in accordance with the conditions of
this Decision Notice; and
b. Removal of the existing property accesses, stormwater outlet points and
reinstatement of the kerb, footpath and verge area to match the balance
of the site frontage, including the provision of topsoil and turf where the
existing verge is grassed.
This condition is imposed pursuant to s665 of the Sustainable Planning Act
2009 being non-trunk infrastructure.
Site Access and Driveways
31. A sealed access driveway must be provided from Nannygai Street to all parking
and manoeuvring areas of the development. The works must include in
particular a driveway crossover in accordance with IPWEAQ standard drawing
SEQ R-051with a maximum width of 6 metres at the property boundary.
Car Parking
32. A minimum of 9 car parking spaces must be provided and marked on the site.
The works must include crossfalls, gradients and dimensions in accordance
with Australian Standard AS2890: Parking Facilities
33. All vehicles must enter and exit the site in a forward gear.
Footpath
34. A pedestrian and bicycle footpath must be provided for the development. The
works must include in particular a 2.0 metre wide footpath within the road verge
for the entire length of the site’s frontage to Nannygai Street. This condition is
imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-
trunk infrastructure.
Page 10 of 27
Section 11
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
Stormwater Drainage
35. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge.
36. All stormwater runoff from the site must be discharged in to Council’s kerb and
channel drainage system in Nannygai Street.
37. Approved kerb adapters must be constructed at each outlet point.
38. Electricity and Telecommunication Services
39. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
40. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Earthworks and Retaining Walls
41. All fill and associated batters must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council. All earthworks must be undertaken in accordance with the provisions
of Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments.
42. Where the development involves excavation or filling over, or adjacent to,
drainage, water supply or sewerage infrastructure, all access chamber surface
levels must be adjusted to provide a freeboard of 100mm above the finished
ground surface level.
Damage to Services and Assets
43. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Development Permit for Operational Works (Vehicle Crossover, Landscaping,
Drainage Works and Carparking)
OPERATIONAL WORKS
Approved Plans
1. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
1193-SK01 Driveway Layout, prepared by Contour 1 July 2014
1193-SK03 Stormwater Management Plan, prepared by 7 July 2014
Contour
4416SM PB Stormwater Plan, prepared by I Want That Design 17 July 2014
1193-SK04 A Live Sewer Works Table 2 Sept 2014
CD-001 A Cover Sheet Notes and Schedules, prepared by 3 July 2014
DFS Group
CD-002 A External Works and Planting Plan, prepared by 3 July 2014
DFS Group
CD-003 A Landscape Details, prepared by DFS Group 3 July 2014
Page 11 of 27
Section 12
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
2. Development authorised by this approval must be undertaken generally in
accordance with the Approved Plans listed within this Decision Notice.
Prior to Commencement of Works
3. Council must be contacted at least 5 working days prior to any works
commencing to organise a prestart. The contact number to arrange a pre-start
meeting is 5329 6244. The pre-start meeting must include the relevant parties
for the following aspects of the works:
a. Civil engineering works;
b. Erosion and sediment control works
4. A Construction Management Plan must be submitted to Council prior to the pre-
start meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
ii. Maintenance of safe pedestrian access across the frontage of the
site both during daily construction and after daily construction has
ceased
iii. Proposed fencing to the site during the construction phase of the
development
iv. Adequate parking arrangements for construction workers
b. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures
c. Works programme identifying key components of the works and their
respective durations
d. Establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to advise of
agreed construction times, impacts on traffic and services and other
relevant issues
5. Any conflict between the development and an existing or proposed service
must be referred to the relevant service authority for determination prior to
commencement of works.
During Construction
6. The developer must meet any costs to repair damage to any Council asset
during construction, where damage is a result of the development works.
Damage to assets must be repaired immediately where it creates a hazard to
the community. In circumstances where the damage does not create a hazard
to the community, it must be repaired immediately on completion of the works
associated with the development. A condition report including photographs of
the frontage of the site should be completed and submitted to Council at the
prestart meeting or prior to any works commencing (where no prestart meeting
is to occur).
Page 12 of 27
Section 13
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
7. All works must be supervised by a Registered Professional Engineer of
Queensland (RPEQ) who is independent of the Developer and Principal
Contractor, and they must certify that all works conform to the Operational
Works permit. Where municipal works are involved, such confirmation must be
submitted for the respective hold points prior to any site inspection by Council
Officers.
8. All works must be constructed and work procedure undertaken in accordance
with:
a. The approved plans/documents and conditions detailed in this Decision
Notice
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines
c. The latest version of the Healthy Waterways document “Water Sensitive
Urban Design Technical Design Guidelines for South East Queensland”
for all water quality devices to be constructed on site
Works Within Road Reserve/Reinstatement
9. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out
construction works, Council’s Engineering Officer must be notified prior to the
proposed closure and all requirements complied with.
10. All frontage works must match neatly with existing road and verge/footpath
features. Additional works beyond the frontage may be required to provide an
acceptable transition to existing road and verge/footpath profiles.
Pathways
11. All pathways must be constructed in accordance with the following
requirements:
a. All footpath/cycleway must comply with Council’s Standard Drawing SEQ
R-065.
b. All paths must have a slip resistant surface
c. Expansion and contraction joints must provide a flush finish. Installation of
joints by saw cutting is preferred to ensure a smooth ride for cyclists
d. The required work includes any modifications to ensure the footpath
finishes flush with all existing service covers and the like, or alternatively
these services are raised or altered, so as not to create a pedestrian
safety hazard
12. Pathways must:
a. terminate in a manner that ensures smooth transition to existing surfaces
for public safety
b. be designed and constructed to comply with the Disability Discrimination
Act (DDA), Access to Premises Standard, Austroads and relevant
sections of AS1428 Design for access and mobility
Site Access and Driveways
13. Any existing unnecessary or redundant property accesses must be removed,
and the kerb, footpath and verge area reinstated to match the existing footpath
and/or verge treatments. Grassed verge areas to be reinstated must be
provided with 100 mm topsoil and grass seed or turf, and must be maintained
by the developer until established.
Page 13 of 27
Section 14
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
14. The driveway must be constructed so as not to concentrate stormwater runoff
onto neighbouring properties or cause ponding of water within the road reserve
Earthworks
15. The finished surface level of the site must be graded and shaped to ensure that
all surface runoff is directed to Nannygai Street and not directed on to any
adjoining property.
16. All earthworks shall be undertaken in accordance with the provisions of AS
3798 Guidelines on Earthworks for Commercial and Residential Development.
Certification shall be provided by an RPEQ and submitted to Council the issue
of the Certificate of Classification for the building.
Service Conduits under Existing Road Features
17. Electrical conduits or other services proposed to be installed under existing
sealed carriageways, concrete pathways or concrete/sealed driveways must be
installed by boring. Trenching is not permitted, unless specifically approved by
Council.
Erosion and Sediment Control
18. Prescribed Water Contaminants (as defined in the Environmental Protection Act
1994) must not be released from the site or to waters within the site, or be likely
to be released should rainfall occur, unless all reasonable and practicable
measures are taken to prevent or minimise the release and concentration of
contamination.
19. Erosion and sediment control measures must be installed and maintained to
minimise erosion on the site and to minimise the export of sediment and
associated pollutants from the site. The erosion and sediment control measures
must be designed, installed and maintained in accordance with current best
practice standards (refer to advisory notes).
20. Prior to the issue of the Certificate of Classification, all site surfaces must be
effectively stabilised using methods which have achieved effective short-term
stabilisation and which will continue to achieve effective stabilisation in the
medium to long-term (refer to advisory notes). For the purpose of this condition,
an effectively stabilised surface is defined as one that does not, or is not likely
to result in visible evidence of soil loss caused by sheet, rill or gully erosion or
lead to sedimentation, or lead to water contamination.
21. Any exposed areas must be effectively stabilised without delay and prior to
rainfall occurring.
Supervision/Certification
22. Upon completion of the work a certificate must be issued by an RPEQ certifying
that the works have been constructed in accordance with the Operational
Works permit.
23. All municipal works must be accepted ‘On Maintenance’ by Council in
accordance with Council’s relevant Planning Scheme Policy prior to plan
sealing. To achieve ‘On Maintenance’, the supervising RPEQ must submit to
council:
a. certification that all works have been undertaken and completed in
accordance with the requirements of this Permit
b. As Constructed details in accordance with Council’s Planning Scheme
Policy
c. Maintenance and operational manuals for all proprietary devices
Page 14 of 27
Section 15
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
As Constructed Plans
24. Prior to acceptance of civil works to become Council assets “On Maintenance”,
the lodgement of satisfactory “As Constructed” records must be submitted to
Council. The “As Constructed” information must include:
a. Drawings and data certified by a qualified experienced Civil Engineer
(RPEQ) for design intent, and certified by a Licensed Surveyor in regard
to the cadastre and the location, level and type of all services and
structures.
b. The data must be in accordance with Council’s (Noosa Plan) – Planning
Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and
Earthworks, and Planning Scheme Policy 6 Engineering Design
Standards – Water and Sewerage and fully detail levels for all
engineering works including but not limited to drainage structures,
finished ground levels and pavement surface levels.
c. The data must be submitted in hardcopy form and digital format (Asset
Design and As Constructed (ADAC)) in GDA94 Zone 56 coordinate
values. Guidelines on the use of ADAC are available at
www.adac.com.au
Landscaping
25. The site must be landscaped in accordance with The Noosa Plan’s Planning
Scheme Policy PSP 3 – Landscaping Plants and Guidelines.
During Construction
26. Landscape General - The following requirements apply to all landscape works:
a. All imported topsoil or ameliorated site soil complies with Australian
Standard AS4419 and/or is appropriate for the proposed plant species.
b. All tree stock must conform to NATSPEC criteria as outlined in Specifying
Trees: a guide to assessment of tree quality.
c. Mulch is to be aged, comprised of leaf and limb of varying sizes, free of
foreign matter including, anthropogenic waste, rock, soil / sediment
contamination and applied to ensure 100mm in depth.
d. All necessary measures must be taken to prevent fire ants (or any stages
of the fire ants life cycle) entering the work site. If fire ants are suspected,
the applicant must contact the Department of Primary Industries &
Fisheries Call Centre on 132523.
e. Landscaping must not obstruct overland flow paths and must include
adequate drainage to minimise ponding. Mulch or any floatable material
must not be located in swales or overland flow paths.
f. Landscaping must not encroach onto kerb and channel, footpaths,
pedestrian or vehicular / circulation areas.
g. Landscaping must not restrict access to service meters.
27. Landscaping of Road Reserves - The following requirements apply to
landscaping within road reserves:
a. Permanent ornamental lighting must not be installed within road reserve.
b. Permanent irrigation must not be installed on road reserve.
c. Vegetation must not be subjected to any hedging maintenance regime
and must be allowed to grow to its natural form.
Page 15 of 27
Section 16
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
28. Turf (verge): The applicant must ensure turf is in accordance with the following:
a. Turf species to be sustainable for local and design conditions without
requiring irrigation.
b. Turf is easily accessible and navigable by ride-on mowers with cutting
decks of 2.1 metres wide.
c. Be free of rocks and debris.
d. Turf is rolled and joined smoothly and level with adjoining surfaces.
e. Turf is pest, weed and disease free.
Following Construction
29. Ongoing maintenance: The site must be maintained to aesthetically compliment
the surrounding local area for the life of the development. The maintenance
must include:
a. Regular mowing, weeding and fertilising of turf verge.
b. Replenishing of mulch to 100mm depth, fertilising and aeration of
landscape areas.
c. Cleaning of all external surfaces including prompt removal of graffiti.
d. Replacement of dead or poorly performing plants.
e. Inspection and assessment of all vegetation such that it does not
adversely affect adjoining property or pedestrians.
f. Remedial action if any vegetation poses a health or safety risk to site
users or adjoining property.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
UNITYWATER
During Construction
30. Water meters must be installed to each lot of the development in accordance
with Unitywater requirements and SEQ Standard Drawings.
31. Electrical pillars must be located on alternative boundaries to water meters.
32. A minimum horizontal clearance of 1.0 metre must be maintained between
stormwater pipes greater than 225mm diameter and Unitywater water supply or
sewerage infrastructure.
33. Stormwater filtration/retention systems and gross pollutant traps must maintain
a minimum of 1.5 metres horizontal clearance from a sewerage main or sewer
house connection point.
34. A minimum of 0.5 metres separation must be maintained between the
outermost edge of sewer access chambers or sewerage mains and the
property boundary.
35. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ
standards. Easements shall be centred over the pipe. Easement terms shall be
the most current registered dealing held by the Department of Natural
Resources & Mines and shall not be altered or amended.
Page 16 of 27
Section 17
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
36. Proposed tree plantings must maintain a minimum horizontal clearance of 1.0
metre from Unitywater water mains and 1.5 metres from Unitywater sewerage
mains. Landscaping plants within these clearances must be low growing when
mature and suitable approved varieties.
37. During the maintenance period the applicant must carry out necessary repairs
to: defects and/or damage of road works; drainage and associated work; water
supply and sewerage reticulation and associated equipment. These repairs
include damage and/or alterations caused by third parties carrying out works
within the development.
38. Construction works undertaken in the vicinity of Unitywater’s existing water
supply or sewerage infrastructure must not adversely affect the integrity of the
infrastructure. All costs associated with repair, replacement or alteration to
existing infrastructure must be met by the applicant.
Prior to issue of certificate of compliance
39. As Constructed drawings shall be lodged in both hardcopy and ADAC digital
format in GDA94 Zone 56 coordinate values. As constructed drawings will be
required prior to works being accepted On Maintenance. The GDA co-
ordinates and AHD levels of all permanent survey marks installed shall be
provided. The surveyed location, meter numbers and readings of water meters
installed by the developer must be included in the as - constructed information.
40. A water meter record sheet must be completed and submitted to Unitywater
prior to works being accepted on-maintenance.
41. Upon completion of the works a certificate must be issued by a RPEQ certifying
that the works have been constructed in accordance with Unitywater standards,
and in compliance with the approved plans and specifications. The works must
be supervised by the Engineer in a planned and timely manner to ensure the
integrity of the certification is upheld.
B. Find the following are sufficient grounds to justify the decision despite the conflict with
the Planning Scheme:
1. The proposal provides for a high level of residential amenity, consistent with the
surrounding development in the area and The Noosa Plan requirements for the
Semi Attached Housing zone;
2. The development is located within convenient access to the major road network
and surrounding shops; and
3. The proposed built form is equivalent to 2 duplex developments, which is
consistent with the permitted development on the site.
4 DEVELOPMENT APPLICATION FOR RECONFIGURING A LOT - 1 LOT INTO 2 LOTS
AND AN ACCESS EASEMENT AT 22 & 23 EDWARD STREET, COORAN REC14/0002
Item not dealt with by Planning & Organisation Committee. Referred to General
N
Committee for consideration.
Reason for referral: Cr Playford disagrees with the Recommendation.
Page 17 of 27
Section 18
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
5 PLANNING & DEVELOPMENT BILL 2014 AND PLANNING & ENVIRONMENT COURT
BILL 2014
That Council note the report by the Manager, Planning & Environment and Strategic
Planner to the Planning & Organisation Committee Meeting dated 16 September 2014 and
request the Chief Executive Officer to make a submission to the draft Planning and
Development Bill 2014 and Planning and Environment Court Bill 2014 generally seeking
that:-
A. The Department of State Development, Infrastructure and Planning undertake
consultation on the draft Planning and Development Regulations and Guidelines
where much of the practical impacts of the legislation changes for the community,
development industry and local governments will be located;
B. Local governments and their communities should continue to retain the ability to
decide through their planning schemes which developments will be required to be
publicly notified and have third party appeal rights;
C. Where an application conflicts with the planning scheme, the onus of proof should be
on the applicant to prove the merits of the proposal and justify the inconsistency
rather than what appears to be an onus on the assessment manager to prove that the
intent of the planning scheme should be upheld;
D. Section 89 of the Planning and Development Bill 2014 be amended to remove the
requirement for local governments to provide a notice to applicants and owners that
their approval will lapse, as this should be the responsibility for applicants and owners
to monitor;
E. A time limit requirement be included for Conversion Applications and Offset
Establishment Cost review requests to be made and undertaken during the period for
a Negotiated Decision Notice to reduce uncertainty for local governments;
F. An allowance be included for Local Governments to index all Infrastructure Charges
from a set base date in accordance with the applicable index to address increasing
infrastructure costs;
G. Councils should have the ability to issue an Infrastructure Charges Notice for minor
changes to development approvals issued prior to 1 July 2011 that involve an
increase to the intensity of the development and for extensions to the currency
period; and
H. Provide within the P&D Bill the ability for local government planning schemes to also
apply to assessment of uses within the local government tidal area/river lease areas
to support improved management of marine activities and address potential impacts
on adjacent foreshores and uses.
6 ADVERTISING EXPENDITURE POLICY REPORT
That Council note the report by the Director Corporate Services to the Planning &
Organisation Committee Meeting dated 16 September 2014 and:
A. Rescind the existing Advertising Expenditure policy that transferred to Council from
the Sunshine Coast Regional Council under the Local Government (De-
amalgamation Implementation) Regulation 2013; and
B. Adopt the new Advertising Expenditure Policy provided in Attachment 1 to the report.
Page 18 of 27
Section 19
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
7 2014/15 NATIONAL COMPETITION POLICY REFORM APPLICATION
That Council note the report by the Director Corporate Services to the Planning &
Organisation Committee Meeting dated 16 September 2014 and
A. Apply the Full Cost Pricing reform option to the Waste Management business activity
for the 2014/15 financial year in accordance with section 44(1)(b) of the Local
Government Act 2009; and
B. Apply the Code of Competitive Conduct to the Holiday Parks business activity for the
2014/15 financial year in accordance with section 47 of the Local Government Act
2009.
8 FINANCIAL PERFORMANCE REPORT AUGUST 2014
That Council note the report by the Manager Financial Services to the Planning &
Organisation Committee Meeting dated 16 September 2014 providing the August monthly
financial report.
9 TELECOMMUNICATION SERVICES UPDATE
That Council note the report by the ICT Operations Officer to the Planning & Organisation
Committee Meeting dated 16 September 2014 providing an update on the progress made
with reviewing Council’s telecommunication services.
10 JULY 2014 RATE LEVY
That Council note the report by the Manager Revenue Services to the Planning &
Organisation Committee Meeting dated 16 September 2014 providing an overview of the
July 2014 Rate Levy.
11 COMMUNITY ENGAGEMENT PROJECT NEWDEMOCRACY FOUNDATION
That Council note the report by the Executive Manager to the Planning & Organisation
Committee Meeting dated 16 September 2014 and
A. Accept the proposal from the newDemocracy Foundation to undertake a community
engagement project utilising the community jury methodology and approve
commencement of the jury selection process; and
B. Provide a further report to Council detailing the topic/s for the community
engagement project and level of authority to be given to the community jury.
Page 19 of 27
Section 20
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
12 CLOSED SESSION ITEM - ACCESS ISSUE WALTER HAY
DRIVE - NOOSA ON WEYBA - PLANNING & ENVIRONMENT COURT APPEAL
(NORTHBROOK) - MCU12.0208
That Council note the report by the Manager, Planning & Environment to the Planning &
Organisation Committee Meeting dated 16 September 2014 regarding access to Walter
Hay Drive – Noosa on Weyba and:
A. Resolve that it regards the proposed roundabout access from Walter Hay Drive to
the subject land as undesirable and that in the event that the development was
approved by the court it would not accept such works;
B. Resolve as the road authority, that it regards the proposed roundabout access in
Walter Hay Drive as contrary to the public interest which requires the preservation
of the efficiency of the road carrying capacity and the speed environment, of Walter
Hay Drive;
C. Resolve that, as the road authority, it will not accept any access proposal to the
development which will have the effect of slowing the speed environment of Walter
Hay Drive as such an outcome is contrary to and likely to undermine Council’s long
term traffic planning objectives for the area; and
D. Instruct Council’s Solicitor for Planning & Environment Court Appeal No 1648/2014
to advise the appellant of Council’s resolution.
Page 20 of 27
Section 21
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
GENERAL COMMITTEE RECOMMENDATIONS
22 SEPTEMBER 2014 – Crs Sandy Bolton, Joe Jurisevic, Noel Playford, Frank Wilkie,
Frank Pardon
Apologies: Cr Tony Wellington and Cr Bob Abbot
The following Recommendations from the General Committee were adopted
without discussion or further amendment.
Council Resolution
Moved: Cr Pardon
Seconded: Cr Bolton
The General Committee recommendations dated 22 September, 2014 be adopted.
Carried.
1 ASSET MANAGEMENT POLICY - FURTHER REPORT
That Council note the report by the Asset Planning Manager to the Infrastructure &
Services Committee Meeting dated 16 September 2014 and the General Committee
Meeting dated 22 September 2014 and:
A. Rescind the existing Asset Management policy that transferred to Council from the
Sunshine Coast Regional Council under the Local Government (De-amalgamation
Implementation) Regulation 2013; and
B. Adopt the new Asset Management Policy shown as Attachment 1 to the report to
General Committee dated 22 September 2014 and authorise the Chief Executive
Officer to put in place administrative guidelines and tools required to implement the
policy.
2 APPLICATION FOR MATERIAL CHANGE OF USE ANIMAL HUSBANDRY TYPE 2 -
INTENSIVE) AND ENVIRONMENTALLY RELEVANT ACTIVITY (ERA 4 - POULTRY
FARMING) SITUATED AT 136 TOP FORESTRY ROAD, RIDGEWOOD MCU12/0184
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 16 September 2014 and defer Application No. MCU12/0184 for
a Development Permit for Material Change of Use (Animal Husbandry Type 2 – Intensive)
and Environmentally Relevant Activity (ERA 4 – Poultry Farming), situated at 136 Top
Forestry Road, Ridgewood and request the applicant to address the following:-
A. Identify measures to mitigate dust nuisance for residents living along Top Forestry
Road and minimise road maintenance requirements such as sealing of Top Forestry
Road;
B Investigate whether an alternative haul route can be used that does not include the
residential streets of Cooroy (Maple Street and Crystal Street) and is suitable for
heavy vehicles;
C. Confirm whether chicken pick-up times can be limited to day time only (6am to 7pm);
D. Identify how unacceptable odour impacts on future residents of 124, 146, 172 and
224 Top Forestry Road may be addressed; and
E. Provide an Infrastructure Agreement that includes all proposed road works and/or
maintenance measures to be undertaken to Top Forestry Road to address road
safety, amenity and maintenance issues and where appropriate odour measures for
124, 146, 172 and 224 Top Forestry Road.
Page 21 of 27
Section 22
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
3 DEVELOPMENT APPLICATION FOR RECONFIGURING A LOT - 1 LOT INTO 2 LOTS
AND AN ACCESS EASEMENT AT 22 & 23 EDWARD STREET, COORAN REC14/0002
That Council note the report by the Senior Development Planner to the Planning &
Organisation Committee Meeting dated 16 September 2014 regarding Application No.
REC14/0002 to Reconfigure a Lot (1 lot into 2 lots and an access easement) and provide a
further report to the Council Ordinary Meeting on 25 September 2014 advising proposed
conditions to support the approval of this application on the basis of a minimum lot size of
2000m2.
Page 22 of 27
Section 23
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
6 ORDINARY MEETING REPORTS
1 DEVELOPMENT APPLICATION FOR RECONFIGURING A LOT - 1 LOT INTO 2
LOTS AND AN ACCESS EASEMENT AT 22 & 23 EDWARD STREET, COORAN
REC14/0002 – FURTHER REPORT DOCUMENT INFOR MATI ON
Council Resolution
Moved: Cr Wilkie
Seconded: Cr Jurisevic
That Council note the reports by the Senior Development Planner to the Planning &
Organisation Committee Meeting dated 16 September 2014 and the Ordinary
Meeting dated 25 September 2014 regarding Application No. REC14/0002 to
Reconfigure a Lot (1 lot into 2 lots and an access easement) and:
A. Approve the application, subject to the following conditions:
PLANNING
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this
Decision Notice must be completed prior to submission of the subdivision
plan to Council for compliance assessment.
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are
listed in the following table and are subject to further amendments by
these conditions.
Plan No. Rev. Plan/Document Name Date
13-3482AD _ Plan of Proposed Reconfiguration of Lot 2 08-07-14
Sheet 1 of 1 on SP155477
Minimum Lot Size
3. Lot 1 shall maintain a minimum lot size of 2,000m2 in accordance with
The Noosa Plan. Prior to the issue of any Development Permit for
Operational Works an amended plan of development must be submitted
to Council demonstrating compliance with this condition.
Lot Numbering
4. All lot numbering on the subdivision plan to be submitted to Council for
compliance assessment must remain as shown on the Approved Plans.
Boundary Encroachments
5. Certification must be submitted to Council from a Licensed Surveyor
which certifies that:
a. the boundary clearances for any existing buildings remaining on the
site comply with the relevant provisions of the planning scheme and
the Building Act 1975, unless varied by this Decision Notice;
b. all constructed access and roadworks (including associated fill
batters and retaining walls) are fully contained within a dedicated
reserve or registered easement;
c. all utility services and connections (eg. electricity,
telecommunications, water, sewerage) are wholly located within the
lot they serve or alternatively included within an easement;
Page 23 of 27
Section 24
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
d. all existing effluent disposal areas are wholly located within the lot
they serve and comply with the boundary setback requirements of
the Plumbing and Drainage Act 2002 and associated codes and
requirements;
e. all retaining walls and structures are fully contained within the lot
they retain;
f. any fill, including fill batters, are wholly contained within the subject
site and not on adjacent properties.
House Site Areas
6. Prior to endorsement of the plan of survey by Council, a plan shall be
submitted to Council identifying a building envelope for the house site and
effluent disposal area/s on Lot 2. To address noise, the house site area/s
shall be greater than 80m from the rail corridor, or alternatively,
positioned outside the 65dB(A) 24hr average equivalent A-weighted
sound pressure level AND 87dB(A) single event maximum sound
pressure level contours emanating from rail noise, as identified in an
acoustic assessment prepared by a suitably qualified person and
approved by Council.
ENGINEERING
Site Access and Driveways
7. A sealed access driveway must be provided from Edward Street for the
full length of the proposed access easement. The works must be
undertaken in accordance with an Operational Works approval and must
include in particular:
a. A 3m wide sealed access extending from the end of the current
formation in Edward Street to the property boundary,
b. A 4m wide sealed access for the full length of the proposed access
easement including a 5.5m wide passing bay located between the
Edward Street frontage and the access to Lots 1 and 2,
c. Sealed access driveways to Lots 1 and 2 extending from the edge
of the shared access driveway to the boundary of Lots 1 and 2, and
d. Underground service conduits for all utility services.
Stormwater Drainage
8. The site must be provided with a stormwater drainage system connecting
to a lawful point of discharge. The works must be undertaken in
accordance with an Operational Works approval and must include in
particular:
a. An interallotment drainage system extending from the boundary of
Lot 1 to James Street;
b. the use of gravity stormwater drainage.
Electricity and Telecommunication Services
9. Reticulated electricity and telecommunication services must be provided
to each lot in accordance with an approval for Operational Works and the
standards and requirements of the relevant service provider.
10. Unless otherwise stipulated by telecommunications legislation at the time
of construction, the development must be provided with all necessary
conduits, pits and pipes to accommodate the future connection of optic
fibre technology telecommunications.
Page 24 of 27
Section 25
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
11. Certification must be submitted to Council from all relevant service
providers which certifies that the development has met the requirements
of this Decision Notice and all applicable legislation at the time of
construction.
Easements
12. An easement for drainage purposes must be registered against the title of
proposed Lot 2 in favour of Council over the land area identified as being
below the 1%AEP flood level on the subject site.
13. For the purpose of this permit the 1%AEP flood level means the 1%AEP
level as described in a current Flood Certificate issued by Council.
14. An easement for access and services purposes must be registered
against the title of the Lot 3 SP155477 in favour of proposed Lots 1 and 2.
The easement must be located generally in accordance with the
approved plan and have a minimum width of 10 metres.
15. An easement for interallotment drainage must be registered against the
title of proposed Lot 2 in favour of proposed Lot 1. The easement must
extend from the common boundary of Lots 1 and 2 to the James Street
frontage.
16. Unless otherwise agreed in writing by the relevant service provider, any
public or third party infrastructure located on the subject site must be
placed within an easement registered against the title of the property.
17. All easements must be designed in accordance with the planning scheme
and granted at no cost to the Grantee. Where the Grantee is Council or a
service authority, the easement documentation must be in accordance
with the Grantee’s standard easement terms. Draft easement
documentation must be submitted to Council for endorsement.
18. All works must be kept clear of any existing or proposed easements on
the subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
19. All fill and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council.
Damage to Services and Assets
20. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle
safety, immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority
for approval.
Page 25 of 27
Section 26
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
UNITYWATER
Important Advisory Note - The following Unitywater conditions are applied in
accordance with the Chapter 4c, part 7 and sections 135 and 140(c) South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect which
are taken to be a water approval for a staged connection. You are entitled to appeal
against the water connection aspects of this application in accordance with section
99BRAY and Chapter 4c, part 4, Divisions 1 and 2 of the South East Queensland
(Distribution and Retail) Restructuring Act 2009. Unitywater can be contacted as
follows:
Phone: 1300 0 Unity (1300 086 489)
Email: [email protected]
Web: www.unitywater.com.
Water Connections
21. Reticulated water must be provided to each lot in the development. This
must include:
a. Ensuring that existing internal water pipes are wholly contained
within the lot they will serve;
b. An approved water meter for each lot in accordance with Unitywater
and SEQ Standard Drawings;
c. Provision of a water service from the existing 150 mm diameter
water main that runs across the lot to service all proposed and
future lots in accordance with Unitywater and SEQ Standard
Drawings.
22. Tree plantings must maintain a minimum horizontal clearance of 1.0
metre from Unitywater water mains. Landscaping plants within these
clearances must be low growing when mature and suitable Unitywater
approved varieties.
23. Written approval to enter and construct must be obtained from the owners
of properties through which external water mains will traverse. This must
include approval for a 3 meter wide easement over the mains, and be
submitted with lodgement of the associated development application for
Operational Works.
24. Construction works undertaken in the vicinity of Unitywater water supply
or sewerage infrastructure must not adversely affect the integrity of the
infrastructure. All costs associated with repair, replacement or alteration
of infrastructure must be met by the applicant.
ADVISORY NOTES
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit
where it is required. Council will not be able to issue a Decision Notice
without receipt of details that the Levy has been paid. QLeave contact:
1800 803 481 (free call) or (07) 3212 6855.
Unitywater
2. Connection to the Unitywater live water supply and live sewerage system
must be undertaken by Unitywater at the applicant’s cost.
B. Apply the following property note to new Lot 2:
1. Building Envelope/s have been specified for this property for the
construction of a house or any habitable buildings. Details can be
obtained from Council.
Page 26 of 27
Section 27
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
7 PETITIONS
1 PETITION: SUPPORT FOR THE DEVELOPMENT APPLICATION FOR MILLIGANS
CHICKEN FARM PROJECT AT 136 TOP FORESTRY ROAD RIDGEWOOD
Council Resolution
Moved: Cr Jurisevic
Seconded: Cr Cr Bolton
That the e-petition presented by Cr Jurisevic showing support for Milligan’s Chicken
Farm Project be received and referred to the Chief Executive Officer to determine
appropriate action.
Carried.
2 PETITION: REQUEST TO COUNCIL TO APPROVE PLANS TO ESTABLISH A
CHICKEN MEAT FARM AT 136 TOP FORESTRY ROAD RIDGEWOOD
Council Resolution
Moved: Cr Wilkie
Seconded: Cr Pardon
That the petition presented by Cr Wilkie from residents on proposed traffic route
requesting Council to approve plans to establish a chicken meat farm at 136 Top
Forestry Road Ridgewood be received and referred to the Chief Executive Officer to
determine appropriate action
Carried.
8 CLOSED SESSION
Nil.
9 NEXT MEETING
The next Ordinary Meeting will be held on 23 October, 2014 in the Council Chambers,
9 Pelican Street, Tewantin commencing at 6pm.
10 MEETING CLOSURE
The meeting closed at 6.06pm
Page 27 of 27